Forwards IE Insp Repts 50-456/82-03 & 50-457/82-03 on 820524-28 & 0601-04 & Notice of Violation
ML20058H852
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/16/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20058H854 List:
References
NUDOCS 8208090091
Download: ML20058H852 (2)


See also: IR 05000456/1982003

Text

,

JUL 1 6 Us2

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This' refers to the special safety inspection conducted by Mr. D. H. Danielson

and other staff members of this office on May 24-28, and June 1-4, 1982, of

activities at Braidwood Station, Units 1 & 2, authorized by NRC Construction

Permits No. CPPR-132 and No. CPPR-133, and to the discussion of our findings

with Messrs. W. J. Shewski, R. Cosaro and others of your staff at the con-

clusion of the inspection.

The purpose of this special team inspection was to assess the adequacy of certain

aspects of the quality assurance / construction activities at the Braidwood Station.

The scope of this assessment included audits of quality assurance program inter-

faces and overview, corrective action systems, design change control, materici

traceability of installed structures and components, riectrical cable installa-

tion, inprocess inspections, and ef fectiveness of quality control inspectors.

Within these areas the inspection consisted of a selective examination of pro-

cedures and representative records, observations, and interviews with personnel.

In general, within the areas inspected, the quality assurance program for the

Braidwood Station appeared good. However, examples of program implementation

deficiencies were identified which require corrective action on your part.

In addition, certain of your activities appeared to be in noncompliance with NRC

, requirements, as specified in the enclosed Appendix. A written response is re-

l quired. No response is required for Item 1.b of the Appendix. The corrective

action taken and the corrective action to prevent recurrence is described in

Section 2.b. (11) of the report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC's Public Document Room. If this report contains any information that you

. (or your contractors) believe to be exempt from disclosure under 10 CFR

9.5(a)(4), it is necessary that you (a) notify this office by telephone within

ten (10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

._

8208090091 820716

PDR ADOCK 05000456

G PDR

L

Commonwealth Edison Company 2

g 10 -

If your receipt of this letter has been delayed such that less than seven-(7)

days are available for your review, please notify this office promptly so that

a new due.date may be established. Consistent with Section 2.790(b)(1), any

.such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for

the claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of

the affidavit. If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter, the enclosures, and your response

to this letter will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

0} . $Y

g7 C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Report

No. 50-456/82-03(DETP)

No. 50-457/82-03(DETP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

V. I. Schlosser, Project

Manager

R. Cosaro, Project

Superintendent

J. F. Gudac, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney Ge al

g [II [

RIII RI I R RIII RIII RIII RIII RI ,

i

NY

Pesche1/jp Los le

&

Neisler

k

.cGregor Da/DffonLIttdh oreliu

nie f

! 6 29/82 4/h/A% 7 y tM gff /J

h

,

,me

ll'Y