Similar Documents at Salem |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20230402023-05-0202 May 2023 And Salem Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023420, 05000272/202340 and 05000311/2023420 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000272/20224022022-10-14014 October 2022 Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) IR 05000272/20220022022-08-0808 August 2022 Integrated Inspection Report 05000272/2022002 and 05000311/2022002 IR 05000272/20224012022-07-21021 July 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000272/20220012022-05-0404 May 2022 Integrated Inspection Report 05000272/2022001 and 05000311/2022001 IR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210042022-02-10010 February 2022 Integrated Inspection Report 05000272/2021004 and 05000311/2021004 IR 05000272/20215012021-11-30030 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000272/20210032021-11-0202 November 2021 Integrated Inspection Report 05000272/2021003 and 05000311/2021003 IR 05000272/20214032021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000272/20210122021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000272/2021011 and 05000311/2021011 IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20210022021-08-11011 August 2021 Integrated Inspection Report 05000272/2021002 and 05000311/2021002 IR 05000272/20210012021-05-0505 May 2021 Integrated Inspection Report 05000272/2021001 and 05000311/2021001 IR 05000272/20210102021-03-0909 March 2021 Triennial Fire Protection Inspection Report 05000272/2021010 and 05000311/2021010 IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) IR 05000272/20214012021-02-23023 February 2021 And Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only) IR 05000272/20200042021-02-0909 February 2021 Generating Station, Units 1 and 2: Integrated Inspection Report 05000272/2020004 and 05000311/2020004 2024-09-25
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000272/19990071999-09-28028 September 1999 Insp Repts 50-272/99-07 & 50-311/99-07 on 990712-0829. Non-cited Violations Noted.Major Areas Inspected:Selected Exam of Procedures & Representative Records,Observed Work Activities & Interviews with Various Personnel IR 05000272/19990061999-09-20020 September 1999 Insp Repts 50-272/99-06 & 50-311/99-06 on 990716-0806 & (Region I-Inoffice) 990809-19 & 0901.No Violations Noted. Major Areas Inspected:Results of Team Insp of Auxiliary Feedwater Sys by Region Based Inspectors IR 05000272/19990051999-08-10010 August 1999 Insp Repts 50-272/99-05 & 50-311/99-05 on 990530-0711.No Violations Noted.Major Areas Inspected:Licensee Performance Indicators IR 05000272/19990041999-07-0606 July 1999 Insp Repts 50-272/99-04 & 50-311/99-04 on 990419-0529.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000272/19990021999-05-21021 May 1999 Insp Repts 50-272/99-02 & 50-311/99-02 on 990308-0418. Noncited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected Status of Util Ongoing Cable Raceway Fire Barrier Project IR 05000272/19990031999-05-0303 May 1999 Insp Repts 50-272/99-03 & 50-311/99-03 on 990315-19.No Violations Identified.Major Areas Inspected:Operations,Maint & Corrective Actions IR 05000272/19980121999-02-12012 February 1999 Insp Repts 50-272/98-12 & 50-311/98-12 on 981206-990116. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000272/19980111998-12-21021 December 1998 Insp Repts 50-272/98-11 & 50-311/98-11 on 981025-1205. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Insp on Radiation Protection Program IR 05000272/19980091998-11-19019 November 1998 Insp Repts 50-272/98-09 & 50-311/98-09 on 980913-1024. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000272/19980061998-08-21021 August 1998 Insp Repts 50-272/98-06 & 50-311/98-06 on 980622-0801. