Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20206E4561999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Perry Township Fire Dept Ofc ML20206E4631999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Oh EPA Ofc ML20206E4711999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake County Local Emergency Planning Committee ML20206E4741999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake County Sherriffs Dept ML20206E4821999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake Hospital Sys ML20207L4571999-03-11011 March 1999 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Dec,Jan & Feb.Results from Isotopic Analysis,Encl.Rept Is Final Quarterly Rept from Pnpp. Quarterly Isotopic Analysis Will Be Completed & Sent ML18016B1221999-03-0303 March 1999 Informs That Pnpp Has Been Permitted to Use Ferroquest LP7202 as Cw Treatment Additive in Plant CWS to Control Scale ML20206S3541999-01-20020 January 1999 Requests That Pnpp Be Removed from Significant Industrial User List for Lake County & Existing Permit Number 1004911, Terminated ML20198C0791998-12-0909 December 1998 Forwards Quarterly self-monitoring Repts for Pnpp Sanitary Waste Sys for Months of Sept,Oct & Nov 1998.High Oil & Grease Content Discovered in Sample Drawn on 981008, Resulting in One Violation During Quarter ML20151W1731998-09-0909 September 1998 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Months of June,July & Aug 1998.No Violations Occurred During Quarter.Results of Isotopic Analysis,Encl ML20249A0021998-06-11011 June 1998 Forwards NPDES Monthly Rept Forms for Month of May 1998.No Violations Occurred During Time Period ML20249A1871998-06-11011 June 1998 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Months of Mar,Apr & May of 1998.No Violations Occurred During This Quarter.Results of Isotopic Analysis,Encl ML20247J7791998-05-14014 May 1998 Forwards Revised State of Oh Water Withdrawal Facility Registration Annual Rept for Perry Nuclear Power Plant for 1997,correcting Intake Data Previously Submitted ML20247J7341998-05-13013 May 1998 Forwards SPDES Monthly Rept Forms for Month of Apr 1998.No Violations Occurred During Time Period ML20216D4931998-03-10010 March 1998 Requests NPDES Permit Mod Allowing Use of Sodium Hypochlorite or Sodium Bromide Utilized as Biocide in Cooling Tower/Circulating Water Sys.Approval Requested to Support Early Apr Start Date.Info Required Is Attached ML20203G9541998-02-25025 February 1998 Informs That Util Has Enlisted Nalco Chemical Co to Provide Replacement for Scale Inhibitor Product Currently in Use in Plant Circulating Water Sys.Dynacool 1385 Scale Inhibitor/ Dispersant Will Replace Betz Product.Required Info,Encl ML20203D1481998-02-19019 February 1998 Forwards Superfund Amends & Reauthorization Act (Sara), Section 312 Rept for Perry Nuclear Power Plant.Rept Lists Hazardous Substances Stored or Used in Excess of Ten Thousand Pounds ML20203H4771997-12-11011 December 1997 Forwards NPDES Monthly Rept Forms for Nov 1997.No Violations Occurred During Time Period ML20203H3021997-12-10010 December 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Sept,Oct & Nov 1997.No Violations Occurred During This Quarter ML20211P9701997-10-10010 October 1997 Forwards Monthly Rept Forms for Month of Sept 1997.All Required Sample Collected in Accordance W/Npdes Permit Program.Table 1 Re Circulating Water Sys - Monitoring Results Included in Ltr ML20211H5711997-10-0101 October 1997 Informs That Util Will Arrange for Sampling at Least One Wk After Last Addition to Lagoon & Will Transmit Copy of Results to Ofc ML20211B2151997-09-16016 September 1997 Provides Written Confirmation of Prior Notification IAW Part III.12 of NPDES Permit 3IB00016 ML20210U7871997-09-12012 September 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of June,Jul & Aug ML20216J3201997-09-10010 September 1997 Confirms 970903 Telcon,Providing Info Re Drainage of Perry Nuclear Power Plant Circulating Water Sys ML20210J8241997-08-13013 August 1997 Informs That Plant Enlisted Betz Industrial to Perform Molluscicide Treatment on Svc Water Sys,Utilizing