ML20106E376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20106E376
| number = ML20106E376
| issue date = 10/20/1984
| issue date = 10/20/1984
| title = Forwards Comments on Draft License NPF-23 Transmitted by Tm Novak 841018 Ltr.License Should Be Issued for Full Power. Environ Protection Plan Acceptable
| title = Forwards Comments on Draft License NPF-23 Transmitted by Tm Novak .License Should Be Issued for Full Power. Environ Protection Plan Acceptable
| author name = Tramm T
| author name = Tramm T
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 9363N, NUDOCS 8410290194
| document report number = 9363N, NUDOCS 8410290194
| title reference date = 10-18-1984
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 5
| page count = 5
Line 19: Line 20:
f'~ N Commonwealth Edison
f'~ N Commonwealth Edison
[        ,) One First N!tional Pitt2, Chicago Ilknors f 'g        \ C ' Addrzss R ply to. Post Office Box 767
[        ,) One First N!tional Pitt2, Chicago Ilknors f 'g        \ C ' Addrzss R ply to. Post Office Box 767
               'N        Chicago, Illinois 60690 October 20, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Sub ject:        Byron Generating Station Units 1 and 2 Draft License NPF-23 NRC Docket No. 50-454 Reference (a):              October 18, 1984 letter T. M. Novak to D. L. Farrar
               'N        Chicago, Illinois 60690 October 20, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Sub ject:        Byron Generating Station Units 1 and 2 Draft License NPF-23 NRC Docket No. 50-454 Reference (a):              {{letter dated|date=October 18, 1984|text=October 18, 1984 letter}} T. M. Novak to D. L. Farrar


==Dear Mr. Denton:==
==Dear Mr. Denton:==
Line 36: Line 37:
License Condition'3:    Post-Fuel-Loading Initial Test Program          _
License Condition'3:    Post-Fuel-Loading Initial Test Program          _
The requirement to obtain NRC approval if the test program is delayed should be modified to permit continued operation of the plant at a given power level if the results of the startup tests to that plateau are properly reviewed by Commonwealth Edison and found acceptable within the specified time periods.      Continued power operation during an unexpected delay will not endanger the public health and safety as long as the test results are satisfactory.      For example, a breakdown of secondary side pumps or heat exchangers which imposes a temporary power limitation would raise no new safety issue.
The requirement to obtain NRC approval if the test program is delayed should be modified to permit continued operation of the plant at a given power level if the results of the startup tests to that plateau are properly reviewed by Commonwealth Edison and found acceptable within the specified time periods.      Continued power operation during an unexpected delay will not endanger the public health and safety as long as the test results are satisfactory.      For example, a breakdown of secondary side pumps or heat exchangers which imposes a temporary power limitation would raise no new safety issue.
License Condition 5:    Equipment Qualification The requirement to reevaluate the environmental conditions resulting from a HELB outside containment should be deleted. A preliminary evaluation was provided by letter dated October 18, 1984 from T. R. Tramm to H. R. Denton which contained our commitment to further review of this issue. The results of preliminary evaluations were also provided which indicated that there is reasonable. assurance that the reactor can be operated safely while more detailed analyses are completed and reviewed.
License Condition 5:    Equipment Qualification The requirement to reevaluate the environmental conditions resulting from a HELB outside containment should be deleted. A preliminary evaluation was provided by {{letter dated|date=October 18, 1984|text=letter dated October 18, 1984}} from T. R. Tramm to H. R. Denton which contained our commitment to further review of this issue. The results of preliminary evaluations were also provided which indicated that there is reasonable. assurance that the reactor can be operated safely while more detailed analyses are completed and reviewed.
License Condition 6:    Fire Protection Program Conditions 6(a) and 6(d) should be revised to indicate that our-spproved fire protection program also includes provisions i
License Condition 6:    Fire Protection Program Conditions 6(a) and 6(d) should be revised to indicate that our-spproved fire protection program also includes provisions i


