ML20210U787

From kanterella
Jump to navigation Jump to search
Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of June,Jul & Aug
ML20210U787
Person / Time
Site: Perry 
Issue date: 09/12/1997
From: Myers L
CENTERIOR ENERGY
To: Shelby R
LAKE COUNTY, OH
Shared Package
ML20210U792 List:
References
PY-CEI-LCDU-004, PY-CEI-LCDU-4, NUDOCS 9709220085
Download: ML20210U787 (1)


Text

_. _

4

( -

p'"*

"7AW Power Generation Group Perry Nuclear power Plant Mad Adttress:

216-280 4 915 LewW Myers to Certer Road PO Boa 97 FAX 218-?80-8029 Vice Presdent Perry. Omo 44081 Perry. OH 44081 September 12,1997

PY CEl/LCDU 0044L Attention: Robert Shelby, Mentor Waste Facility Lake County Department of Utilities P.O. Ilox 490 Painesville, Ohio 44077 0490 Gentlemen:

Enclosed are the Quarterly Self Monitoring Reports for the Perry Nuclear Power Plant sanitary waste system for the months of June, July and August. All required samples were collected irt accordance with the self monitoring program. No violations occurred during this quarter.

Also included are the results from an isotopic analysis. No radioactive material was detected.

If you have questions or require additional information, please contact Ms. Donna Tizzano at (216) 280 5514.

Very truly yours, DGT:Jm Enclosures

- cc:

NRC Document Control Desk (Docket No. 50-440)

NRC Project Manager NRC Resident inspecur OfHce NRC Region 111 m-s,s 9709220085 970912 PDR ADOCK 05000440 R

PDR

!!,$h!lfll

-_