| Start date | Site | Title | Topic |
---|
ML24095A166 | 30 October 2024 | | Rulemaking - Proposed Rule - Draft Regulatory Analysis Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (Rin 3150-AK31) | Fitness for Duty Probabilistic Risk Assessment Aging Management Process Control Program Exemption Request Earthquake Nuclear Energy Innovation and Modernization Act Backfit |
ML24303A282 | 29 October 2024 | Oyster Creek | License Termination Plan Supplemental Submittal for Technical Bases Documents | |
IR 05000483/2024003 | 23 October 2024 | Callaway | Integrated Inspection Report 05000483/2024003 | Functionality Assessment FLEX Operability Determination Fire Protection Program Integrated Public Alert and Warning System Siren ANS Design Report |
ML24284A196 | 16 October 2024 | Oyster Creek | Enclosure 1 Revised Request for Supplemental Information | |
ML24269A049 | 4 October 2024 | Oyster Creek | Enclosure 1, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Request for Supplemental Information | |
BW240053, Revised 2022 Annual Radioactive Effluent Release Report | 6 September 2024 | Braidwood | Revised 2022 Annual Radioactive Effluent Release Report | Packing leak Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24235A082 | 10 August 2024 | Fort Calhoun | Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 | |
ML24207A089 | 9 August 2024 | 11006611 | Federal Register Notice - Perma-Fix Northwest Richland, Inc., - Export License Application XW033 | |
ML24214A069 | 1 August 2024 | Oyster Creek | Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 | |
ML24214A078 | 1 August 2024 | Oyster Creek | Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 | |
ML24214A061 | 1 August 2024 | Oyster Creek | Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 | |
ML24214A070 | 1 August 2024 | Oyster Creek | Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 | Coatings |
ML24226A090 | 25 July 2024 | 07000925 | Cert Wetland Delineation Report | |
ML24214A079 | 8 July 2024 | Oyster Creek | Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 | |
ML24180A206 | 8 July 2024 | Fort Calhoun | Phase 1 Final Status Survey Reports Request for Additional Information | |
ML24178A125 | 1 July 2024 | 11006605 | Federal Register Notice - Perma-Fix Northwest Richland, Inc - Export License Application | |
RA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld | 28 June 2024 | Robinson | Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld | License Renewal Subsequent License Renewal Pre-submittal |
ML24183A271 | 27 June 2024 | NS Savannah | N.S. Savannah, License Amendment Request No. LAR 2023-01, Response to Requests for Additional Information | Pandemic COVID-19 |
ML24178A040 | 25 June 2024 | Monticello | Comment (1125) E-mail Regarding Monticello SLR Draft EIS | Probabilistic Risk Assessment Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal Power Uprate |
ML24176A028 | 24 June 2024 | | Overview of NRC Cybersecurity Program for Nuclear Surety Workshop | Cyber Security Cyber attack |
ML24161A001 | 9 June 2024 | Calvert Cliffs | Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
NUREG/CR-2907 Volume 27, Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | 31 May 2024 | | NUREG/CR-2907, Vol. 27, Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Chernobyl |
ML24159A235 | 30 May 2024 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 2, Site and Environment | Safe Shutdown Boric Acid High winds Fire Barrier Tornado Missile Operating Basis Earthquake Zebra Mussel Design basis earthquake Annual Radiological Environmental Operating Report Veliger Earthquake Turbine Missile Biofouling Siren |
ML24157A096 | 30 May 2024 | NS Savannah | Nuclear Ship Savannah - License Termination Plan Request for Additional Information | |
ML24155A222 | 28 May 2024 | Prairie Island | Methodology Evaluation Report for Elimination of Response Time Testing Prairie Island Reactor Trip System Rev. 1 | Anticipated operational occurrence High Negative Rate Trip |
ML24135A191 | 14 May 2024 | Monticello | 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24135A192 | 14 May 2024 | Monticello | 2022 Annual Radioactive Effluent Release Report - Errata | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
BVY 24-019, 2023 Radiological Environmental Operating Report | 9 May 2024 | Vermont Yankee | 2023 Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Chernobyl |
BVY 24-018, 2023 Radiological Effluent Release Report | 5 May 2024 | Vermont Yankee | 2023 Radiological Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
RA24-011, 2023 Annual Radiological Environmental Operating Report | 3 May 2024 | LaSalle | 2023 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
BW240019, Annual Radioactive Effluent Release Report | 1 May 2024 | Braidwood | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-2024-078, 2023 Annual Radioactive Effluent Release Report | 1 May 2024 | Seabrook | 2023 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24127A098 | 30 April 2024 | Dresden | Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24039A183 | 30 April 2024 | | U.S. Nuclear Regulatory Commission Review of Nuclear Energy Institute (NEI) Technical Report NEI 22?01, License Termination Process | Offsite Dose Calculation Manual |
LG-24-053, Annual Radioactive Effluent Release Report No. 49 | 30 April 2024 | Limerick | Annual Radioactive Effluent Release Report No. 49 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
3F0424-02, – 2023 Annual Radioactive Effluent Release Report | 29 April 2024 | Crystal River | – 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report | 29 April 2024 | Cook | 2023 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Downpower Unidentified leak |
ML24120A040 | 29 April 2024 | Oyster Creek | Annual Radioactive Effluent Release Report for 2023 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Chernobyl |
SVP-24-029, Radioactive Effluent Release Report for 2023 | 26 April 2024 | Quad Cities | Radioactive Effluent Release Report for 2023 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report | 25 April 2024 | FitzPatrick | 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24116A119 | 25 April 2024 | Byron | 2023 Annual Radioactive Effluent Release Report (ARERR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24130A072 | 25 April 2024 | South Texas | Units and 2 - Updated Safety Analysis Report, Revision 22, List of Effective Pages | |
ML24116A208 | 24 April 2024 | Palo Verde | Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24114A048 | 23 April 2024 | Sequoyah | Annual Radioactive Effluent Release Report for 2023 Monitoring Period | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Power change |
ML24113A095 | 22 April 2024 | Grand Gulf | Annual Radioactive Effluent Release Report for 2023 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24094A214 | 19 April 2024 | Oyster Creek | Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan | |
TXX-2402, (CPNPP) - 2023 Annual Radiological Effluents Release Report | 18 April 2024 | Comanche Peak | (CPNPP) - 2023 Annual Radiological Effluents Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24110A150 | 18 April 2024 | North Anna | Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML24106A049 | 15 April 2024 | Kewaunee | 2023 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24131A097 | 10 April 2024 | Palo Verde | Annual Radiological Environmental Operating Report 2023 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |