Forwards Revised Zion Station,Fire Hazard Analysis,App a of Branch Technical Position Apcsb 9.5-1
ML20247N903
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/18/1989
From: Trzyna G
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20247N907 List:
References
NUDOCS 8909260341
Download: ML20247N903 (1)


Text

~ fdEestIdams street. C5cEgo, ildncis -

i i

IIdress Reply to: Post Office Box 767

' Chicago. Illinois 60690 - 0767 I

' September _18. 1989 1 /

Mr.. A. Bert Davis Regional Administrator

'U.S. Nuclear Regulatory Ccmmission-Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Zion Nuclear Power Station, Units 1 and 2 License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 Fire Protection Procram

Dear Mr. Davis:

Attached is one copy of the revised Fire Hazards Analysis (FHA) as it.

applies-to Zion Station.

This analysis supercedes the April 1977, submittal

.of the Fire Hazards Analysis section of the Fire Protection Report in Response

'to Appendix A of. Branch Technical Position (BTP) APCSB 9.5-1.

It would be appreciated if this report is forwarded to Mr. J. Holmes of your staff'for his review and retention.

Please direct any questions that.you may have regarding this matter to this' office.

Very truly yours,

/

(

G.E. Trzyna Nuclear Licensing Administrator

/)OO$

/scl:0271T:35 Il cc: US NRC/NRR-Document Control ~ Desk-14 Copy FHA-Chandu Patel-NRR W/o Attachment Senior Resident Inspector-Zion W/o Attachment L

l 8909260341 890918 PDR-- ADOCM 05000295 i

F PNU 1