Line 47: Line 48:
the Fire-Protection Report (FPR) which make the report self-consistent and do not alter the conclusions of the analysis of fire hazards. For example,.the current report contains figures which identify certain-exterior walls as fire barriers. Where the analyses discussed in the FPR show that fire protection is adequate without these fire barriers, we do not intend to maintain these walls as fire barriers. The figures in the FPR will be revised but no additional NRC review needs to be performed.
the Fire-Protection Report (FPR) which make the report self-consistent and do not alter the conclusions of the analysis of fire hazards. For example,.the current report contains figures which identify certain-exterior walls as fire barriers. Where the analyses discussed in the FPR show that fire protection is adequate without these fire barriers, we do not intend to maintain these walls as fire barriers. The figures in the FPR will be revised but no additional NRC review needs to be performed.
License Condition 7:  Control Room Human Factors This Condition should be revised to specify panels 1PM07J and 1PM05J rather than IPM07J and IPM05J.
License Condition 7:  Control Room Human Factors This Condition should be revised to specify panels 1PM07J and 1PM05J rather than IPM07J and IPM05J.
License Condition 9:  TMI Item II.F.1 This Condition should be revised to require operability of the. iodine / particulate sampling system through the first refueling cycle. By letter dated August 17, 1984 from T. R. Tramm to H. R.
License Condition 9:  TMI Item II.F.1 This Condition should be revised to require operability of the. iodine / particulate sampling system through the first refueling cycle. By {{letter dated|date=August 17, 1984|text=letter dated August 17, 1984}} from T. R. Tramm to H. R.
Denton we are committed to resolution of questions arising from recent research regarding the adequacy of these systems.
Denton we are committed to resolution of questions arising from recent research regarding the adequacy of these systems.
License Condition 11:    Emergency Planning
License Condition 11:    Emergency Planning
Line 62: Line 63:
License Condition 18:        Control Room Ventilation Systems This Cendition should be revised to delete reference to the filters in the recirculation portion of the control room ventilation system. Modifications to this system have been discussed with the
License Condition 18:        Control Room Ventilation Systems This Cendition should be revised to delete reference to the filters in the recirculation portion of the control room ventilation system. Modifications to this system have been discussed with the
         .NRC Staff which would make consideration of these charcoal filters unnecessary in evaluations of accident doses.
         .NRC Staff which would make consideration of these charcoal filters unnecessary in evaluations of accident doses.
License Condition 19:        Turbine Missiles This Condition should be deleted.      By letter dated September 26, 1984, from T. R. Tramm to H. R. Denton, Commonwealth Edison committed to a program of turbine maintenance which includes inspection of all three low pressure turbine rotors within the first 3 and 1/2 operating years based on 'nanufacturer's calculations.
License Condition 19:        Turbine Missiles This Condition should be deleted.      By {{letter dated|date=September 26, 1984|text=letter dated September 26, 1984}}, from T. R. Tramm to H. R. Denton, Commonwealth Edison committed to a program of turbine maintenance which includes inspection of all three low pressure turbine rotors within the first 3 and 1/2 operating years based on 'nanufacturer's calculations.
Subsequent interva.ls will also be based upon the manufacturer,s calculations.
Subsequent interva.ls will also be based upon the manufacturer,s calculations.
License Condition 20:        Steam Generator Tube Rupture This Condition should be deleted.      By letter dated October 1 2 , ~'1 9 8 4 from T. R. Tramm to H. R. Denton, Commonwealth Edison committed'to resolution of outstanding NRC generic questions regarding steam generator tube rupture analyses in conjunction with the owner's group effort. The analytical work is scheduled to be completed by May, 1985. This commitment includes all necessary Technical Specification revisions.
License Condition 20:        Steam Generator Tube Rupture This Condition should be deleted.      By letter dated October 1 2 , ~'1 9 8 4 from T. R. Tramm to H. R. Denton, Commonwealth Edison committed'to resolution of outstanding NRC generic questions regarding steam generator tube rupture analyses in conjunction with the owner's group effort. The analytical work is scheduled to be completed by May, 1985. This commitment includes all necessary Technical Specification revisions.

Latest revision as of 17:53, 23 September 2022

Forwards Comments on Draft License NPF-23 Transmitted by Tm Novak .License Should Be Issued for Full Power. Environ Protection Plan Acceptable
ML20106E376
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/20/1984
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
9363N, NUDOCS 8410290194
Download: ML20106E376 (5)


Text

f'~ N Commonwealth Edison

[ ,) One First N!tional Pitt2, Chicago Ilknors f 'g \ C ' Addrzss R ply to. Post Office Box 767

'N Chicago, Illinois 60690 October 20, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Sub ject: Byron Generating Station Units 1 and 2 Draft License NPF-23 NRC Docket No. 50-454 Reference (a): October 18, 1984 letter T. M. Novak to D. L. Farrar

Dear Mr. Denton:

This letter provides Commonwealth Edison comments on the draft of the Byron 1 license which was sent to us in Reference (a).

We urge that the comments in Attachment A to this letter be carefully considered before the license is finalized.

We are available to discuss these matters in more detail if necessary. Further discussions are needed if any of these comments are not incorporated into the license.

Very truly yours, f g f.A?1==_- -

T. R. Tramm Nuclear Licensing Administrator Attachments 9363N h0hf0 A

Ob Ij

  • I 6

ATTACHMENT A Comments on Draft License a

License Condition 1: Maximum Power Level This license should be issued for the full power level, 3411 megswatts thermal, with 5% limitation pending Commission approval. Such a License Condition would not need revision unless the Commissioners approve operation at less than full power. If only a 5% license is to be issued at this point, the following draft License Conditions are meaningless: 3(c), 3(d), 3(f), 6(d), 6(e),

6(f), 6(g), 7, 8, 9, 11, 13, 16, 18, 20, 21, and 22.

s License Condition 2: Technical Specifications and Environmental Protection Plan Our comments on the Technical Specifications have been provided to the Staff in review meetings. The Environmental Protection Plan is acceptable.