Clam-Trol CT-2.Tentative Schedule for Treatment Wk of 970825.Product Info & Required Environ Data Attached ML20210K2281997-08-13013 August 1997 Informs That Perry Nuclear Power Plant Scheduled Essential Maint of Svc Water Sys,Will Occur During Sept & Oct of 1997 ML20141H1331997-07-14014 July 1997 Informs That Maint Is Planned on Pnpp Circulating Water Sys During Refueling Outage Scheduled to Begin in Sept 1997. Product Info Encl for Betz Ferroquest LP7202,calcium Carbonate Scale Remover to Be Added During Maint ML20140C7791997-06-0606 June 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months Mar,Apr & May ML20141E2261997-05-0606 May 1997 Forwards Annual Industrial Wastewater Questionnaire ML20136H9831997-03-13013 March 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Dec,Jan & Feb ML20147E7121997-03-11011 March 1997 Responds to Certified Ltrs & 970106 Which Requested Info Sufficient to Answer Several Questions ML20135A7511997-02-21021 February 1997 Forwards,Iaw Section 312 of Superfund Amends & Reauthorization Act (Sara),Rept for Perry Nuclear Power Plant Indicating Hazardous Substances in Excess of Ten Thousand Pounds ML20134M0951997-02-14014 February 1997 Informs That Pnpp Has Changed from Large Quantity Generator to Small Quantity Generator Status Through Careful Waste Minimization & Chemical Control ML20134J5411997-02-0707 February 1997 Forwards State of Oh Water Withdrawal Facility Registration Annual Rept for Perry Nuclear Power Plant ML20133A9711996-12-19019 December 1996 Forwards Results of Water Supply Performance Evaluation Study 38 for Laboratory at DBNPS ML20132B9241996-12-0606 December 1996 Forwards Quarterly Self Monitoring Repts for Perry Nuclear Power Plant for Months of Sept,Oct & Nov 1996 ML20135E8841996-11-19019 November 1996 Forwards Comments Re Draft NPDES Permit 31B00016*ED & Antidegredation Rule Application ML20129A9591996-10-17017 October 1996 Requests Extension from 961020 to 961120 to Submit Comments Re Draft Permit Renewal for NPDES Permit No 31B000016*DD ML20117N5971996-09-13013 September 1996 Forwards Quarterly Self-Monitoring Repts for Perry NPP Sanitary Waste Sys for Months of June,Jul & Aug.No Violations Occurred ML20117K4561996-09-0303 September 1996 Provides Info Per 960730 Request,Stating in Oct & Nov Licensee Plans to Use Raw Lake Erie Water to Perform Hydrostatic Testing on Three Lengths of Newly Installed SW Piping ML20116M5511996-08-14014 August 1996 Forwards NPDES Monthly Rept Forms for Month of Jul 1996 & Rept Form for Feb 1996 ML20112G2901996-06-0505 June 1996 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Mar,Apr & May ML20117G6241996-05-17017 May 1996 Confirms 960514 Telcon Rept of Unauthorized Discharge Due to Leak in Expansion Joint in Plant Cooling Tower Basin Wall ML20108A3871996-04-23023 April 1996 Forwards Results of Water Supply Performance Evaluation Study 37 (Ws 037) for Lab at Davis-Besse Nuclear Power Station ML20101M9551996-04-0202 April 1996 Submits Ltr to Document No Significant Changes Occurred to Toxic Organics Mgt Plan.Analytical Rept Encl ML20101F3891996-03-20020 March 1996 Documents Info Discussed W/L Barton & M Underwood Re Porous Condition of Fiberglass Cooling Tower Overflow/Blowdown Line ML20101D0981996-03-15015 March 1996 Forwards Quarterly Self-Monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Dec,Jan & Feb, Isotopic Analysis Results & the Industrial Wastewater Questionnaire for 1995 1999-09-30
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20043F4571990-06-0808 June 1990 Forwards NPDES Permit Renewal Application,Including Wastewater Discharge Info,Usgs Map Showing Location of Plant & Associated Outfalls & Line Drawing of Water Flow at Plant Site.W/One Oversize Map ML20005G1701990-01-10010 January 1990 Forwards Responses to 891212 Questionnaire Re Release of Sodium Hypochlorite (Spill 10-43-4117) from Plant on 891025. Caused by Improper Shutdown of Svc Water Chlorination Sys. On-the-job & Classroom Training Will Be Provided ML20245L4341989-08-17017 August 1989 Forwards Us EPA Accidental Release Prevention Questionnaire Initial Rept Re 890320 Ammonia