ML20206E471

From kanterella
Jump to navigation Jump to search
Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake County Local Emergency Planning Committee
ML20206E471
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/29/1999
From: Myers L
CENTERIOR ENERGY
To:
MENTOR, OH
References
PY-CEI-LEPC, PY-CEI-LEPC-000, NUDOCS 9905050139
Download: ML20206E471 (1)


Text

f c

4 Fax:

0-April 29,1999 PY-CEI/LEPC-0002L Lake County Local Emergency Planning Committee P.O. Box 480 i

Mentor, Ohio 44061-9998 Ladies and Gentlemen:

The Perry Nuclear Power Plant (PNPP) has been a Small Quantity Generator (SQG) of hazardous waste since 1996. The requirements set forth in 40CFR262.34 (A)(4),40 CFR265.53 l

and the Ohio Administrative Code Section 3745-65-53 apply to Large Quantity Generators.

Please be advised, that as a result of achieving SQG status, the PNPP Oil / Chemical Release Contingency Plan will not be routinely forwarded to your office.

If you have questions or require additional information, please contact Ms. Donna Tizzano at (440) 280-5514.

Sincerely, NM DGT:jm i

cc:

NRC Document Control Desk (Docket Number 50-440)

O NRC Project Manager NRC Region III l

NRC Resident Inspector Office O

i I

g.i1 {$

,+

l 1

~

9905050139 990429 PDR ADOCK 05000440 P

PDR m._