ML20203J864: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. -.                . ..                                                        --        _            -.        _. --    ._
CommORWealth Etlison
    .                    A3 One First Nabonal Plaz.7, Chicago, Illinois V
Address Peply to: Post Omco Box 767 Chicago, lilinois 60690 - 0767 i                                                                                                  July 25, 1986 d-Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation i        U.S. Nuclear Regulatory Commission
.          Washington, DC 20555
 
==Subject:==
Zion Nuclear Power Station Units 1 and 2 Implementation of Generic Requirements NRC Docket Nos. 50-295 and 50-304
 
==Reference:==
{{letter dated|date=May 1, 1986|text=May 1, 1986 letter}} from J. A. Norris to D. L. Farrar.
i
 
==Dear Mr. Denton:==
 
The referenced letter requested that Conunonwealth Edison Company provide the NRC with the status of a number of generic issues. A list of
!        Multi-Plant Actions (MPA) was provided along with the request. The completed list is attached to this letter.
A number of the MPA descriptions were very cryptic. Thus, in many
:          cases it was impossible to accurately determine the-issue for which information was being sought. No information was provided for those issues
,        and they were designated with a "?".
In addition, commonwealth Edison company cautions any potential users of this list to be wary of possible discrepancies. A strong effort
!          has been made to supply as much information as possible, with approximately 90 man-hours being expended. However, as discussed above, some of the issues were vague and ill-defined and would require a much larger effort to completely research and validate the status. Thus, the best available information was supplied within the time available.
I l                                      If any further questions arise concerning this matter, please i          contact this office.
i' Very truly yours, P. C. LeBlond Nuclear Licensing Administrator j          1m 0o l        cc: Resident Inspector - Zion                                                                                      <l ig l                    J. A. Norris - NRR
;          1907K                            8608060043 860725 PDR                          ADOCK 05000295 p                                              PDR
 
t-1208731-001                  REGULAT0RY INF0RMATION              TRACKING    SYSTEM                      PAGE NO.
* 567 FACILITY          IMPLEMENTATION                                              03/31/86 FACILITY: ZION 1
'LANT LOCATION: 40 MI N OF CHICAGO, ILL            LICENSED P0HER: 3250 MHT            PROJECT MANAGER: J. NORRIS DOCKET NUMBER:  050-00295                          DESIGN POWER:  1940 MHE            BRANCN CHIEF:      S. VARGA LRCH/ ENGINEER:  S&L                                NSSS VENDOR:    HEST                LIC. ASSISTANT:      L. PARRISH
[E INSPECTOR:    M. HOLZMER LIC ACT                    LICENSEE FAC NO. MPA 8                  TITLE                                  COMPLETE              STATUS        jlAlg 106911    A-01  10 CFR 50.55 A(G) - ISI                                08/08/80C            (--        b                        Y 108130    A-02  APPENDIX I - ALARA                                    12/15/85 106554    A-03  SECURITY REVIENS-MODIFIED AMENDMENT PLANS              03/14/79C 108862    A-04  APPENDIX J - CONTAINMENT LEAK TESTING                  09/30/81C            C            s/27/# 5    M 48D 100089    A-07  APPENDIX G - FRACTURE TOUGHNESS                        06/18/79C            C          ' */
* 108988    A-09  PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE        04/22/80C            C.          ' / #'/ U 110741    A-10  CONTINGENCY PLANNING                                  11/17/80C 110/39    A-11  GUARD TRAINING PLANS                                  01/15/81C              f 110745    A-12  VITAL AREA ANALYSIS                                    04/13/82C              [
51367    A-17  INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEri                            P        ITk7 575G    A-18  LECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)      12/30/85              6        sN4[gc Am).96/8d
'9160    A-20  10 CFR 50.62 OPERATING REACTOR REVIENS                N//S /                h        /7EO            N 0777    A-21  10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE                                (          E'7/ N 07908    B-01  DIESEL GENERATOR LOCK 0UT                              09/29/78C              $
OG770    B-02  FIRE PROTECTION                                        03/10/78C              P          '987                          '
08408    B-03  PHR MODERATOR DILUTION                                02/21/79C            I-        I37Y
$00705    B-04  REACTOR VESSEL OVERPRESSURE PROTECTION                04/28/80C              I-      I h07810    B-07  STEAM GENERATOR FEEDHATER FLON INSTABILITY            10/01/79C              ?
08175    B-08  PHR HPSI-LPSI FLOH RESISTANCE                          10/24/84C              [
[    M-        N''                    '
07837    B-09  CHARGING SYSTEMS PIPE VIBRATIONS                      02/19/80C
 
  -1208731-001                                            REOULATORY            INF0RMATION                TRACKING    SYSTEM                      PAGE NO.        568 FACILITY          IMPLEMENTATION                                                    03/51/86 BON 1                                (CONTINUATION)
LIC ACT                        LICENSEE                              1 AC NO. MPA 9                                              TITLE                                COMPLETE                  STATUS      JLQg 08869    B-14 CEA GUIDE TUBE HEAR                                                              10/06/80C                    ?
32129    B-16 EMERGENCY PLANNING AND REVISIONS                                                  05/01/81C                                                j  g 11228      B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS                                    01/22/86C 10278    B-20  CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION                                    08/25/80C                    .
11144    B-21  LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA                                07/13/77C                    ?
.8844    B-22  TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL                                01/22/86C                  b 10061    5-23  DEGRADED GRID VOLTAGE                                                            06/24/82C                  C          3/2M/ fd A"J 9 7[87 10200    B-24  VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H                                08/14/80C                    P 42516    B-24  VENTING AND PURGING CONTAINMENTS HHILE AT FULL PON                                09/28/83C                    P        IM7        Y*'/d 9[o 30239    B-26  INADVERTANT SAFETY INJECTION DURING C00LDOWN                                      12/28/79C                    ?
L:8488    B-39  PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS                                      04/22/80C                    [
C        t9eI        aJ      M/d' 2 01071    B-41  FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S                                03/17/83C 01718      B-42 TMI FOLLOW UP - ALL PLANTS                                                        03/27/81C                  $
h1782      B-43  PHR IEEDHATER LINE CRACKS                                                        02/25/80C                  C          l9 &D 3159    B-43  PHR FEEDHATER LINE CRACKS                                                        05/25/82C p0099      B-44  LESSCNS LEARNED IMPLEMENTATION                                                    03/26/80C                  7 20100      B-44  LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C 30101      5-44  LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C 20102      B-44  LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C                                                              '
20103      B-44  LESSONS LEARNED IMPLEMENTnTION                                                    03/26/80C l
30104      B-44  LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C 30105      B-44 LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C l
30106      B-44 LESSONS LEARNED IMPLEMENTATION                                                    03/26/80C V
 
1208731-001                                            REGULAT0RY                INF0RMATION          TRACKING    SYSTEM                      PA2E NO. 519
;                                                                              FACILITY        IMPLEMENTATION                                              03/31/86 h0N 1                                                  (CONTINUATION)
{
f                                                                                                      LIC ACT                        LICENSEE
$fi_t1 MPA 9                                                TITLE                                    COMPLETE              STATUS            RAIE 30107                B-44                      LESSONS LEARNED IMPLEMENTATION                          03/26/80C                f 60108                B-44                      LESSONS LEARNED IMPLEMENTATION                          03/26edOC                                                          -
0109            B-44                      LESSONS LEARNED IMPLEMENTATION                          05/26/80C 60110                B-44                      LESSONS LEARNED IMPLEMENTATION                          03/26/80C 0111            B-44                      LESSONS LEARNED IMPLEMENTATION                          03/26/80C                                                          ;
60112                B-44                      LESSONS LEARNED IMPLEMENTATION                          03/26/80C 2433            B-44                      LESSONS LEARNED IMPLEMENTATION                          06/02/80C              y 2942            B-45                      NASH 1400 EVENT V, " PRIMARY COOLANT SYSIEM PRESSUR    04/23/81C              ?
2587            B-46                      ANALYSIS OF TURBINE DISC CRACKS                        08/19/81C                P        l9&1    66C twla wp t< e e '
-2692              B-47                      ECCS; CLAD SHELLING AND RUPTURE                        09/12/80C              C          [3 8 l 3007            B-48                      ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE      04/09/81C                [
1885            B-52                      REVIEW OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI      10/15/80C                f 2105            B-57                      DHR CAPABILITY                                          06/22/81C                S 2871            B-59                      MASONRY HALL DESIGN                                    12/30/85                C          IiN 2472            B-60                      ENVIRONMENTAL QUALIFICATION                            11/14/84C              c.          i9 85
    ~)716            B-61                      LOSS OF NON CLASS IE ISC POWER                          07/28/82C                [
2788            B-62                      ESF RESET CONTROL DESIGN DEFICIENCY                    08/10/81C              C.          I 18 O 3899            B-63                      INTERIM PROCEDURES FOR SNORT TERM BLACKOUT              12/15/81C              C.          Ii 7187              B-66                    NATURAL CIRCULATION C00LD0HN                            08/09/83C              C          l3 N
      '859            B-69                    IEB 80-4 MAINSTEAM LINE BREAK HITN CONTINUED FEEDH      01/26/83C              C          I3 EIN 643            B-70                    FATIGUE TRANSIENT LIMIT TS                              05/25/82C              ?
9769              B-72                    NUREG 0737 TECN SPECS (GENERIC LETTER 82-16)            11/01/83C                            [$ 8 7 f
w2814                B-76                    ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION &      07/17/85C N
 
