IR 05000498/1987050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20237E480
| number = ML20237E480
| issue date = 12/23/1987
| issue date = 12/23/1987
| title = Ack Receipt of 871120 Ltr Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-498/87-50 & 50-499/87-50
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-498/87-50 & 50-499/87-50
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8712290022
| document report number = NUDOCS 8712290022
| title reference date = 11-20-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 16:11, 19 March 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-498/87-50 & 50-499/87-50
ML20237E480
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/23/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8712290022
Download: ML20237E480 (2)


Text

_ _ _ _ _ _ _ - . .-_ _

. _ _ -- -_ _ _ _ - _ _ _ _ _

%

'* -

,

..,..,,..,

.

i

-

1, ..

N, n, 'N In Reply Refer To:

-Dockets: -50-498/87-50 DEC 23 W 50-499/87-50 L

Houston Lighting'& Power' Company ATTN: .J. H.-Goldberg, Group Vice President, Nuclear-P.O. Box 1700 Houston, Texas 77001

.

Gentlemen:

Thank you forJyour letter 'of November 20,~ 1987, in response.to'our l'etter l

'

and Notice of Violation dated October 22, 1987.fWe'have reviewed your repl and find-it responsive to the concerns raised in ourLNotice of Violation. We:

. will review the implementation of your;correctiv'e actionsL during fa futur inspection'to determine that full compliance has been achieved and will<be-maintaine Siiicerely, '

Ori S!nal S!gned .By

'

A.'B. Deach . '

L.-J. Callan, DirectorL Division.of Reactor Projectsi cc:

Houston Lighting & Power Company

' ATTN: M. Wisenberg, Manager-Nuclear Licensing P.O.' Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box 1700 Houston, Texas 77001 RI :D DRP GL table:gb- LJCa'l'an j~,bg /

r jr/2J/87. g l[/2}/87 8712290022971223 PDR ADOCK 05000498 0 4 DCD

= _=______ . -- -__-_- - - .

- _ - _ .

. - .. ,,

,

(

.

Houston Lighting and Power. Company' 2 l

l- Central Power & Light Company

. ATTN: R. L. Range /R. P. Verret P.O. Box ?121 Corpus Christi, Texas 78403 City Public Service Board ATTN: R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio,. Texas 78296 L

l City of Austin L ATTN: M. B. Lee /J. E. Malaski P.O. Box 1088 Austin, Texas 78767-8814 Texas Radiation Control Program Director I

bec to DMB (IE01) - DRP and DRS bcc distrib. by RIV:

  • DRP *RRI-0PS R. D. Martin, RA *RRI-CONS *Section Chief (DRP/D) RPSB-DRSS
  • MIS System *RIV File
  • Lisa'Shea, RM/ALF *RSTS Operator R. Bachmann, OGC- *H.-Bundy
  • P. Kadambi, NRR Project Manager *R.' Taylor
  • TSS *R. Hall
  • DRS D. Powers

!

, *w/766 l

l l

l l

,

- - - -

.

. .

.. .

.

The Light Company n-, use n,m >> u m noo n - i. , ~ ,,ooi aumsmo

_

November 20, 1987 ST-HL-AE- 24 23 File No.: G _ CFR2.201 -

r ,_IK

ii- , ! -

-

j  ; t, U. S. Nuclear Regulatory Commission NOV 211981 -

'

Attention: Document Control Desk --

'

Washington, DC 20555 g - . . -

South Texas Project Unit 1 Docket No. STN 50-498 Response to Notice of Violation 8750-01 Houston Lighting & Power Company has reviewed Notice of Violation 8750-01 dated October 22, 1987 and submits the attached response pursuant to 10CFR 2.20 t If you should have any questions on this matter, please contact Mr. S.M. Head at (512) 972-839 G. E. Vaughn Vice President 3 Nuclear Plant Operations i GEV/SMH/yfw Attachment: Response to Notice of Violation 8750-01 l

1 l l ~

l

.

s 4

\

NL. RESP. NOTICE ',

-

s l I

{pg O/0 3N h' $ b W

. _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

+

.. .

. t .

.

Houston Lighting & Power Co>npany

,

ST-HL- AE- 24 23 File No.: G Page 2 cc:

Regional Administrator, Region IV Nuclear Regulatory Commission  ;

611 Ryan Plaza Drive, Suite 1000 i Arlington, TX 76011'

{

N. Prasad Kadambi, Proj ect Manager U. S. Nuclear Regulatory Commission 7920 Norfolk-Avenue i Bethesda, MD 20814 Dan R. Carpenter Senior Resident Inspector / Operations e/o U. S. Nuclear Regulatory Commission P. O. Box 910 ,

Bay City, TX 77414 J. R. Newman, Esquire i

Newman & Holt:inger, L Street, Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 M. B. Lee /J. E. Malaski City of Austin P. O. Box 1088 Austin, TX 78767-8814 R. J. Costello/M. T. Hardt ~

City Public Service Board j P. O. Box 1771 i San Antonio, TX 76296 l I

'

Rufus S. Scott Associate General Counsel  !

Houston Lighting & Power Company P. O. Box 1700 Houston, TX 77001 Revised 11/17/87

.

n _ _ _ _ _ - ._ _

l

l*e'. -

.

.

l, l l

Attachment I ST-HL-AE-2423 File No.: G Page 1 of 1 ,

South Texas Proj ect l Unit 1 Docket No. STN 50-498 Response to Notice of Violation 8750-01 Statement of Vi,clation Failure To Follow The Approved Procedure For Performing Maintenance

,,

i I l South Texas Project (STP) Technical Specifications (TS), Section l (Administrative Controls), Specification 6.8.1.a requires that written )

procedures shall be established, implemented, and maintained for the {

control of maintenance and repair activities. Plant Procedure OPGP03-ZM-0003 implements the requirements of this TS including a ;

provision .110 wing emergency repairs without the use of an approved l Maintenance Work Request (MVR). j

Contrary to the above, a repair activity was observed on the fuel i handling system transfer cart shear pin in violation of the procedur An MWR had not been approved and the repair work was improperly commenced l

'

on an emergency basis when there was no direct safety hazard to personnel j or equipment which would justify an emergency classificatio i l II. Reason for Violation j I

The root cause for this violation was a lack of understanding on the part )

of the shift supervisors of what constitutes an emergency situation and I when an Emergency MWR could be use III. Corrective Action Taken and Results Achieved At the time of discovery of this situation an appropriate MWR war l initiated to document and correct the proble j IV. Corrective Steps Taken to Prevent Recurrence By procedure, only shift supervisors can authorize an Emergency MW j Accordingly, all shift supervisors have been instructed by plant l management as to intent and proper use of an Emergency MWR. In addition, i the MWR procedure has been revised to add a more explicit definition of when an Emergency MWR can be initiate . Date of Full Compliance

STP is in full compliance at this tim i j NL. RESP. NOTICE

_ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .]