ML20128L089
| ML20128L089 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/21/1985 |
| From: | Bradford W, Cantrell F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20128L077 | List: |
| References | |
| 50-348-85-24, 50-364-85-24, NUDOCS 8507110236 | |
| Download: ML20128L089 (7) | |
See also: IR 05000348/1985024
Text
. - -
- -
UNITE 3 STATES
/pm af!tigo
.
NUCLEA'l R EOULATORY COMMISSION
"
REGION il
,
g
j
101 MARIETTA STREET,N.W.
ATLANTA, GEORGI A 30323
\\,
/
.....
L
Report Nos.: 50-348/85-24 and 50-364/85-24
Licensee: Alabama Power Company
,
- 600 North 18th Street
Birmingham, AL 35291
Docket Nos.: 50-348 and 50-364
Facility Name: Farley 1 and 2
Inspection Conducted: May 11 - June 10, 1985
Inspector:
ktk m d
ho7//l/S
W. H.~Btidford
() N
6/7/!<i8
Date Signed
'
Approved by:
c
F. 5. Cantrell, Sedt/lg({hief
Ddte Signed
Division of Reactor Projects
SUMMARY
Scope:
This routine, announced inspection entailed 169 inspector-hours on site
in the areas of licensee action on previous enforcement matters, monthly sur-
veillance observation, monthly maintenance observation, operational safety
verification, independent inspection effort, and Unit 1 design changes and
maintenance, plant startup and design changes, and engineered safety systems
inspection.
,
Results:
One violation was identified.
This violation involved failure to
follow approved procedures.
bh348
t
2
-
______ ________ _
'
.
REPORT DETAILS
1.
Persons Contacted
Licensee Employees
J. D. Woodard, Plant Manager
D. N. Morey, Assistant Plant Manager
W. D. Shipman, Assistant Plant Manager
R. D. Hill, Operations Superintendent
,
C. D. Nesbitt, Technical Superintendent
i
R. G. Berryhill, Systems Performance and Planning Superintendent
L. A. Ward, Maintenance Superintendent
L. W. Enfinger, Administrative Superintendent
'
J. E. Odom, Operations Sector Supervisor
B. W. Vanlandingham, Operations Sector Supervisor
T. H. Esteve, Planning Supervisor
J. B. Hudspeth, Document Control Supervisor
L. K. Jones, Material Supervisor
R. H. Marlow, Technical Supervisor
L. M. Stinson, Plant Modification Supervisor
W. G. Ware, Supervisor, Safety Audit Engineering Review
Other licensee employees contacted included technicians, operations per-
sonnel, maintenance and I&C personnel, security force members, and office
personnel.
2.
Exit Interview
'
The inspection scope and findings were summarized during management inter-
views throughout the report period and on June 10, 1985, with the plant
manager and selected members of his staff.
The inspection findings were
discussed in detail.
The licensee did not identify as proprietary any materials reviewed by the
,
inspector during this inspection.
3.
Licensee Action on Previous Enforcement Matters (92702)
(Closed violation 348,364/85-05,85-05-04) Based on the licensee's letter
of response to the violation which described the corrective action, and an
inspection of the corrective action, this item is closed.
4.
MonthlySurveillanceObservation(61726)
The inspectors observed and reviewed Technical Specification required
surveillance testing and verified that testing was performed in accordance
with adequate procedures; that test instrumentation was calibrated; that
.J
- _ _ _ _ _ - - _ _ _
_
- - - - - - - . _ _ _ _ _ _ _ _ _ _ ---- - -------- --_------
_,
9
.
2
limiting conditions were met; that test results met acceptance criteria and
were reviewed by personnel other than the individual directing the test;
that any deficiencies identified during the testing were properly reviewed
and resolved by appropriate management personnel; and that personnel con-
ducting the tests were qualified.
The inspector witnessed / reviewed portions of the following test activities:
STP-80.2
Diesel Generator 2C Operability Test.
-
Diesel Generator IB Operability Test.
STP-80.1
-
STP-7.0
Unit 2 Quadrant Power Tilt Ratio Calculation.
-
STP-24.7
Service Water Valves Inservice Test.
-
Auxiliary and Service Water DC Distribution System
STP-27.3
-
Alignment.
STP-9.0
RCS Leakage Test.
-
Solid State Protection System Train A Operability Test.
STP-33.0A
-
UDP-1.1
Startup of Unit from Cold Shutdown to Hot Standby.
-
00P-1.2
Startup of Unit from Hot Standby.
-
UDP-3.1
Power Operation.
-
Within the areas inspected no violations or deviations were identified.
5.
Monthly Maintenance Observation (62703)
Station maintenance activities of safety-related systems and components were
observed / reviewed to ascertain that they were conducted in accordance with
approved procedurer, regulatory guides, industry codes and standards, and
were in conformance with Technical Specifications.
The following items were considered during the review:
limiting conditions
for operations were met while components or systems were removed from
service; approvals were obtained prior to initiating the work; activities
were accomplished using approved procedures and were inspected as appli-
cable; functional testing and/or calibrations were performed prior to
returning components or systems to service; quality control records were
maintained; activities were accomplished by qualified personnel; parts and
materials were properly certified; radiological controls were implemented;
and fire prevention controls were implemented.
Work requests were reviewed to determine the status of outstanding jobs to
assure that priority was assigned to safety-related equipment maintenance
which may affect system performance.
The following maintenance activities
were observed / reviewed:
Unit 2 RHR Trains A and B Flow Transmitter.
Unit 1 Containment Tendons.
Unit 1 Auxiliary Feedwater Pump Discharge Check Valve.
Unit 1C Boric Acid Purrp.
2B Diesel Generator.
_ _ _ _ _
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _
_ __.
_ _ _ _ _ _ _ _ _ _
. _ _ _ _ .
_
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
3
Unit 1 Containment Personnel Air Lock.
Auxiliary Feedwater Check Valve Temperature Monitoring System.
Unit 1 Reactor Coolant Drain Tank Pump Sealed Bearings.
Within the areas inspected no violations or deviations were identified.
l
6.
Operational Safety Verification (71707)
The inspectors observed control room operations, reviewed applicable logs
and conducted discussions with control room operators during the report
period.
The inspectors verified the operability of selected emergency
systems, reviewed tagout records, and verified proper return to service of
affected components.
Tours of the auxiliary, diesel, and turbine buildings
were conducted to observe plant equipment conditions, including fluid leaks
and excessive vibrations.
The inspectors verified compliance with selected Limited Condition for
Operations (LCO) and results of selected surveillance tests.
The verifi-
cations were accomplished by direct observation of monitoring instrumen-
tation, valve positions, switch positions and review of completed logs,
records, and chemistry results.
The licensee's compliance with LCO action
statements was reviewed as they happened.
The following systems and components were observed / verified operational:
Station electrical boards in the control room and various electrical
-
boards throughout the plant for proper electrical alignment.
Certain accessible hydraulic snubbers.
-
Accessible portions of service water and component cooling water
-
systems.
Units 1 and 2 suction and discharge piping and valves on auxiliary
-
feedwater system.
Diesel generators and support systems.
-
Certain accessible portions of CVCS piping and valves to and from the
-
charging /high head safety injection pumps.
Certain portions of RHR and containment spray systems.
-
Portions of various other systems (safety-related and non-safety-
-
related).
Within the areas inspected, no violations or deviations were identified.
_ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _
.
.
4
7.
IndependentInspectionEffort(92706)
The inspectors routinely attended meetings with certain licensee management
and observed various shift turnovers between shift supervisors, shift
foreman, and licensed operators.
These meetings and discussions provided a
daily status of plant operating, maintenance, and testing activities in
progress, as well as discussions of significant problems.
The inspector verified by observation and interviews during the reporting
interval that measures taken to assure the physical protection of the
facility met current requirements.
Areas inspected and include the
organization of the security force; the establishment and maintenance of
gates, doors, and isolation zones; that access control and badging were
proper; and procedures were followed.
During the reporting interval, the inspector verified compliance with
selected Limited Conditions for Operation (LCO) and results of selected
surveillance tests.
The verifications were accomplished by direct observa-
tion of monitoring instrumentation, valve positions, switch positions and
review of completed logs, records, and chemistry results.
During a plant inspection on May 22, 1985, the inspector found unattended
flammable materials in the hot machine shop in the auxiliary building. This
flammable material consisted of I spray can of Zinc-IT, 2 spray cans of
flammable magnaflux on open metal shelves and several spray cans of
flammable magnaflux inside an open cardboard box in a contaminated area.
