IR 05000348/1988025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_
-
" M*"%'l  SAFEGUARDS INFORMATl04 N'  UNITED STATES
'
,
j .;
  *
NUCLEAR REGULATORY COMMISSION REGION 11 o
101 MARIETTA ST., j[  ATLANTA, GEORGIA 30323 e,,,,
0CT 121988 Report No.: 50-348/88-25 and 50-3u4/88-25 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35291-0400 Docket N, .0-348 and 50-364  License hos.: NPF-2 and NPF-8 Fac, a: Farley 1 and 2 Inspection Conducte : uaust 2^ 26, 1988 Inspector: . M ~
W St ns erry, Physica / ecurity Inspector  Dath 5 % r J Approved by  1,. id D. McGu i re~~Cnief    fgned Physical Securit- Section Nuclear Material Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unan..ounced inspection was conducteG in the areat of Set arity Plan and Implementing Procedures; Management Effectiveness; Security Organization; Re ords and Reports, Testing and Maintenance; Locks, Key and Combinations; Physical Barriers-Protected and Vital
,
Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control-Persona 91 and Packages; Deteccion Aids-Protected and Vital Areas; and Alarni Station Results: One Inspector Followup Item was identified within the 17 areas inspecte Licensee needs to demonstrate back-up power system, g0250295881ot2 o ADOCK 05000348 PNU tuument transmeed Wh om.m.,e.. s ..e
      '"$$N,ocYunt e
SAFEGUARDS INFORMAT1041- ..
}}
}}

Latest revision as of 04:10, 17 December 2020

Partially Withheld Insp Repts 50-348/88-25 & 50-364/88-25 on 880822-26 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Security Plan & Implementing Procedures,Mgt Effectiveness, Security Organization,Records & Repts & Testing & Maint
ML20155J155
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/12/1988
From: Mcguire D, Stanberry W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20155J149 List:
References
50-348-88-25, 50-364-88-25, NUDOCS 8810250295
Download: ML20155J155 (1)


Text

_

-

" M*"%'l SAFEGUARDS INFORMATl04 N' UNITED STATES

'

,

j .;

NUCLEAR REGULATORY COMMISSION REGION 11 o

101 MARIETTA ST., j[ ATLANTA, GEORGIA 30323 e,,,,

0CT 121988 Report No.: 50-348/88-25 and 50-3u4/88-25 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35291-0400 Docket N, .0-348 and 50-364 License hos.: NPF-2 and NPF-8 Fac, a: Farley 1 and 2 Inspection Conducte : uaust 2^ 26, 1988 Inspector: . M ~

W St ns erry, Physica / ecurity Inspector Dath 5 % r J Approved by 1,. id D. McGu i re~~Cnief fgned Physical Securit- Section Nuclear Material Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unan..ounced inspection was conducteG in the areat of Set arity Plan and Implementing Procedures; Management Effectiveness; Security Organization; Re ords and Reports, Testing and Maintenance; Locks, Key and Combinations; Physical Barriers-Protected and Vital

,

Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control-Persona 91 and Packages; Deteccion Aids-Protected and Vital Areas; and Alarni Station Results: One Inspector Followup Item was identified within the 17 areas inspecte Licensee needs to demonstrate back-up power system, g0250295881ot2 o ADOCK 05000348 PNU tuument transmeed Wh om.m.,e.. s ..e

'"$$N,ocYunt e

SAFEGUARDS INFORMAT1041- ..