y                                                  _.
t-1208731 -0 01                REGULAT0RY            INF0RHATION          TRACKING        SYSTEM                  PAGE NO.  '570 FACILITY        IMPLEMENTATION                                            03/31/86 EION 1                    (CONTINUATION)
LIC ACT                      LICENSEE FAC NO. MPA #                TITLE                                COMPLETE                STATUS        p_Alg 452895      B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER  12/30/85  }
l 52970    B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU  07/05/85C w                P          1 T8 7 g
'53057 1          B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO  04/30/86  H 53110    B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO            g 453163      B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R  06/20/85C N Nt l
153205      B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC  01/23/85C  I 4 454580      B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-  10/10/85C 453648      B-85 SALEM ATHS 1.2 DATA CAPABILITY                      12/30/85                  f        l    e7 I                                                                              U.
53731    B-86 SALEM ATHS 2.2 S-R COMPONENTS                      03/30/86            -
453814      B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS            07/05/85C    9    p
                                                                                                        '        ?
53897    B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS                04/30/86          3      f D% W 153950      B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS            10/31/86  3 0 q) l                                                                              t-~ U  L.
                                                                                                                /
B-90 SALEM ATHS 4.3 H AND B&W T.S.                                                            IO 455387 l
12/30/85  54 b
f              f Ff 54124    B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES              07/05/85C y 54041    B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES          03/30/86 08258    C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME  04/28/80C                7 108014      C-04 FILTER TECH SPECS                                  08/08/80C                7 08874    C-06 PUMP SUPPORT-LAMELLAR TEARING                      01/27/81C 108876      C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT          03/02/79C              c        I9&2.(.')
l 108475      C-09 PHR AUX FH PUMPS                                    10/31/80C                [
08092    C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE  03/22/84C                c.        1/85 43G37    C-14 AUXILIARY FEEDHATER SEISMIC QUALIFICATION          08/15/83C                C,        I9I3 152285      C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA  06/28/85C                c        7/ & 5 k
 
