Insp Repts 50-348/85-24 & 50-364/85-24 on 850511-0610. Violation Noted:Combustible Liquids Found Unattended in Hot Machine Shop Located in Auxiliary Bldg
ML20128L089
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/21/1985
From: Bradford W, Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20128L077 List:
References
50-348-85-24, 50-364-85-24, NUDOCS 8507110236
Download: ML20128L089 (7)


See also: IR 05000348/1985024

Text

. - - - -

. UNITE 3 STATES

/pm af!tigo NUCLEA'l R EOULATORY COMMISSION

  • " #

, REGION il

g j 101 MARIETTA STREET,N.W.

  • * ATLANTA, GEORGI A 30323

\,

.....

/

L

Report Nos.: 50-348/85-24 and 50-364/85-24

, Licensee: Alabama Power Company

- 600 North 18th Street

Birmingham, AL 35291

Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Facility Name: Farley 1 and 2

Inspection Conducted: May 11 - June 10, 1985

Inspector: ktk m d

W. H.~Btidford

ho7//l/S

Date Signed

() N 6/7/!<i8

'

Approved by: c

F. 5. Cantrell, Sedt/lg({hief Ddte Signed

Division of Reactor Projects

SUMMARY

Scope: This routine, announced inspection entailed 169 inspector-hours on site

in the areas of licensee action on previous enforcement matters, monthly sur-

veillance observation, monthly maintenance observation, operational safety

verification, independent inspection effort, and Unit 1 design changes and

maintenance, plant startup and design changes, and engineered safety systems

,

inspection.

Results: One violation was identified. This violation involved failure to

follow approved procedures.

bh348PDR

t

2

- ______ ________ _

l

'

1

.

1

1

I

REPORT DETAILS

1. Persons Contacted

Licensee Employees

J. D. Woodard, Plant Manager

D. N. Morey, Assistant Plant Manager

W. D. Shipman, Assistant Plant Manager

R. D. Hill, Operations Superintendent ,

C. D. Nesbitt, Technical Superintendent i

R. G. Berryhill, Systems Performance and Planning Superintendent

L. A. Ward, Maintenance Superintendent i

L. W. Enfinger, Administrative Superintendent '

J. E. Odom, Operations Sector Supervisor

B. W. Vanlandingham, Operations Sector Supervisor l

T. H. Esteve, Planning Supervisor

J. B. Hudspeth, Document Control Supervisor

L. K. Jones, Material Supervisor

R. H. Marlow, Technical Supervisor

L. M. Stinson, Plant Modification Supervisor

W. G. Ware, Supervisor, Safety Audit Engineering Review

Other licensee employees contacted included technicians, operations per-

sonnel, maintenance and I&C personnel, security force members, and office

personnel.

l

2. Exit Interview '

The inspection scope and findings were summarized during management inter-

views throughout the report period and on June 10, 1985, with the plant

manager and selected members of his staff. The inspection findings were

discussed in detail.

The licensee did not identify as proprietary any materials reviewed by the ,

inspector during this inspection.

3. Licensee Action on Previous Enforcement Matters (92702)

(Closed violation 348,364/85-05,85-05-04) Based on the licensee's letter

of response to the violation which described the corrective action, and an

inspection of the corrective action, this item is closed.

4. MonthlySurveillanceObservation(61726)

The inspectors observed and reviewed Technical Specification required

surveillance testing and verified that testing was performed in accordance

with adequate procedures; that test instrumentation was calibrated; that

.J

- _ _ _ _ _ - - _ _ _ _ - - - - - - - . _ _ _ _ _ _ _ _ _ _ ---- - -------- --_------

_,

9

.

2

limiting conditions were met; that test results met acceptance criteria and

were reviewed by personnel other than the individual directing the test;

that any deficiencies identified during the testing were properly reviewed

and resolved by appropriate management personnel; and that personnel con-

ducting the tests were qualified.

The inspector witnessed / reviewed portions of the following test activities:

STP-80.2 -

Diesel Generator 2C Operability Test.

STP-80.1 - Diesel Generator IB Operability Test.

STP-7.0 -

Unit 2 Quadrant Power Tilt Ratio Calculation.

STP-24.7 - Service Water Valves Inservice Test.

