ML20112G290

From kanterella
Jump to navigation Jump to search
Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Mar,Apr & May
ML20112G290
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/05/1996
From: Shelton D
CENTERIOR ENERGY
To: Shelby R
LAKE COUNTY, OH
Shared Package
ML20112G293 List:
References
PY-CEI-LCDU-003, PY-CEI-LCDU-3, NUDOCS 9606110241
Download: ML20112G290 (1)


Text

r. -

- CENTERD%R ENERGY PERRY NUCLEAR POWER PLANT ' Mail Address:

Donald C. SheltOn 0 ^

pE OHIO 081 P RR OHIO 44081 SENIOR VICE PRESIDENT (2:6) 259-3737 NUCLEAR l

June 5, 1996 l

'PY-CEI/LCDU-0037L l 1

i Lake County Department of Utilities Attention: Robert Shelby,. Mentor Waste Facility P.O. Box'490 Painesville, Ohio 44077-0490 l

Gentlemen:

Enclosed are the Quarterly Self-Monitoring Reports for the Perry Nuclear i Power Plant sanitary waste system for the months of March, April'and May. j All required samples were collected and analyzed in accordance with the l self-monitcring program. No violations occurred during this quarter.

Also included are the results from an isotopic analysis. No radioactive material was detected, If you have questions or require additional information please contact

' Donna Tizzano at (216) 280-5514.

Very t y yours,

'h_ p[ \ ,-2 4

DGT:3c Enclosure cc NRC Project Manager NRC Reaident Inspectors Office NRC Document Control Desk (Docket No. 50-440)

NRC Region III i

i J

l 9606110241 960605 PDR ADOCK 05000440 R PDR owa n croc 4 r2t3:*

},