t-1208731 -0 01                      REGULAT0RY            INF0RMATION          TRACKING SYSTEM                    PAGE NB.:  571 FACILITY          IMPLEMENTATION                                      03/31/86 LION 1                            (CONTINUATION)
LIC ACT              LICENSEE FAC NO. MPA 8                      TITLE                                COMPLETE        STATUS        p_tgg h59003      C-16  UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN      02/28/86C          C.        IiI b 07881    D-02    ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR-      02/16/19C          0 407178      D-03  PRESSURIZER HEATUP RATE ERROR                            01/16/79C                                      7 1
108872      D-10  ASYMMETRIC LOCA LOADS                                    02/01/84C        C-        2.(,(r + 6 cc      -
10004    D-11    FISSION GAS RELEASE                                    02/22/80C          f 408878      D-14  REACTOR VESSEL HELD - HIRE DEFICIENCY                                    C          sjoyjg (, PTS sd.
04/01/80C 412282      D-15  HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL      01/31/84C        k        I"I    ~      "'
443015      D-17    DEFINITION OF OPERABLE                                  06/22/81C        C        J/2.4[d M NN 155920      D-19  DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)      02/28/86C        9          I9I7 197553      E-01  SPENT FUEL POOL EXPANSIONS                              03/29/79C        C          i990 01852    E-02    FUEL CASK DROP                                          04/21/80C 103431      E-05  H N-1 LOOP OPERATION                                    11/15/84C 444066      F-01    I.A.1.1      SHIFT TFCHNICAL ADVISOR                  01/11/82C          P        T/ 8 6 144137      F-02    I.A.1.3      SHIFT MANNING                            06/30/83C        C.          I983 444208      F-03    I.A.2.1      UPGRADING OF R0 AND SRO TRAINING          03/02/82C        C.          I981 44279    F-04    I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC    02/28/85C        C            12./8 j 144349      F-05    I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG      01/30/88          P            I987 4'47203      F-06    I.C.5        FEEDBACK OF OPERATING EXPERIENCE          01/12/82C        C            I301 147335      F-07    I.C.6        CORRECT PERFORMANCE OF OPERATING ACTIVITI 01/12/82C        C            l T 8 2-.
151217 l
F-08    I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA    09/15/86          P            17& P 151297 1
F-09    I.D.2        SAFETY PARAMETER DISPLAY SYSTEM          06/22/84C        C.            I9%Z 44417    F-10    II.B.1      RCS HIGH POINT VENTS                      09/09/83C        C              l3S3 447986      F-11    II.B.2        PLANT SHIELDING                          04/12/83C        C.,          IT83 w
:=>1208731 -0 01                REGULAT0RY              INF0RMATION          TRACKING SYSTEM                    PAGE NO.      572 FACILITY        IMPLEMENTATION                                          03/31/86 IEN 1                      (CONTINUATION)
LIC ACT                LICENSEE AC NO. MPA 0                  TITLE                                  COMPLETE        STATUS        RAJ,g 44487      F-12  II.B.3      POST ACCIDENT SAMPLING                    06/22/84C          C-        9/ 8'S 44558      F-13  II.B.4      TRAINING FOR MITIGATING CORE DAMAGE        05/28/82C          C        INE PCL to if A O 44530      F-14  II.D.1      RV AND SV TRAINING                        01/30/86          C          k 95    4 /ea/75 f  ' /t h 46556      F-15  II.E.1.1 AFH SYSTEM EVALUATION                        01/21/83C        C.          I9N 44700      F-16  II .E.1.2.1 AFH SYSTEM INITI ATION                    04/20/81C 44739      F-17  II.E.1.2.2 AFH SYSTEM FLOH INDICATION                  04/20/81C        (
44826      F-18  II.E.4.1      DEDICATED HYDROGEN PENETRATION          09/17/CIC        C-44897      F-19  II.E.4.2      CONTAINMENT ISOLATION DEPENDABILITY      09/30/82C        C              l381 44918      F-20  II.F.1.1      NOBLE GAS MONITOR                        09/23/81C        P            I98/
45039      F-21  II.F.1.2      IODINE / PARTICULATE SAMPLING            09/23/81C        E            I 45110      F-22  II.F.1.3      CONTAINMENT HIGH RANGE MONITOR          01/08/82C        C            lCf &J 47647      F-23  II.F.1.4      CONTAINMENT PRESSURE INSTRUMENT          09/09/83C        P            i 'l87 47718      F-24  II.F.1.5      CONTAINMENT HATER LEVEL INSTRUMENT      09/09/83C        C_            [ T 8,$
47789      F-25  II.F.1.6      CONTAINMENT HYDROGEN MONITOR            09/09/83C        C_            l q8}
45180      F-26  II.F.2        INSTRUMENTS FOR DETECTION ON INADEQUATE                    p            l q gg 46913      F-30  II.K.2.13    THERMAL-MECHANICAL REPORT                10/26/83C        C            l 9 P4' 47827        F-33 II.K.2.17    POTENTIAL FOR VOIDING IN RCS            01/16/84C        C            l *I b 45257      F-36  II.K.3.1      AUTO PORV ISOLATION                      09/12/83C        C              I3E) 45303        F-37 II.K.3.2      REPORT ON PORV FAILURES                  09/12/83C        C              I3 83 145390      F-38 II.K.3.3      REPORTING SV AND RV FAILURES AND CHALLE  09/17/82C        C              I '[ 8 1 45420        F-39 II.K.3.5      AUTO TRIP OF RCPS                        02/22/83C        C.
45459        F-40 II.K.3.9      PID CONTROLLER                          09/02/81C        C              l3b 45499        F-41 II.K.3.10    ANTICIPATORY TRIP MODIFICATIONS          09/02/81C        C              [ g gl
 
