Forwards IE Inspec Repts 50-456/78-12 & 50-457/78-12 on 781024-25 During Which No Items of Noncompliance Were Noted
ML20148A089
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/21/1978
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML20148A092 List:
References
NUDOCS 7812280226
Download: ML20148A089 (2)


See also: IR 05000456/1978012

Text

-

t

. -

.

.

c#' *%, UNITED STATES

  • lt NUCLEAR REGULATORY COMMi.,SION

j

.,

l

f-

e -

,

g

REGtON til

799 ROOSEVELT RoAo

1

,

g's oLEN E LLYN, ILLINolS 601'37

NOVY 1 $8

Docket No. 50-456

Docket No.L50-457

i

!

Commonwealth Edison Company

' ATTN: Mr. Byron Lee, Jr. . j

Vice President  !

Post Office Box.767-

Chicago,.IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. E L. Axelson of this

office on October 24 and 25, 1978, of activities at the Braidwood'

Station, Units 1 and 2, authorized by NRC Construction Permits No.

CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. C. McDonough and others of your staff at the conclusion of the  !,

inspection.

.The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and re;;resentative records, observations, and interviews with

personnel.

l- No items of-noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed 1nspection report will be placed in.the

NRC's Public Document Room, except as follows. If this report

contains information that you or your contractors believe to be l

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

l

l

-

0 2Rg (q

.

'

Commonwealth Edison -2- -

Company

7g

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

dB W

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure: IE Inspection

Reports No. 50-456/78-12

l and No. 50-457/78-12

l

[ cc w/ enc 1:

l Mr. R. Cosaro, Project

l Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

s' TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

l

l

1