Release at Plant ML20236W7251987-11-15015 November 1987 Expresses Concern Re Participation in Emergency Response to Radiological Accident at Plant.Bus Drivers Would Not Participate in Evacuation Until Concerns Have Been Addressed by Proper Authorities.Newspaper Clipping Encl ML20214G5301987-05-13013 May 1987 Forwards Certified Resolution 1987-31 Passed by Council of City of Mayfield Heights,Oh on 870511 Re Rate Increase Request by Cleveland Electric Illuminating Co to Puc of Oh. Served on 870520 ML20215B9711986-12-0606 December 1986 Forwards Wastewater Rept for Nov 1986. No Discharge Recorded at Outfall 602.North Basin Required Month of Nov for Refilling.Outfall 001 Wastewater Rept Will Be Provided in Dec 1986 Rept ML20214D2491986-11-11011 November 1986 Forwards Discharge Monitoring Rept for Oct 1986.Settling Basins Isolated from Station Discharge Following 860821 Incident.Sampling at Station Discharge Continued Until 860917 to Verify That No Pcb Discharged Into Lake Erie ML20213G8531986-11-10010 November 1986 Forwards Wastewater Rept for Oct 1986. Normal Operation of Waste Treatment Facility & Settling Basins Commenced on 861106 ML20206U7561986-09-30030 September 1986 Forwards Resolution Requesting Delay in Startup of Facility at 100% Capacity for Review Submittal Should Be Forwarded to Special Committee Investigating Safety of Facility.Served on 861007 ML20141E7291986-04-11011 April 1986 Forwards Wastewater Rept,Mar 1986 ML20137T4551986-01-27027 January 1986 Notifies That on 860130 & 31 Approx 815,000 Gallons of Water & Fluorescein Disodium Salt Solution Will Be Discharged to Settling Basin 2 to Locate Cracks &/Or Leaks at Weld Points. on 860207,dye Will Be Discharged Through Final Outfall 001 ML20141J9681986-01-14014 January 1986 Forwards Discharge Monitoring Rept for Dec 1985. Daily 2 H Discharge Limit for Free Available Chlorine Exceeded at Outfall 001 on 851207 ML20133L1751985-10-16016 October 1985 Forwards Wastewater Rept for Sept 1985.Electric Power to Sampling Station Lost Due to Damage in Structure Circuitry Panel.Power Restored & Sampling Reinstituted on 850930 ML20127J4051985-06-12012 June 1985 Forwards Ohio EPA Discharge Monitoring Rept for May 1985 & Corrected Form EPA-4500 Re Outfall 002 Area Runoff for Apr 1985.Apr Data Not Reported as 30-day Weighted Average as Required.Exceedence Notification for May Submitted 850505 ML20128A4011985-05-13013 May 1985 Forwards Discharge Monitoring Rept for Apr 1985. Exceedence Notification Re Total Suspended Solids for Outfall 002 in Apr Sent 850503 ML20099L2951985-03-18018 March 1985 Provides List of Available Matl Re Contention,Per 850314 Telcon.Most Matl Considered Irrelevant by Applicants. Discovery Viewed as Untimely.Svc List Encl.Related Correspondence ML20108B5581985-03-0101 March 1985 Updates Applicant 840208 & 0309 Responses to Ohio Citizens for Responsible Energy Interrogatory 10-2 Re Issue 16. Applicant Contract Agreement W/Swri Available at Facility. Svc List Encl.Related Correspondence ML20099H9401984-11-13013 November 1984 Forwards Corrected Page 3,Outfall 003 for Oct 1984 Wastewater Rept.Monthly Average,Max & Min Results for Total Nonfilterable Residue Inadvertently Omitted from Original Submittal ML20094A3311984-11-0101 November 1984 Updates Applicant 830308 Response to Interrogatory 9-38 of Ohio Citizens for Responsible Energy 830131 Ninth Set of Interrogatories Re Issue 15 (Steam Erosion).Svc List Encl.Related Correspondence ML20107K4891984-10-25025 October 1984 Forwards State of Oh EPA Permit to Install Source for Mod to Treatment of Water Plant Regeneration Wastewater,Per 841015 Application.Permit Fee Required within 15 Days of Effective Date of Permit ML20087D4321984-03-0909 March 1984 Updates Applicant 840208 Response to Ohio Citizens for Responsible Energy Interrogatory 10-2 Re Consultants Used on Issue 16 Concerning Reliability of Standby Diesel Generators.Related Correspondence ML20086T3241984-03-0101 March 1984 Forwards Affidavits to Accompany Applicant Supplemental Answers to Interrogatories on Issues 6,8 & 15.Certificate of Svc Encl.Related Correspondence