t-12087 31 -0 01                        REGULAT0RY            INF0RMATION          TRACKING SYSTEM                  PAGE NO.      '573 FAC1LITY        IMPLEMENTATION                                    03/31/86 ILN 1                            (CONTINUATION)
LIC ACT              LICENSEE
'AC NO.              MPA 3                TITLE                                COMPLETE        STATUS      RA.[f, 145529                F-42 II.K.3.12    ANTICIPATORY TRIP DN TURBINE TRIP      09/02/81C        C          I3 E l 145577                F-47 II.K.3.17    ECCS OUTAGES                            08/09/83C        C        l3 b 148439                F-53 II.K.3.25    P0HER ON PUMP SEALS                    05/26/82C        C.        I381 145873                F-57 II.K.3.30    SB LOCA METHODS                        06/18/85C        C        6/F5 148214                F-58              COMPLIANCE HITH 10 CFR 50.46                              C-        U85
* 145992                F-63 II.K.3.31 III.A.1.2    TECHNICAL SUPPORT CENTER 01/15/87 12/30/85          P        I Ta 7
                                                                                                                        * "((
145014                F-64 III.A.1.2    OPERATIONAL SUPPORT CENTER              12/30/85        C 145136                F-65 III.A.1.2    EMERGENCY OPERATTONS FACILITY          12/30/85          f        lTI 146208                F-66 III.A.1.2    NUCLEAR DATA LINK                      07/30/82C        C.        I 3 Ell-145280                F-67 III.A.2.1    EMERGENCY PLAN UPGRADE TO MEET RULE    05/16/83C        C.      !9E3 146351                F-68 III.A.2.2    METEOROLOGICAL DATA UPGRADE            12/30/85          P        1 T& 7 145422                F-69 III.D.3.3    IMPLANT RADIATION MONITORING            02/19/82C        C        I3E1 146555                F-70 III.D.3.4    CONTROL ROOM HABITABILITY              06/24/82C        P        Ii3 7 155182                F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOHUP TO    06/30/86        f        I3&7 149583                G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5)          12/30/85        C        [Tf3 L}}

Latest revision as of 10:26, 7 December 2021

Forwards marked-up Regulatory Info Tracking Sys Facility Implementation Listing Providing Status of Generic Issues, Per 860501 Request
ML20203J864
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/25/1986
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-OR, TASK-TM 1907K, NUDOCS 8608060043
Download: ML20203J864 (8)


Text

. -. . .. -- _ -. _. -- ._

CommORWealth Etlison

. A3 One First Nabonal Plaz.7, Chicago, Illinois V

Address Peply to: Post Omco Box 767 Chicago, lilinois 60690 - 0767 i July 25, 1986 d-Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation i U.S. Nuclear Regulatory Commission

. Washington, DC 20555

Subject:

Zion Nuclear Power Station Units 1 and 2 Implementation of Generic Requirements NRC Docket Nos. 50-295 and 50-304

Reference:

May 1, 1986 letter from J. A. Norris to D. L. Farrar.

i

Dear Mr. Denton:

The referenced letter requested that Conunonwealth Edison Company provide the NRC with the status of a number of generic issues. A list of

! Multi-Plant Actions (MPA) was provided along with the request. The completed list is attached to this letter.

A number of the MPA descriptions were very cryptic. Thus, in many

cases it was impossible to accurately determine the-issue for which information was being sought. No information was provided for those issues

, and they were designated with a "?".

In addition, commonwealth Edison company cautions any potential users of this list to be wary of possible discrepancies. A strong effort

! has been made to supply as much information as possible, with approximately 90 man-hours being expended. However, as discussed above, some of the issues were vague and ill-defined and would require a much larger effort to completely research and validate the status. Thus, the best available information was supplied within the time available.

