ML20217A897

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy
ML20217A897
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/09/1999
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20217A901 List:
References
50-440-99-09, NUDOCS 9910120104
Download: ML20217A897 (3)


See also: IR 05000440/1999009

Text

. .

l

l

September 9,1999 e

ENTg

g & ;, 7

SM e,

1

Mr. John K. Wood l

Vice President - Nuclear ]

FirstEnergy Nuclear Operating Company

P.O. Box 97, A200

{

1

Perry, OH 44081

SUBJECT: PERRY. INSPECTION REPORT 50-440/99009(DRP)

l

Dear Mr. Wood:

On August 25,1999, the NRC completed a routine safety inspection at the Perry Nuclear Power

Plant. The enclosed report presents the results of that inspection.

During this inspection period, the overall conduct of activities at the Perry facility was

.

conservative, with a continuing focus on safety. Routine maintenance and surveillance

activities were properly coordinated and performed per approved procedures. Engineering

department personnel promptly addressed operability questions during the inspection period

and provided good support to maintenance and test activities. There was one instance where a

severe thunderstorm waming was issued for the county, but it was not received by control room

personnel and appropriate compensatory actions were not taken. Corrective actions were

promptly implemented and the required compensatory actions were taken in a timely manner

after subsequent severe thunderstorm warnings were received.

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. This NCV is described in the subject

inspection report. If you contest the violation or severity level of the NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of

Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001.

l

)

)

9910120104

PDR

990909  !

~G

ADOCK 05000440 l

PDR l

1

. .

J. Wood 2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Documerr Room.

Sincerely,

/s/Thamas J. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No. 50-440

License No. NPF-58

Enclosure: Inspection Report 50-440/99009(DRP)

cc w/*ncl: H. Hegrat, Manager, Regulatory Affairs

. R. Schrauder, Director, Nuclear

Engineering Department

W. Kanda, General Manager

Nuclear Power Plant Department

N. Bonner, Director, Nuclear

Maintenance Department

H. Bergendahl, Director

Nuclear Services Department

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commiss.on

DOCUMENT NAME: G:\PERR\PER99009 DRP wpd

To receive a co py of this document. Indicate in the box: *C" = Copy w/o attach /enci *E" = Copy w/ attach /enet *N" No copy

OFFICE Rlll:DRP l /s Rlll:DRP lN l l

NAME Lipa/dp %, Kozak '7/C

,DATE 09/ '//99 /' 09/ 9 /99

OFFICIAL RECORD COPY

_

<

w .~.+c .

'

.. J. , Wood -3-

Distribution:

RPC (E-Mail)

DVP1 (Project Mgr) (E-Mail)

J. Caldwell, Rill w/enci

B. Clayton, Rlli w/ encl

SRI Perry w/enci

DRP w/enci

DRS w/ encl

Rlli PRR w/enci

' PUBLIC IE-01 w/ encl

Docket File w/enci

GREENS-

LEO (E-Mail)

, DOCDESK (E-Mail)

l

I

i

!

l

l

1

i

.,'

.<

[20004 \

\ l

4

l

.

l* 'g.

'

g.