ML20086T3551984-02-29029 February 1984 Forwards Supplemental Answers to Interrogatories on Issues 6,8 & 15.W/o Affidavits.Related Correspondence ML20082F7491983-11-22022 November 1983 Forwards MR Edelman to Bj Youngblood Re Issue 14 of Ohio Citizens for Responsible Energy Interrogatory 9-26. Ltr Updates .W/O Encl.Svc List Encl ML20078B5331983-09-23023 September 1983 Upgrades Applicant 830308 Responses to Interrogatories 9-38 & 9-43 Through 9-46 Re Steam Erosion.Addl Relevant Documents in Applicant Possession Listed.Arrangements Must Be Made for Copying.Svc List Encl ML20076B6221983-08-0909 August 1983 Informs That Missing Borg-Warner 12-inch Globe Valves S/N 57289 & S/N 57290 Located in Film Vault.Valves & Radiographs Acceptable,However,Weld Ends Exhibit Wrong Size Penetrameter ML20023C4021983-05-10010 May 1983 Objects to Characterization of Ohio Citizens for Responsible Energy Members as Persons Advocating Disruption, Demonstration & Disrespect for Law,As Stated in Sunflower Alliance 830506 Brief in Support of Motion ML20071B4091983-02-23023 February 1983 Forwards Amend to FSAR Filed W/Nrc Re Standby Liquid Control Sys.Amend Referenced in Util to NRC Included in Applicant 820820 Answer to Sunflower Alliance Second Set of Interrogatories.W/O Encl.Related Correspondence ML20028G6561983-02-14014 February 1983 Confirms 830214 Telcon & Provides Info Re Obtaining Interrogatories on Issues 13-15.Copy of Interrogatories Will Be Hand Delivered.Postal Svc Deserves Blame for Nondelivery. W/Svc List ML20070K1831982-12-27027 December 1982 Updates Applicant 820924 Response to Interrogatory 3-4 of Oh Citizens for Responsible Energy 820830 Third Set of Interrogatories.Svc List Encl.Related Correspondence ML20070H3461982-12-21021 December 1982 Suppls Applicant Response to Sunflower Alliance Interrogatory 2 Re Standby Liquid Control Sys Initiation.Svc List Encl.Related Correspondence ML20027D0541982-10-22022 October 1982 Responds to 821018 Ltr Re Svc of Documents to Parties. Telcons Could Expedite Matters in Future.Svc List Encl. Related Correspondence ML20065P2781982-10-18018 October 1982 Requests Attachment to NRC to GE Be Provided to Allow Progress on Issue 4.Document Needed Before Intervenor Can Decide If Updates to Interrogatories Necessary.Related Correspondence ML20027C5481982-10-14014 October 1982 Advises of Correction to Util Response to Interrogatory 6-8 of Oh Citizens for Responsible Energy Sixth Set of Interrogatories.Conclusion of Response Remains Unchanged. Related Correspondence ML20080K4221982-10-11011 October 1982 Informs of Review of All Equipment Packages to Evaluate Major Concerns Expressed by Task Force During & After Completion of Task Force Review.Corrective Action to Be Implemented Listed.Review Info Encl ML20063P7641982-10-0606 October 1982 Confirms 821005 Telcon Re Time for Filing Util Response to Oh Citizens for Responsible Energy Motion to Compel Answers to Sunflower Second Set of Interrogatories.Answer to Be Filed by 821012.Svc List Encl.Related Correspondence ML20069D8461982-09-20020 September 1982 Confirms 820920 Telcon in Which Sunflower Alliance Agreed That Applicants Could Have 5-day Extension in Answering Sunflower Alliance Second Motion to Compel.Related Correspondence ML20069D8561982-09-20020 September 1982 Confirms 820920 Conversation Re Effect on Intervenor Responses to Discovery of Redesignating Oh Citizens for Responsible Energy as Lead Intervenor on Issues 4 & 6.Svc List Encl.Related Correspondence ML20063J6231982-08-30030 August 1982 Confirms Agreement That Applicants Have Until 820916 to File Answer to Oh Citizens for Responsible Energy Motion for Leave to File Contentions 21-26 ML20058J0371982-08-0505 August 1982 Responds to Re Applicant Interpretation of Issue 1.ASLB Admitted Oh Citizens for Responsible Energy Potassium Iodide Contention.Applicants Have Not Changed Position on Subj Contention.Svc List Encl ML20058J4051982-08-0404 August 1982 Requests Prepared Documents Including Draft Emergency Plan & Std Operating Procedures as Interim Discovery Measure to Assist in Assessment of State Emergency Planning.Related