I l If any further questions arise concerning this matter, please i contact this office.

i' Very truly yours, P. C. LeBlond Nuclear Licensing Administrator j 1m 0o l cc: Resident Inspector - Zion <l ig l J. A. Norris - NRR

1907K 8608060043 860725 PDR ADOCK 05000295 p PDR

t-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.

  • 567 FACILITY IMPLEMENTATION 03/31/86 FACILITY: ZION 1

'LANT LOCATION: 40 MI N OF CHICAGO, ILL LICENSED P0HER: 3250 MHT PROJECT MANAGER: J. NORRIS DOCKET NUMBER: 050-00295 DESIGN POWER: 1940 MHE BRANCN CHIEF: S. VARGA LRCH/ ENGINEER: S&L NSSS VENDOR: HEST LIC. ASSISTANT: L. PARRISH

[E INSPECTOR: M. HOLZMER LIC ACT LICENSEE FAC NO. MPA 8 TITLE COMPLETE STATUS jlAlg 106911 A-01 10 CFR 50.55 A(G) - ISI 08/08/80C (-- b Y 108130 A-02 APPENDIX I - ALARA 12/15/85 106554 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 03/14/79C 108862 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 09/30/81C C s/27/# 5 M 48D 100089 A-07 APPENDIX G - FRACTURE TOUGHNESS 06/18/79C C ' */

  • 108988 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 04/22/80C C. ' / #'/ U 110741 A-10 CONTINGENCY PLANNING 11/17/80C 110/39 A-11 GUARD TRAINING PLANS 01/15/81C f 110745 A-12 VITAL AREA ANALYSIS 04/13/82C [

51367 A-17 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEri P ITk7 575G A-18 LECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 12/30/85 6 sN4[gc Am).96/8d

'9160 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S / h /7EO N 0777 A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE ( E'7/ N 07908 B-01 DIESEL GENERATOR LOCK 0UT 09/29/78C $

OG770 B-02 FIRE PROTECTION 03/10/78C P '987 '

08408 B-03 PHR MODERATOR DILUTION 02/21/79C I- I37Y

$00705 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 04/28/80C I- I h07810 B-07 STEAM GENERATOR FEEDHATER FLON INSTABILITY 10/01/79C  ?

08175 B-08 PHR HPSI-LPSI FLOH RESISTANCE 10/24/84C [

[ M- N '

07837 B-09 CHARGING SYSTEMS PIPE VIBRATIONS 02/19/80C

-1208731-001 REOULATORY INF0RMATION TRACKING SYSTEM PAGE NO. 568 FACILITY IMPLEMENTATION 03/51/86 BON 1 (CONTINUATION)

LIC ACT LICENSEE 1 AC NO. MPA 9 TITLE COMPLETE STATUS JLQg 08869 B-14 CEA GUIDE TUBE HEAR 10/06/80C  ?

32129 B-16 EMERGENCY PLANNING AND REVISIONS 05/01/81C j g 11228 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 01/22/86C 10278 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 08/25/80C .

11144 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 07/13/77C  ?

.8844 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 01/22/86C b 10061 5-23 DEGRADED GRID VOLTAGE 06/24/82C C 3/2M/ fd A"J 9 7[87 10200 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H 08/14/80C P 42516 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL PON 09/28/83C P IM7 Y*'/d 9[o 30239 B-26 INADVERTANT SAFETY INJECTION DURING C00LDOWN 12/28/79C  ?

L:8488 B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS 04/22/80C [

C t9eI aJ M/d' 2 01071 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 03/17/83C 01718 B-42 TMI FOLLOW UP - ALL PLANTS 03/27/81C $

h1782 B-43 PHR IEEDHATER LINE CRACKS 02/25/80C C l9 &D 3159 B-43 PHR FEEDHATER LINE CRACKS 05/25/82C p0099 B-44 LESSCNS LEARNED IMPLEMENTATION 03/26/80C 7 20100 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 30101 5-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 20102 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C '

20103 B-44 LESSONS LEARNED IMPLEMENTnTION 03/26/80C l

30104 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 30105 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C l

30106 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C V

1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PA2E NO. 519

FACILITY IMPLEMENTATION 03/31/86 h0N 1 (CONTINUATION)

{

f LIC ACT LICENSEE

$fi_t1 MPA 9 TITLE COMPLETE STATUS RAIE 30107 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C f 60108 B-44 LESSONS LEARNED IMPLEMENTATION 03/26edOC -

0109 B-44 LESSONS LEARNED IMPLEMENTATION 05/26/80C 60110 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0111 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C  ;

60112 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 2433 B-44 LESSONS LEARNED IMPLEMENTATION 06/02/80C y 2942 B-45 NASH 1400 EVENT V, " PRIMARY COOLANT SYSIEM PRESSUR 04/23/81C  ?