The cans of magnaflux were labeled flammable; the can of Zinc-IT was labeled
extremely flamab;e. There were no one in attendance in the hot shop.
Administrative Procedure 35, General Plant Housekeeping and Cleanliness
Control, section 5.1.9 requires that flammable liquids will not be stored
or left unattended in the auxiliary building, diesel generator building or
service water structure at any time.
This is a violation (348/85-24-01).
The licensee initiated corrective action by removing the flammable material
and conducted a survey of all areas.
8.
Plant Startup from Refueling and Design Changes
The inspector observed Unit 1 startup and return to service on May 25, 1985.
Various physics tests were observed.
The inspector verified the tests were
properly approved and that test personnel were qualified.
The inspector reviewed various system return to service check lists to
verify valves were locked in the proper position and that valve position
verification had been completed.
_ _ _ _ _ .- ___ __
l
f
.
.
5
L
The following design changes were reviewed to verify that the modifications
had been reviewed in accordance with 10 CFR 50.59, the work package
contained suitable instructions, that suitable testing was completed prior
to return to service, appropriate drawings and procedures had been revised
and that the modifications had been incorporated into the training programs.
MCB MIMS ALARM.
83-1-1412
-
Sequencers Loss of Voltage and Degraded Grid Tripping.
82-1-1228
-
Turbine Driven Auxiliary Feedwater Pump Steam Supply
82-1-1318
-
Valve HV-3226 Limit Switch Replacement.
Modification of Persor.nel Air Lock.
84-1-2550
-
Auxiliary Feedwater Check Valve Temperature Monitoring.
84-1-2518
-
Charging Pump Auto Start.
80-1-718
-
Gama Metrics Excore Neutron Detector.
83-1-1462
-
Appendix R - Hot Shutdown Panel.
83-1-1465
-
84-0-2720
-
Steam Generator Anti-vibration Bars.
84-1-3-66
-
Within the areas inspected, no violations or deviations were identified.
9.
Engineered Safety Systems Inspection
The inspector performed a system inspection of the diesel generators. This
inspection included the engine starting air system, engine jacket cooling
water system, service water system alignment in the diesel generator
building, diesel generator building fire protection and detection system,
diesel generator building ventilation system, electrical switch gear
alignment, annunciator response procedures, operating procedures, operator
logs and housekeeping.
The systems were assessed to be operable in accordance with the Technical
Specifications, appropriate drawings, procedures, and the Final Safety
Analysis Report.
Within the areas inspected, no violations or deviations were identified.
10.
In-Office Review
The following items were evaluated by the Reactor Safety, Radiation Safety
and Safeguards, and Reactor Projects regional staff.
Based on this review
and the results of the latest Resident and Region based inspection
,
- _ _ _
. - _ _ _ _ _ _ _ _ _ _ _ _ ___
_ _.
.__
- _ _ _ _
_ _ _ _ . _ - _ _ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
6
,
activities in the affected functional areas, the following items were
determined to require no additional specific followup and are closed.
,
a.
InspectorFollowupItems(IFI):
(80-24-01 Level Switch Terminations (U-2)
(80-32-01 Review Designer TE and VID Evaluation Reports (U-2)
(80-36-09 Functional Controls for Permanent EOF (U-1)
(82-21-01 Appendix J 10 CFR 50 Paragraph VB5 Report of Test Results
(U-1)
(80-48-09 Functional Controls for Permanent EOF (U-2)
(83-26-01 Eliminate Sharp Bends in Sample Lines (U-2)
(83-26-02 Perform Evaluation of Sample Losses (U-2)
(83-26-03 Evaluate Adequacy of Inventory of Operable Survey Meters
(U-2)
(84-30-01) Monitoring Kit Inventory List (U-1 and U-2)
(84-30-02) Sample Identification (U-1 and U-2)
b.
UnresolvedItems(URI):
(78-02-01) Discrepancy MET Tower and Administrative Records (U-1 and
U-2)
(80-24-02) Mechanical Separation Requirements (U-2)
(82-16-02) Welding and Cutting Fire Prevention (U-2)
c.
Open Item (OPE):
(80-18-05) Updating FSAR to Reflect U-2 As Built Condition (U-2)
>
'
"
. .
.