ML20132B924
| ML20132B924 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/06/1996 |
| From: | Myers L CENTERIOR ENERGY |
| To: | Shelby R External (Affiliation Not Assigned) |
| Shared Package | |
| ML20132B929 | List: |
| References | |
| NUDOCS 9612180015 | |
| Download: ML20132B924 (1) | |
Text
.
C 9C:NTERDO3 ENERGY l
PERRY NUCLEAR POWER PLANT Mad Address:
10 CENTER ROAD PEW, OWO 46 PERRY, OHIO 44081 (216) 259 3737 l
December 6, 1996 PY-CEI/LCDU-0039L I
l Lake County Department of Utilities Attention: Robert Shelby, Mentor Waste Facility P.O. Box 490 Painesville, Ohio 44077-0490 j
l Gentlemen Enclosed are the Quarterly Self-Monitoring Reports for the Perry Nuclear Power Plant sanitary waste system for the months of September, October and l
November. All required samples were collected in accordance with the self-monitoring program.
The BOD analyzation for November was interrupted
[
due to power probletra during the November snowstorm.
Per a telephone conversation between yourself and Electro Analytical, resampling for BOD wasn't necessary. No violations occurred during this quarter.
Also included are the results from an isotopic analysis. No radioactive material was detected.
If you have questions or require additional information, please contact Donna Tizzano at (216) 280-5514.
j l
Very truly yours, 9612180015 961206 PDR ADOCK 05000440 R
PDR Lew W.
Myers Vice President - Nuclear
[
DGT:sc f
Enclosure f
cc NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440) j
,../
Opero'q Comre es 16 0 0 4 G wra a E ec'r c ema'ng Cieve e "-