2587 B-46 ANALYSIS OF TURBINE DISC CRACKS 08/19/81C P l9&1 66C twla wp t< e e '

-2692 B-47 ECCS; CLAD SHELLING AND RUPTURE 09/12/80C C [3 8 l 3007 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 04/09/81C [

1885 B-52 REVIEW OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 10/15/80C f 2105 B-57 DHR CAPABILITY 06/22/81C S 2871 B-59 MASONRY HALL DESIGN 12/30/85 C IiN 2472 B-60 ENVIRONMENTAL QUALIFICATION 11/14/84C c. i9 85

~)716 B-61 LOSS OF NON CLASS IE ISC POWER 07/28/82C [

2788 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 08/10/81C C. I 18 O 3899 B-63 INTERIM PROCEDURES FOR SNORT TERM BLACKOUT 12/15/81C C. Ii 7187 B-66 NATURAL CIRCULATION C00LD0HN 08/09/83C C l3 N

'859 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITN CONTINUED FEEDH 01/26/83C C I3 EIN 643 B-70 FATIGUE TRANSIENT LIMIT TS 05/25/82C  ?

9769 B-72 NUREG 0737 TECN SPECS (GENERIC LETTER 82-16) 11/01/83C [$ 8 7 f

w2814 B-76 ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION & 07/17/85C N

y _.

t-1208731 -0 01 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO. '570 FACILITY IMPLEMENTATION 03/31/86 EION 1 (CONTINUATION)

LIC ACT LICENSEE FAC NO. MPA # TITLE COMPLETE STATUS p_Alg 452895 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 12/30/85 }

l 52970 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 07/05/85C w P 1 T8 7 g

'53057 1 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 04/30/86 H 53110 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO g 453163 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R 06/20/85C N Nt l

153205 B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC 01/23/85C I 4 454580 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 10/10/85C 453648 B-85 SALEM ATHS 1.2 DATA CAPABILITY 12/30/85 f l e7 I U.

53731 B-86 SALEM ATHS 2.2 S-R COMPONENTS 03/30/86 -

453814 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 07/05/85C 9 p

'  ?

53897 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 04/30/86 3 f D% W 153950 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 10/31/86 3 0 q) l t-~ U L.

/

B-90 SALEM ATHS 4.3 H AND B&W T.S. IO 455387 l

12/30/85 54 b

f f Ff 54124 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 07/05/85C y 54041 B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 03/30/86 08258 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 04/28/80C 7 108014 C-04 FILTER TECH SPECS 08/08/80C 7 08874 C-06 PUMP SUPPORT-LAMELLAR TEARING 01/27/81C 108876 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 03/02/79C c I9&2.(.')

l 108475 C-09 PHR AUX FH PUMPS 10/31/80C [

08092 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 03/22/84C c. 1/85 43G37 C-14 AUXILIARY FEEDHATER SEISMIC QUALIFICATION 08/15/83C C, I9I3 152285 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA 06/28/85C c 7/ & 5 k

t-1208731 -0 01 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NB.: 571 FACILITY IMPLEMENTATION 03/31/86 LION 1 (CONTINUATION)

LIC ACT LICENSEE FAC NO. MPA 8 TITLE COMPLETE STATUS p_tgg h59003 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 02/28/86C C. IiI b 07881 D-02 ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR- 02/16/19C 0 407178 D-03 PRESSURIZER HEATUP RATE ERROR 01/16/79C 7 1

108872 D-10 ASYMMETRIC LOCA LOADS 02/01/84C C- 2.(,(r + 6 cc -

10004 D-11 FISSION GAS RELEASE 02/22/80C f 408878 D-14 REACTOR VESSEL HELD - HIRE DEFICIENCY C sjoyjg (, PTS sd.

04/01/80C 412282 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 01/31/84C k I"I ~ "'