STP-27.3 - Auxiliary and Service Water DC Distribution System

Alignment.

STP-9.0 -

RCS Leakage Test.

STP-33.0A - Solid State Protection System Train A Operability Test.

UDP-1.1 -

Startup of Unit from Cold Shutdown to Hot Standby.

00P-1.2 - Startup of Unit from Hot Standby.

UDP-3.1 -

Power Operation.

Within the areas inspected no violations or deviations were identified.

5. Monthly Maintenance Observation (62703)

Station maintenance activities of safety-related systems and components were

observed / reviewed to ascertain that they were conducted in accordance with

approved procedurer, regulatory guides, industry codes and standards, and

were in conformance with Technical Specifications.

The following items were considered during the review: limiting conditions

for operations were met while components or systems were removed from

service; approvals were obtained prior to initiating the work; activities

were accomplished using approved procedures and were inspected as appli-

cable; functional testing and/or calibrations were performed prior to

returning components or systems to service; quality control records were

maintained; activities were accomplished by qualified personnel; parts and

materials were properly certified; radiological controls were implemented;

and fire prevention controls were implemented.

Work requests were reviewed to determine the status of outstanding jobs to

assure that priority was assigned to safety-related equipment maintenance

which may affect system performance. The following maintenance activities

were observed / reviewed:

Unit 2 RHR Trains A and B Flow Transmitter.

Unit 1 Containment Tendons.

Unit 1 Auxiliary Feedwater Pump Discharge Check Valve.

Unit 1C Boric Acid Purrp.

2B Diesel Generator.

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __. _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

3

Unit 1 Containment Personnel Air Lock.

Auxiliary Feedwater Check Valve Temperature Monitoring System.

Unit 1 Reactor Coolant Drain Tank Pump Sealed Bearings.

Within the areas inspected no violations or deviations were identified.

6. Operational Safety Verification (71707)

l

The inspectors observed control room operations, reviewed applicable logs

and conducted discussions with control room operators during the report

period. The inspectors verified the operability of selected emergency

systems, reviewed tagout records, and verified proper return to service of

affected components. Tours of the auxiliary, diesel, and turbine buildings

were conducted to observe plant equipment conditions, including fluid leaks

and excessive vibrations.

The inspectors verified compliance with selected Limited Condition for

Operations (LCO) and results of selected surveillance tests. The verifi-

cations were accomplished by direct observation of monitoring instrumen-

tation, valve positions, switch positions and review of completed logs,

records, and chemistry results. The licensee's compliance with LCO action

statements was reviewed as they happened.

The following systems and components were observed / verified operational:

-

Station electrical boards in the control room and various electrical

boards throughout the plant for proper electrical alignment.

- Certain accessible hydraulic snubbers.

- Accessible portions of service water and component cooling water

systems.

- Units 1 and 2 suction and discharge piping and valves on auxiliary

feedwater system.

- Diesel generators and support systems.

- Certain accessible portions of CVCS piping and valves to and from the

charging /high head safety injection pumps.

- Certain portions of RHR and containment spray systems.

- Portions of various other systems (safety-related and non-safety-

related).

Within the areas inspected, no violations or deviations were identified.

_ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _

.

.

4

7. IndependentInspectionEffort(92706)

The inspectors routinely attended meetings with certain licensee management

and observed various shift turnovers between shift supervisors, shift

foreman, and licensed operators. These meetings and discussions provided a

daily status of plant operating, maintenance, and testing activities in

progress, as well as discussions of significant problems.

The inspector verified by observation and interviews during the reporting

interval that measures taken to assure the physical protection of the

facility met current requirements. Areas inspected and include the

organization of the security force; the establishment and maintenance of

gates, doors, and isolation zones; that access control and badging were

proper; and procedures were followed.

During the reporting interval, the inspector verified compliance with

selected Limited Conditions for Operation (LCO) and results of selected

surveillance tests. The verifications were accomplished by direct observa-

tion of monitoring instrumentation, valve positions, switch positions and

review of completed logs, records, and chemistry results.

During a plant inspection on May 22, 1985, the inspector found unattended

flammable materials in the hot machine shop in the auxiliary building. This

flammable material consisted of I spray can of Zinc-IT, 2 spray cans of

flammable magnaflux on open metal shelves and several spray cans of

flammable magnaflux inside an open cardboard box in a contaminated area.