Correspondence ML20058G5971982-07-29029 July 1982 Emphasizes That Issue 1 Includes Oh Citizens for Responsible Energy Potassium Iodide Issue.Related Correspondence ML20054J5951982-06-25025 June 1982 Forwards Ofc of Analysis & Evaluation of Operational Data 800801 Memo & Executive Summary to Assist in Answer to Oh Citizens for Responsible Energy 820429 Interrogatory 2-14 of Second Set of Interrogatories ML20053D1421982-06-0101 June 1982 Requests Confirmation That J Alexander Thesis Population Energetics of Freshwater Clam Musculium Lacustre Used in 811130 Response to 811015 Interrogatories Cannot Be Produced.Svc List Encl ML20053E0281982-06-0101 June 1982 Advises That Attachment Referred to in DG Eisenhut 780203 Ltr to GG Sherwood Was Forwarded 2 Months Ago.Response to Interrogatory 17 of Applicant Second Set Should Be So Supplemented ML20040H1661982-02-10010 February 1982 Requests Interrogatories & Production of Documents within 2-wk Period.Related Correspondence ML19346A3521981-06-11011 June 1981 Requests That Insp Repts in Support of Contention 9(1) Be Identified by Number & Date.Related Correspondence ML19257C5571980-01-22022 January 1980 Notification of 800219-21 Meeting W/State,Local & Federal Govt Representatives Re Emergency Planning.Submits Schedule ML19210C4371979-11-0808 November 1979 Forwards Lake Erie Area Research Technical Rept 130, Impingment & Entrainment,316(b) Demonstration. ML19329D3301978-12-29029 December 1978 Notifies of Intent of Toledo & Oh Edison'S Municipal Wholesale Customers to Obtain Access to Facilities 1990-06-08
[Table view] |
Text
%
I
- HAND DELIVERED REl.ATEDCOMN SHAW, PITTM AN. PoTTS & TROWBRIDG E 900 SLVCNTCCNf H 'Ji n r C T, N . W.
WAS HI N G TO N, 0. c. 2 0 0 0 6 sausae o ports siteacw L eanern saoti ros 3Ona SfLWaSt unna ap.r %ntit e GC OkG C. ,L, f mOPs' wofmenGC uag Fat 0 Onaa.hre C AO L E.MH a*L AW
li t >W E N O. F'O f f S teemtt?s etast,se TCLEs a40ea3 GinaL D CMammOFF Cantt f 0's 4 Jomt $
pusLLIP O. 0Sfwate 't*0es a s a. ma a t t e smaCmLET S '8 aw R .16MOf u' nam 60= sautt tuomas Lcgwant cecovess6 Strvte 4. estLfit e
.CEOmGC u. so$tmS, Jse.
awCC w. CMueCuaLL DC am o awL:Ca LE SLIC a. IssCm0L&ON, Je Sm ELD 04 4. *CiSE L' esamtsu D. anaLL CLe gaegin a pt se0L Cto n ascesano J. sgescaLL mo.tet w asemano
.Jat
...aC. s.et.g a...p4.. ,,. L aus t wC-oE..STO s,c.ee C r,L c . R C n
.c o. c . au.s.c. ,, .olo. .,a,. c. se w....ao,.. w. .e, o. .t c..
,,,,,,,,,,,,,,,,,,c==^S-"a* October 21, 1975
~~
// %
OCCt f7ED h
Steven M. Charno, Esquire Antitrust Division U. S. Department of Justice p OC T211975 > 9 Washington, D. C. 20530 '
o..,,,,,*"*-'
g o
s
,,3 q Re: The Toledo Edison Company The Cleveland Electric Illuminating Company #
Davis-Besse Nuclear Power Station, Unit 1
- NRC Docket No. 50-346A; The Cleveland Electric Illuminating Company, et al.
Perry Nuclear Power Plant, Units 1 and 2 NRC Docket Nos. 50-440A and 50-441A; The Toledo Edison Company, et al.
Davis-Besse Power Station, Units 2 and 3 NRC Docket Nos. 50-500A and 50-501A
Dear fir. Charno:
Your letter to me of October 10, 1975, comes as a complete surprise, not only because it contains the unwarranted suggestion that Applicants failed to comply with the two document requests served upon them by the Department of Justice -- notwithstanding their production of some 2 million documents -- but also because it was written without first extending even the minimal courtesy of a preliminary telephone call to discuss the matter.
I regard your insinuation that. Applicants intentionally withheld material from production to be outrageous. You have re-quested a total of 21 " additional" documents. In light of the imprecise language used in the Perry and Davis-3 esse 2 & 3 document requests, which Applicants consistently construed expansively in order to guard against the kind of accusation you have made, even if all of these documents had not been produced a charge of bad faith would be irresponsible. It is even more inexcusable in light of the fact that only 2 of the 21 documents listed were inadvertently missed in the original document searches.
200fy- f
p ..