443015 D-17 DEFINITION OF OPERABLE 06/22/81C C J/2.4[d M NN 155920 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 02/28/86C 9 I9I7 197553 E-01 SPENT FUEL POOL EXPANSIONS 03/29/79C C i990 01852 E-02 FUEL CASK DROP 04/21/80C 103431 E-05 H N-1 LOOP OPERATION 11/15/84C 444066 F-01 I.A.1.1 SHIFT TFCHNICAL ADVISOR 01/11/82C P T/ 8 6 144137 F-02 I.A.1.3 SHIFT MANNING 06/30/83C C. I983 444208 F-03 I.A.2.1 UPGRADING OF R0 AND SRO TRAINING 03/02/82C C. I981 44279 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 02/28/85C C 12./8 j 144349 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 01/30/88 P I987 4'47203 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 01/12/82C C I301 147335 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 01/12/82C C l T 8 2-.

151217 l

F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 09/15/86 P 17& P 151297 1

F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 06/22/84C C. I9%Z 44417 F-10 II.B.1 RCS HIGH POINT VENTS 09/09/83C C l3S3 447986 F-11 II.B.2 PLANT SHIELDING 04/12/83C C., IT83 w

=>1208731 -0 01 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 572 FACILITY IMPLEMENTATION 03/31/86 IEN 1 (CONTINUATION)

LIC ACT LICENSEE AC NO. MPA 0 TITLE COMPLETE STATUS RAJ,g 44487 F-12 II.B.3 POST ACCIDENT SAMPLING 06/22/84C C- 9/ 8'S 44558 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 05/28/82C C INE PCL to if A O 44530 F-14 II.D.1 RV AND SV TRAINING 01/30/86 C k 95 4 /ea/75 f ' /t h 46556 F-15 II.E.1.1 AFH SYSTEM EVALUATION 01/21/83C C. I9N 44700 F-16 II .E.1.2.1 AFH SYSTEM INITI ATION 04/20/81C 44739 F-17 II.E.1.2.2 AFH SYSTEM FLOH INDICATION 04/20/81C (

44826 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 09/17/CIC C-44897 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 09/30/82C C l381 44918 F-20 II.F.1.1 NOBLE GAS MONITOR 09/23/81C P I98/

45039 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 09/23/81C E I 45110 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 01/08/82C C lCf &J 47647 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 09/09/83C P i 'l87 47718 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 09/09/83C C_ [ T 8,$

47789 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 09/09/83C C_ l q8}

45180 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE p l q gg 46913 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 10/26/83C C l 9 P4' 47827 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 01/16/84C C l *I b 45257 F-36 II.K.3.1 AUTO PORV ISOLATION 09/12/83C C I3E) 45303 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/12/83C C I3 83 145390 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 09/17/82C C I '[ 8 1 45420 F-39 II.K.3.5 AUTO TRIP OF RCPS 02/22/83C C.

45459 F-40 II.K.3.9 PID CONTROLLER 09/02/81C C l3b 45499 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 09/02/81C C [ g gl

t-12087 31 -0 01 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. '573 FAC1LITY IMPLEMENTATION 03/31/86 ILN 1 (CONTINUATION)

LIC ACT LICENSEE

'AC NO. MPA 3 TITLE COMPLETE STATUS RA.[f, 145529 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 09/02/81C C I3 E l 145577 F-47 II.K.3.17 ECCS OUTAGES 08/09/83C C l3 b 148439 F-53 II.K.3.25 P0HER ON PUMP SEALS 05/26/82C C. I381 145873 F-57 II.K.3.30 SB LOCA METHODS 06/18/85C C 6/F5 148214 F-58 COMPLIANCE HITH 10 CFR 50.46 C- U85

  • "((

145014 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/30/85 C 145136 F-65 III.A.1.2 EMERGENCY OPERATTONS FACILITY 12/30/85 f lTI 146208 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C C. I 3 Ell-145280 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/16/83C C. !9E3 146351 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 12/30/85 P 1 T& 7 145422 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 02/19/82C C I3E1 146555 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 06/24/82C P Ii3 7 155182 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOHUP TO 06/30/86 f I3&7 149583 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 12/30/85 C [Tf3 L