License Condition'3: Post-Fuel-Loading Initial Test Program _

The requirement to obtain NRC approval if the test program is delayed should be modified to permit continued operation of the plant at a given power level if the results of the startup tests to that plateau are properly reviewed by Commonwealth Edison and found acceptable within the specified time periods. Continued power operation during an unexpected delay will not endanger the public health and safety as long as the test results are satisfactory. For example, a breakdown of secondary side pumps or heat exchangers which imposes a temporary power limitation would raise no new safety issue.

License Condition 5: Equipment Qualification The requirement to reevaluate the environmental conditions resulting from a HELB outside containment should be deleted. A preliminary evaluation was provided by letter dated October 18, 1984 from T. R. Tramm to H. R. Denton which contained our commitment to further review of this issue. The results of preliminary evaluations were also provided which indicated that there is reasonable. assurance that the reactor can be operated safely while more detailed analyses are completed and reviewed.

License Condition 6: Fire Protection Program Conditions 6(a) and 6(d) should be revised to indicate that our-spproved fire protection program also includes provisions i

F +

b n described in letters dated August 20, 1984, October 11, 1984 and

' October 15, 1984 from.T. R. Tramm to H. R. Denton.

~

Condition 6(c) should be revised to require that changes to the fire protection program be reported on a schedule consistent with changes which are reported pursuant to 50.59. This will greatly simplify our reporting task and make NRC reporting requirements more uniform.

Condition 6(c) should also be revised to allow for changes 4

the Fire-Protection Report (FPR) which make the report self-consistent and do not alter the conclusions of the analysis of fire hazards. For example,.the current report contains figures which identify certain-exterior walls as fire barriers. Where the analyses discussed in the FPR show that fire protection is adequate without these fire barriers, we do not intend to maintain these walls as fire barriers. The figures in the FPR will be revised but no additional NRC review needs to be performed.

License Condition 7: Control Room Human Factors This Condition should be revised to specify panels 1PM07J and 1PM05J rather than IPM07J and IPM05J.

License Condition 9: TMI Item II.F.1 This Condition should be revised to require operability of the. iodine / particulate sampling system through the first refueling cycle. By letter dated August 17, 1984 from T. R. Tramm to H. R.

Denton we are committed to resolution of questions arising from recent research regarding the adequacy of these systems.

License Condition 11: Emergency Planning

-This Condition should be deleted. All three of these requirements of the ASL8's Initial Decision have been completed.

Letters dated August 16, 1984 from T. R. Tramm to H. R. Denton and.

October 12, 1984 from T. R. Tramm to H. R. Denton provide documentation of the completion of these tasks.

License Condition 12: Reliability of Diesel Generators This Condition should be deleted. By letter dated October 16,.1984 from T. R. Tramm to H. R. Denton we provided the results of our further evaluation of the effects of diesel engine vibration on the panel-mounted controls and instrumentation. No changes were found-toibe necessary.

l

a License Condition 15: Formal FEMA Finding

-This Condition should be deleted. Existing regulations already provide for this eventuality.

License Condition 16: Protection Against Postulated Breaks or Cracks in High Energy and Moderate Energy Lines This Condition should be revised to acknowledge that FSAR Section 3.6.2 is being revised in accordance with commitments made in response to IDI/IDR findings. Advance copies of these FSAR revisions were provided by letter dated October 19, 1984 from T. R.

Tramm to H. R. Denton.

License Condition 18: Control Room Ventilation Systems This Cendition should be revised to delete reference to the filters in the recirculation portion of the control room ventilation system. Modifications to this system have been discussed with the

.NRC Staff which would make consideration of these charcoal filters unnecessary in evaluations of accident doses.

License Condition 19: Turbine Missiles This Condition should be deleted. By letter dated September 26, 1984, from T. R. Tramm to H. R. Denton, Commonwealth Edison committed to a program of turbine maintenance which includes inspection of all three low pressure turbine rotors within the first 3 and 1/2 operating years based on 'nanufacturer's calculations.

Subsequent interva.ls will also be based upon the manufacturer,s calculations.

License Condition 20: Steam Generator Tube Rupture This Condition should be deleted. By letter dated October 1 2 , ~'1 9 8 4 from T. R. Tramm to H. R. Denton, Commonwealth Edison committed'to resolution of outstanding NRC generic questions regarding steam generator tube rupture analyses in conjunction with the owner's group effort. The analytical work is scheduled to be completed by May, 1985. This commitment includes all necessary Technical Specification revisions.

License Condition 21: Reactor Systems Technical Specification This Condition should be deleted. By letter dated October

-11, 1984- from T. R. Tramm to H. R. Denton, Commonwealth Edison b

_4 committed to resolution of outstanding Reactor Systems Branch generic questions .regarding Technical Specifications in con junction with owner's group' efforts. The schedule for completion of this effort is uncertain.

License Condition 22: Energy Absorbing Material We understand that this license condition will be deleted from'this list and added to the list in Attachment 1 which is

' incorporated by License Condition 1.