Forwards Safety Insp Repts 50-456/86-16 & 50-457/86-14 on 860330-0531.No Violation Noted
ML20203D788
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/02/1986
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20203D792 List:
References
NUDOCS 8607210295
Download: ML20203D788 (2)


See also: IR 05000456/1986016

Text

-

  • ,

.

2 JUL 0 2 1986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

! ATTN: Mr. Cordell Reed

Vice President

Fost Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,

W. J. Kropp, T. E. Taylor, M. J. Farber, and P. R. Pelke of this office during

the period of March 30 through May 31, 1986, of activities at the Braidwood

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Mr. E. E. Fitzpatrick

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the i'ispection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

_

0607210295 860702

PDR ADOCK 050004S61

G PDR W. S. Little, Director

Braidwood Project

Enclosure: Inspection Reports

No. 50-456/86016(DRP);

No. 50-457/86014(DRP)

See Attached Distribution

RIII R

I

RIII RIII

rh.

Ik /kst

d

i:arber

w)

Weil is%P

Muffett RIl df~'

Da i on.

aRings Ga%-dner

tt

  • 1l% $$f4 7/iftt y@ htg VW

[

)

\ . Lkc l

--

.

.

Commonwealth Edison Company 2

.

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

. Superintendent

' P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RS8 (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore,-ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Ca11than, ASLB

The Honorable Richard F. Cole, ASLB