IR 05000313/1978015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20148G973
| number = ML20148G973
| issue date = 11/03/1978
| issue date = 11/03/1978
| title = Ack Receipt of 781024 Ltr Informing NRC of Steps Taken to Correct Violations During inspec#50-313/78-15 & #50-368/78-23
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations During Inspec 50-313/78-15 & 50-368/78-23
| author name = Madsen G
| author name = Madsen G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7811130313
| document report number = NUDOCS 7811130313
| title reference date = 10-24-1978
| package number = ML20148G977
| package number = ML20148G977
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 21:44, 7 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations During Inspec 50-313/78-15 & 50-368/78-23
ML20148G973
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/03/1978
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20148G977 List:
References
NUDOCS 7811130313
Download: ML20148G973 (2)


Text

.

[ ,

k,0g UNITED STATES NUCLEAR REGULATORY COMMISSION

<

V o REGION IV u

' , j 611 RYAN PLAZA DRIVE, SUITE 1000

November 3,1978

%W. . . . . p'

In Reply Refer To:

Docket No. 50-313/78-15 50-358/78-23 Arkansas Power and Light Company ATTN: Mr. William Cavanaugh III -

Executive Director of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

Thank you for your lettar of October 24, 1978 in response to our letter and Notice of Violation dated October 4,1978. We have no further questions in regard to items 1 and 3 of the subject Notice of Violation and we will review your corrective actions during a future inspectio However, as a result of our review of your response to item 2 of the Notice of Violation, we find that additional information, as discussed with your Mr. Steve Petzel during a telephone call on November 2,1978, is neede Specifically, your response gives the steps you have taken to correct the example cited in item 2 of the Notice of Violation but it does not address the generic issue of ensuring that all required Technical Specification sur-veillance related activities are covered by appropriate procedures. Please reply to this issue by providing to us, within 20 days of your receipt of this letter, the infonnation required by 10 CFR 2, Part 2.201.(a).(2) and

.(3).

With regard to your reply to the deviation noted in paragraph 16 of the subject report, we have no further questions with regard to your corrective actions, subject to our subsequent review. However, we would like to point out the following. The enclosure of your September 17, 1976 letter from D. A. Rueter (AP&L) to V. Stello, Jr. (NRC) indicates in paragraph B.l.(j), page 3, that you are substantially in compliance with Section 0.1.(j) of BTP APCS B9.5-1,

>

which endorses the National Fire Code, NFPA-8 We, therefore, continue to feel that the subject report is correct in stating that you were in deviation from you abuve noted commitment to the NR

Sincerely,

,

.Wh G. L. Madsen, Chief, *

_

Reactor Operations and Nuclear Support Branch

.

E Oc t T rn ,

7 81113 03 g