The cans of magnaflux were labeled flammable; the can of Zinc-IT was labeled

extremely flamab;e. There were no one in attendance in the hot shop.

Administrative Procedure 35, General Plant Housekeeping and Cleanliness

Control, section 5.1.9 requires that flammable liquids will not be stored

or left unattended in the auxiliary building, diesel generator building or

service water structure at any time.

This is a violation (348/85-24-01).

The licensee initiated corrective action by removing the flammable material

and conducted a survey of all areas.

8. Plant Startup from Refueling and Design Changes

The inspector observed Unit 1 startup and return to service on May 25, 1985.

Various physics tests were observed. The inspector verified the tests were

properly approved and that test personnel were qualified.

The inspector reviewed various system return to service check lists to

verify valves were locked in the proper position and that valve position

verification had been completed.

_ _ _ _ _ .- ___ __

l

f

.

.

5

L The following design changes were reviewed to verify that the modifications

had been reviewed in accordance with 10 CFR 50.59, the work package

contained suitable instructions, that suitable testing was completed prior

to return to service, appropriate drawings and procedures had been revised

and that the modifications had been incorporated into the training programs.

83-1-1412 -

MCB MIMS ALARM.

82-1-1228 -

Sequencers Loss of Voltage and Degraded Grid Tripping.

82-1-1318 - Turbine Driven Auxiliary Feedwater Pump Steam Supply

Valve HV-3226 Limit Switch Replacement.

84-1-2550 -

Modification of Persor.nel Air Lock.

84-1-2518 - Auxiliary Feedwater Check Valve Temperature Monitoring.

80-1-718 - Charging Pump Auto Start.

83-1-1462 - Gama Metrics Excore Neutron Detector.

83-1-1465 - Appendix R - Hot Shutdown Panel.

84-0-2720 - SPDS Computer Room HVAC.

84-1-3-66 -

Steam Generator Anti-vibration Bars.

Within the areas inspected, no violations or deviations were identified.

9. Engineered Safety Systems Inspection

The inspector performed a system inspection of the diesel generators. This

inspection included the engine starting air system, engine jacket cooling

water system, service water system alignment in the diesel generator

building, diesel generator building fire protection and detection system,

diesel generator building ventilation system, electrical switch gear

alignment, annunciator response procedures, operating procedures, operator

logs and housekeeping.

The systems were assessed to be operable in accordance with the Technical

Specifications, appropriate drawings, procedures, and the Final Safety

Analysis Report.

Within the areas inspected, no violations or deviations were identified.

10. In-Office Review

The following items were evaluated by the Reactor Safety, Radiation Safety

and Safeguards, and Reactor Projects regional staff. Based on this review

and the results of the latest Resident and Region based inspection

, - _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _. .__ - _ _ _ _ _ _ _ _ . _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

6

,

activities in the affected functional areas, the following items were

,

determined to require no additional specific followup and are closed.

a. InspectorFollowupItems(IFI):

(80-24-01 Level Switch Terminations (U-2)

(80-32-01 Review Designer TE and VID Evaluation Reports (U-2)

(80-36-09 Functional Controls for Permanent EOF (U-1)

(82-21-01 Appendix J 10 CFR 50 Paragraph VB5 Report of Test Results

(U-1)

(80-48-09 Functional Controls for Permanent EOF (U-2)

(83-26-01 Eliminate Sharp Bends in Sample Lines (U-2)

(83-26-02 Perform Evaluation of Sample Losses (U-2)

(83-26-03 Evaluate Adequacy of Inventory of Operable Survey Meters

(U-2)

(84-30-01) Monitoring Kit Inventory List (U-1 and U-2)

(84-30-02) Sample Identification (U-1 and U-2)

b. UnresolvedItems(URI):

(78-02-01) Discrepancy MET Tower and Administrative Records (U-1 and

U-2)

(80-24-02) Mechanical Separation Requirements (U-2)

(82-16-02) Welding and Cutting Fire Prevention (U-2)

c. Open Item (OPE):

(80-18-05) Updating FSAR to Reflect U-2 As Built Condition (U-2)

>

'

"