. b@w.jlTTMAN, PCTTS 6 TROCUDGE l
Steven M. Charno, Esquire
, October 21, 1975 j Page Two i
- .Nor is there any legitimate reason for writing this sort of letter just prior to commencement of the hearing, unless, as I suspect, you were hoping by this tactic to secure indirectly another delay in the hearing schedule. It is clear to me by the ;
j specific nature of the request that virtually all of the documents d
you have asked for are already in your possession. To the extent
. that this is the case and Applicants do not.have a copy of any
- such document (as indicated on the attachment hereto), I formally
, request that you produce copies to us immediately.
j -
) In direct response to your listing, I am attaching a i reply which addresses each document separately, and includes a
- supporting affidavit from each of the Applicants. You will note that several of the documents are not in Applicants' possession or control. This was not disclosed earlier for the very obvious reason that Applicants, not being aware of the specific material at the time of the earlier production, had no information to trigger
. the sort of' response required by Section B of the two document
! requests.
I am appalled that you chose to premise your October 14, 1975 request for leave to amend the Department's allegations on the demand letter to me for 21 documents. Only one document in that list bears even remotely on the new proposed allegation. And, as I suspect you knew when you wrote the letter, that document -- i.e.,
the Prentice letter of February 28,.1967 -- simply requested comments on a specific piece of legislation that was being considered for .
presentation to the Ohio State Legislature at the time. It lends no support whatsoever to your proposed allegation concerning some purported territorial allocation agreement between Ohio Edison Company and Ohio Power Company.
I am equally appalled at the suggestion in your letter --
made for the first time -- that you intend to try to use documents in this proceeding which the Department obtained from The Cleveland Electric Illuminating Company in response to Civil Investigative Demand No. 1629. That document production was in response to a l request having nothing to do with this proceeding; it went far beyond
.the discovery limitations imposed here by the Licensing Board, both
, as to the time period and subject matter involved. You know full !
well that the statute under which your CID issued strictly confines the use of the material produced. As I read that statute and under-stand the arrangement you had with CEI regarding the CID production, any.use of this material in the above. antitrust hearing is pro- !
hibited. I intend to resist every effort on your part to undermine this prohibition.
--m- , . . , . - - -
. __, ,.m . - - - . , . ~.m , . - ---,.
... ,-4 , - - ..-- . ~ - - -
~
- dMAW, PITTM AN, PCTTO & TCoVlDGE Steven M. Charno, Esquire October 21, 1975 Page Three In this regard, let me also make it clear in closing that, contrary to your October 10 letter, 1 have as yet entered into no stipulation.concerning the authenticity of any documents that may be introduced at the hearing. If you will refer to the September 18, 1975 transcript of the Sixth Prehearing Conference (p. 1218),
you will see that, while I do not now anticipate a problem regard- ,
ing the authentication of the bulk of the documents produced by Applicants in this proceeding, I am not prepared to enter into any stipulation in this regard until I know specifically which documents we are talking about.
Sincerely yours,
, ~% ,
i Q. G.LQ L \ C - " - -
Wm. Bradford Reynolds WBR:ats Enclosures cc: Atomic Safety and Licensing Board All Parties 4
~
--. g. ,.-
,, . , - u S'
DOCUMENTS REQUESTED BY DEPARTMENT OF JUSTICE IN OCTOBER 10, 1975 LETTER -
IE 07g y [
j' gcT 21
% arJu., . .5 e THE CLEVELAND ELECTRIC ILLUMINATING COMPANY w es ao Request No. 1:
Letter from Richard A. Miller to the Federal Power Commission, attention of Gordon M. Grant, Secretary, dated January 23, 1968, with enclosure.
(D. 6 - Perry)
CEI Response:
The Miller letter of January 23, 1968 and the en-closures thereto, were produced in response to the Perry document request. The Department did not designate that this material be transmitted to the Central Depository in Washington, D. C., and it was not.
Request No. 2:
The cost studies and engineering studies which were made to back up CEI's claim that CEI could sell power to MELP at a rate that would make the proposed $12,000,000 expansion both uneconomical and unnecessary. See entry of June 27, 1963 on document entitled "CEI Efforts Toward Elimination or Curtailment of MELP 1957 - Present." (D-B)
CEI Response:
The cost studies and engineering studies described above are no longer in the possession or control of CEI. This material was not required to be produced under the Departmenc's document requests since it falls outside the permissible discovery i period of September 1, 1965 to the present. More- l over, CEI was under no obligation to advise the i Department earlier (under Part B of the document request) that this material was no longer available, since such advir.e was requested by the Department i only as to post-1970 documents. l l
THE TOLEDO EDISON COMPANY Request No. 1:
' Letter from A. N. Prentice, OP, to Davis, Henry and others, dated February 28, 1967.
