IR 05000313/1978020

From kanterella
Jump to navigation Jump to search
Inspec Rept 50-313/78-20 & 50-368/78-27 on 781026 During Which NRC Officials Discussed W/Local Officials Lines of Communication W/Nrc,The Status of Subj Facil, & Community Concerns
ML20147G868
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/08/1978
From: Madsen G, Westerman T, Wisner C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20147G862 List:
References
50-313-78-20, 50-368-78-27, NUDOCS 7812270020
Download: ML20147G868 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

. .

O U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

'

REGION IV

Report Nos. 50-313/78-20 50-368/78- :

l Docket Nos. 50-313 License No. DPR-51 50-368 Construction Permit No. CPPR-89/ .

Facility Operating License NPF-6 Licensee: Arkansas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203 l

Facility Name: Arkansas Nuclear One (ANO), Unit Nos.1 and 2 >

Inspection At: ANO Site, Russellville, Arkansas Inspection Conducted: October 26, 1978 I Inspectors: N6

'T. F. Westerman, Resident Inspector M IMNT Date YYGW

'G.~ L. Madse~n, Chief, Reactor Operations and

//lf/76 Date Nuclear Support Branch '

. t

.

..

'

.. Wisner, Pubfic Affairs Officer

-

A .// G 78 Date~/ '

Approved By: N NIvt[C

'G. L. Madsen, Chief, Reactor Operations and

/// #

Date Nuclear Support Branch Inspection Summary:

Information Meeting with Local Public Officials on October 26, 1978 (Report Nos. 50-313/ 78-20; 50-368/ 78-27 )

Areas Inspected: Public officials of London and Russellville, Arkansas were apprised of the mission of the NRC. Key NRC personnel including the Resident J Inspector, were introduced. Discussion with the local officials included lines of communication with the NRC, the status of the Arkansas Nuclear One Site and comunity con:: ern Odo

_ _ _ _ _

_ _____ _______ __________ _________ ____ ____ __ ____________________ ________

. ,

-2-

. DETAILS

^

1. Persons Contacted City of London Fred Woehl, Jr. , Mayor James R. Staggs, Councilman William Green, Consulting Engineer City of Russellville Mike Hickey, Mayor ,

Linda Dare, Councilwonan Roy Faulkner, Councilman Jack Hill, Councilman Pat Humphrey, Councilman ~

Paul Jackson, Councilman Jack Presley, Councilman John Harris, City. Attorney Charles Howell, Council Secretary l

NRC Representatives i

G. L. Madsen,' Chief, Reactor Operations and Nuclear Support Branch, RIV C. E. Wisner, Public Affairs Officer, RIV T. F. Westerman, AN0 Site Resident Inspector, RIV

.

2. Purpose of Meeting The purpose of the meeting was to apprise the London and Russellville city officials of the mission of the Nuclear Regulatory Commission (NRC),

to discuss the inspection and enforcement activities of the Office of Inspection and Enforcement (0IE), and to introduce Mr. T. F. Westerman, the Resident Inspector of the ANO sit '

3. Matters Discussed Organization The organization of the NRC was briefly discussed and organization charts were distributed. The organization was traced from the overall Commission organization down to and including the Region IV organization. Tc.e group was informed of the location and telephone number of the Regional Offic .

_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

. .

-3-The creation of the NRC and Energy Research and Development Administration (ERDA) from the Atomic Energy Commission was discusse Authority of the Office of Inspection and Enforcement to inspect nuclear facilities as it appears in 10 CFR 50.70 was discussed.

l The inspection and enforcement program of OIE was describe Included was a discussion of some of the detailed rules for implementing the regulations that govern the inspection progra c. RIV Inspection program The inspection program, as implemented by the Region IV office,  !

was described in detail. The utilization of a documented program and the mechanism by which enforcement action is processed were explained.

I d. Resident Inspector and His Functions The role of the Resident Inspector in regard to his interface with the licensee, regional office, IE Headquarters and community was describe The fact that the inspector's duty station is now established at I

the ANO site was expressed. The city officials were made aware of his work telephone number and the Region IV telephone numbe e. Information Distribution The officials were made aware of information available in the ,

Washington and the Local Public Document Room (LPDR). The group was appraised of the location of the Local PDR, .

&

s