(D. 14; E. 1 - Perry; E. 3 - D-B)
TE Response:
The Prentice letter of February 28, 1967 cannot be located in the files of TE and, to TE's knowledge and belief, it is not now in the company's possession or control.
Request No. 2:
Letter from Charles E. Flahie to Lawrence McNealey, C&SOE, dated December 27, 1968.
(E. 1 - Perry; E. 3 - D-B)
TE Response:
The Flahie letter of December 27, 1968 cannot be located in the files of TE, and to TE's knowledge and belief, it is not now in the company's possession or control.
Request No. 3:
1 Letter from T. A. Kostanski to Morris R. l Fitzgerald, Chief of North Central Region, I Division of Audit, Federal Power Commission, l dated December 30, 1971, with enclosures. l (D. 6 - Perry)
TE Response:
The Kostanski letter of December 30, 1971, with enclosures has been located after an extensive search of TE's files. A copy is attached. This material was not produced earlier only because it was inadvertently overlooked in the original search of TE's files. ,
1 I
1
Request No. 4:
Speech given by Mr. W. H. Schwalbert at the Edison Electric Institute meeting held in January 1968. (E.1 - Perry)
TE Response:
The Schwalbert Speech cannot be located in the files of TE and, to TE's knowledge and belief, it is not in the company's possession or control.
Request No. 5:
Letter from Dewey G. Ries to John K. Davis, dated November 20, 1965. (E.1 - Perry)
TE Response:
The Ries letter of November 20, 1965 cannot be located in the files of TE and, to TE's knowledge and belief, it is not in the company's possession or control.
Request No. 6:
Letter from John K. Davis to Dewey G. Ries, dated November 23, 1965. (E.1 - Perry)
TE Response:
The Davis letter of November 23, 1965 Jannot be located in the files of TE and to ?E's knowledge and belief, it is not in eta company's possession or control.
Request No. 7:
Minutes taken by Stratman Cooke of meeting held on June 24, 1971 between Messrs. Cooke and Keck of Toledo Edison, Mr. Robert Badner of the Rural Electrification Administration, Mr. Joseph Wigham of Southern Engineering Company and representatives of the Southeastern Michigan Rural Electric Cooper-ative. (E.1 - Perry) 4 l
l
, y s s TE Response:
The Minutes taken by Stratman Cooke of meeting held on June 24, 1971 were not produced in response to the Perry document request because this material was not called for under any reasonable interpretation thereof.
OHIO EDISON COMPANY Request No. 1:
Letter frcm R. J. Dreisbach, General Coordi-nator of Division Distribution Practices, to F. G. Streit, C&SOE, dated February 2, 1966.
(D.14; E.1 - Perry; E.3 - D-B)
OE Response:
The Dreisbach letter of February 2, 1966 was not produced in response to the Department's document requests because it was not called for under any reasonable interpretation thereof.
Request No. 2: .
Letter from A. N. Prentice, OP, to Mansfield, White, and others, dated February 28, 1967.
(D.14; E.1 - Perry; E.3 - D-B)
OE Response:
The Prentice letter of February 28, 1967 was not produced in response to the Department's docu-ment requests because it was not called for under any reasonable interpretation thereof. More-over, this document, even if its production had been called for, would have been entitled to protection from disclosure under the Noerr-Pennincton doctrine, with particular reference to that doctrine's application by the Sixth Circuit Court of Appeals.in Lam'n Enterprises, Inc. v Toledo Blade Co., 461 F.2d 506 (6th Cir.), certiorari denied, 409 U.S. 1001 (1972).
9
, ,. . s ~
, . A copy of the Prentice letter, together with enclosures thereto, is attached, however, simply to expose fully what a slender reed the Department chooses to rely upon to support its request to amend its statement of allega-tions. This is the only document that bears, even remotely, on the matter of an alleged territorial allocation agreement between Ohio Edison Company and Ohio Power Company.
Request No. 3:
Letter from J. L. McNealey, C&SOE, to Messrs.
Zimmer, Oxley, Flahie, McVay, dated December 31, 1968. (E.1 - Perry; E.3 - D-B)
OE Response:
The McNealey letter of December 31, 1968 cannot be located in the files of OE and, to OE's knowledge and belief, it is not now in the company's possession or control.
Reg'uest No. 4:
Letter from J. L. McNealey, C&SOE, to Messrs.
Zimmer, de Bruyn Kops, Flahie, Dunham, Mansfield,
- dated December 27, 1968, with attachments.
(E.1 - Perry; E.3 - D-B)
OE Response:
The McNealey letter of December 27, 1968 cannot be located in the files of OE and, to OE's knowledge and belief, it is not now in the company's possession or control.
Request No. 5:
Letter from Howard A. Cummins, Buckeye Power, Inc.,
to Roger Waite of Norwalk, Ohio, dated March 15, 1971 with handwritten marginal notes in upper right corner. (Send the original or ten copies made from the original.) (E.1 - Perry; E.3 - D-B; E.5 - D-B)
OE Response:
The Cummins letter of March 15, 1971, with handwritten marginal notes in upper right corner, was produced in response to the Department's document requests, was trans-mitted to the Central Depository in Washington, D. C., pursuant to the Department's request, and, according to our records, was actually copies by the Department.
PENNSYLVANIA POWER COMPANY Request No. 1:
Letter from Charles S. Bowden to Borough of Ellwood City, dated July 30, 1966.
(E.1 - Perry; E.2 - D-B; E.3 - D-B)
PP Response:
The Bowden letter of July 30, 1966 was produced in response to the Department's document re-quests. The Department did not designate that it be transmitted to the Central Depository in Washington, D. C., and it was not. ,
Request No. 2:
Registered letter from James R. Edgerly to Borough of Ellwood City, attention of Mrs. Mildred R. Kettler, Secretary, dated August 10, 1966, with enclosures.
(E.1 - Perry; E.2 - D-B)
PP Response:
The Edgerly registered letter of August 10, 1966, with enclosures, was produced in response to the Department's document requests. The De-partment did not designate that it be transmitted to the Central Depository in Washington, D. C.,
and it was not.
4 Request No. 3:
Letter from James F. Haas, Encrgy Application Engineer, to Mrs. Kettler, Ellwood City, dated March 12, 1975, with enclosures.
(E.2 - D-B; E.3 - D-B)
PP Response:
The enclosures to the Haas letter of March 12, 1975 were produced in response to the Depart-ment's document requests and were transmitted to the Central Depository in Washington, D. C.
It cannot be ascertained from our records whether or not this material was actually copied by the Department.
The Haas cover letter was inadvertently over-looked in PP's earlier document search and a copy thereof is attached.
Request No. 4:
All wholesale municipal contracts in effect as of September 1, 1965. (E.2 - D-B)
PP Response:
All but four of the PP wholesale municipal con-tracts were produced in response to the Depart-ment's earlier document requests, were trans-mitted to the Central Depository in Washington, D. C., and, according to our records, were actually copied by the Department. The four such contracts not produced antedate the September 1, 1965 cut-off date and were therefore not called for. PP has no reluctance making these four contracts available to the Department, however, and copies are attached.
Request No. 5:
Document entitled " Pennsylvania Power Company -
Determination of Revenue Requirements for Municipal Resale Classification, Year Ended July 31, 1965",
dated November 18, 1965. (D.6 - Perry)
PP Response:
The document dated November 18, 1965 was not caZed for under any reasonable interpretation of paragrph D. 6 of the Perry document requests, and therefore it was not produced. PP has no reluctance making this document available to the Department, however, and a copy is attached.
DUQUESNE LIGHT COMPANY Request No. 1:
Attachments to letter from W. F. Gulfillan, Jr.
to David McNeil Olds, dated July 23, 1969.
(E.1 - Perry)
DL Response:
Attachments to letter from Gilfillan, Jr. dated July 23, 1969 cannot be located in the files of DL and, to DL's knowledge and beliefe this material is not in the company's possession or control. DL was under no obligation to advise the Department earlier, under Part B of the document requests, that this material could not be located, since such advice was requested by the Department only as to post-1970 documents.
The Gilfillan cover letter was produced in response to the Perry document requests, was transmitted to the Central Depository in Wash-ington, D. C., and, according to our records was
- actually copied by the Department.
Request No. 2:
Questionnaires, as complete'd by Ohio Edison, Pennsylvania Power, Toledo Edison and Cleveland Electric Illuminating, which were distributed for completion by W. G. Dempler at the CAPCO Planning Committee Meeting #24, dated July 27, 1972.
(E.1 - Perry)
DL Response:
No completed questionnaires were ever re-ceived by DL. The questionnaires themselves were produced in response to the Perry document requests, were transmitted to the Central Depository in Washington, D. C., and, according to our records, were actually copied by the Department.
Request No. 3:
Speech given by John W. O' Nan at the Edison Electric Institute meeting held in January 1968.
(E.1 - Perry)
DL Response:
The O' Nan Speech was produced in response to the Perry document requests; it was trans-mitted to the Central Depository in Washington, D. C. pursuant to the Department's request, and, according to our records, it was actually copied by the Department.