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000272/19980071998-08-0404 August 1998 Insp Repts 50-272/98-07 & 50-311/98-07 on 980629-0716.No Violations Noted.Major Areas Inspected:Review Engineering Activities Re Previously Identified Issues ML18106A7081998-05-0404 May 1998 Insp Repts 50-272/98-05 & 50-311/98-05 on 980504-0621. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML18106A4321998-04-0202 April 1998 Insp Repts 50-272/98-01 & 50-311/98-01 on 980202-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000272/19980041998-04-0101 April 1998 Insp Repts 50-272/98-04 & 50-311/98-04 on 980316-31.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000272/19980801998-03-20020 March 1998 Insp Repts 50-272/98-80,50-311/98-80 & 50-354/98-04 on 980302-04.No Violations Noted.Major Areas inspected:full- Participation Emergency Preparedness Exercise Evaluation IR 05000272/19980811998-03-17017 March 1998 Insp Repts 50-272/98-81 & 50-311/98-81 on 980210-20.No Violations Noted.Major Areas Inspected:Mgt Programs & Independent Oversight,Operations,Maint & Surveillance & Engineering ML18106A3691998-03-0505 March 1998 Insp Repts 50-272/97-21 & 50-311/97-21 on 971201-980201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000272/19970191997-12-24024 December 1997 Insp Repts 50-272/97-19 & 50-311/97-19 on 971020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance,Plant Support & Security Program IR 05000272/19970811997-12-0303 December 1997 Corrected Pages for Insp Repts 50-272/97-81,50-311/97-81 & 50-354/97-81.Rev to More Clearly Show Status of Two Issues Discussed in Rept IR 05000272/19970201997-11-14014 November 1997 Insp Repts 50-272/97-20 & 50-311/97-20 on 971020-1113.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000272/19970151997-09-24024 September 1997 Insp Repts 50-272/97-15 & 50-311/97-15 on 970727-0907.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000272/19970161997-09-17017 September 1997 Insp Repts 50-272/97-16 & 50-311/97-16 on 970609-0725. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML18102B5501997-08-14014 August 1997 Insp Repts 50-272/97-14 & 50-311/97-14 on 970622-0726. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000311/19970081997-08-11011 August 1997 Insp Rept 50-311/97-08 on 970609-0711.No Violations Noted. Major Areas Inspected:Mgt Programs & Independent Oversight, Operations,Maint & Surveillance & Engineering IR 05000272/19970101997-07-31031 July 1997 Insp Repts 50-272/97-10 & 50-311/97-10 on 970414-0614.No Violations Noted.Major Areas Inspected:Aspects of Testing for Startup of Salem Unit 2 IR 05000272/19970081997-07-15015 July 1997 Insp Repts 50-272/97-08 & 50-311/97-08 on 970331-0606.No Violations Noted.Major Areas Inspected:Licensee Engineering & Plant Support ML18102B4311997-07-0101 July 1997 Integrated Insp Repts 50-272/97-12 & 50-311/97-12 on 970427-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML18102B3731997-06-0303 June 1997 Insp Repts 50-272/97-05 & 50-311/97-05 on 970209-0328. Violations Noted.Major Areas Inspected:Engineering & Plant Support ML18102B3761997-06-0303 June 1997 Insp Repts 50-272/97-09 & 50-311/97-09 on 970414-18. Violations Noted.Major Areas Inspected:Corrective Actions to Satisfy 10CFR59,App R,Sections Iii.G, Fire Protection of Safe Shutdown Capability IR 05000272/19970061997-05-30030 May 1997 Insp Repts 50-272/97-06 & 50-311/97-06 on 970301-0412. Violations Noted.Major Areas Inspected:Engineering Staff Knowledge & Performance,Miscellaneous Engineering Activities & Mgt Meeting IR 05000311/19970111997-05-22022 May 1997 Insp Rept 50-311/97-11 on 970324-0417.Violations Noted.Major Areas Inspected:Eccs semi-automatic Switchover & Related Rhrs Flow Issues ML18102B3221997-05-20020 May 1997 Insp Repts 50-272/97-07 & 50-311/97-07 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Security ML18102B2561997-04-29029 April 1997 Insp Repts 50-272/97-02 & 50-311/97-02 on 970102-0207. Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000272/19970041997-04-18018 April 1997 Insp Repts 50-272/97-04 & 50-311/97-04 on 970121-0228.No Violations Noted.Major Areas Inspected:Licensee Engineering & Operations IR 05000311/19960211997-03-12012 March 1997 Insp Rept 50-311/96-21 on 961202-970120.Violation Noted. Major Areas Inspected:Engineering,Procedures,Documentation & Miscellaneous Engineering Issues IR 05000272/19960201997-02-12012 February 1997 Insp Repts 50-272/96-20 & 50-311/96-20 on 961118-1231.No Violations Noted.Major Areas Inspected:Licensee Engineering & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan ML18102A7801997-01-21021 January 1997 Insp Rept 50-311/96-81 on 961202-13.No Violations Noted. Major Areas Inspected:To Conduct Independent Insp to Determine If Plant,Unit 2 CC Sys Would Perform Intended Safety Function IR 05000311/19960191997-01-16016 January 1997 Insp Rept 50-311/96-19 on 961022-1201.No Violations Noted. Major Areas Inspected:Engineering IR 05000272/19960161997-01-10010 January 1997 Insp Repts 50-272/96-16 & 50-311/96-16 on 960923-1115.No Violations Noted.Major Areas Inspected:Engineering IR 05000272/19960801996-12-31031 December 1996 Insp Repts 50-272/96-80 & 50-311/96-80 on 960506-17 & 1021-25.Violations Noted But Not Cited.Major Areas Inspected:Design & Licensing Bases of Systems IR 05000272/19960101996-10-30030 October 1996 Insp Repts 50-272/96-10 & 50-311/96-10 on 960715-0809.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000272/19960111996-10-0303 October 1996 Insp Repts 50-272/96-11 & 50-311/96-11 on 960722-26 & 0906. Violations Noted.Major Areas Inspected:Review of Facility MOV Program ML18102A4451996-10-0101 October 1996 Insp Repts 50-272/96-12 & 50-311/96-12 on 960811-0914. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000272/19960141996-09-30030 September 1996 Insp Repts 50-272/96-14 & 50-311/96-14 on 960815-0903.No Violations Noted.Major Areas Inspected:Security Facilities & Equipment ML18102A3471996-08-26026 August 1996 Insp Repts 50-272/96-08 & 50-311/96-08 on 960630-0810. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000272/19960071996-07-19019 July 1996 Insp Repts 50-272/96-07 & 50-311/96-07 on 960519-0629. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000272/19960021996-06-27027 June 1996 Insp Repts 50-354/96-01,50-272/96-02 & 50-311/96-02 on 960528-31.No Violations Noted.Major Areas Inspected:Staff Knowledge & Performance,Miscellaneous EP Issues,Mgt Meetings & List of Insp Procedures Used ML18102A1901996-06-18018 June 1996 Insp Repts 50-272/96-06 & 50-311/96-06 on 960407-0518. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Mgt Meetings ML18101B3031996-03-25025 March 1996 Insp Repts 50-272/96-01 & 50-311/96-01 on 960114-0224. Violations Noted.Major Areas Inspected:Operations, Radiological Controls,Maint,Surveillances,Security, Engineering,Technical Support & Safety Assessment 1999-09-28
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20230402023-05-0202 May 2023 And Salem Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023420, 05000272/202340 and 05000311/2023420 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000272/20224022022-10-14014 October 2022 Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) IR 05000272/20220022022-08-0808 August 2022 Integrated Inspection Report 05000272/2022002 and 05000311/2022002 IR 05000272/20224012022-07-21021 July 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000272/20220012022-05-0404 May 2022 Integrated Inspection Report 05000272/2022001 and 05000311/2022001 IR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210042022-02-10010 February 2022 Integrated Inspection Report 05000272/2021004 and 05000311/2021004 IR 05000272/20215012021-11-30030 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000272/20210032021-11-0202 November 2021 Integrated Inspection Report 05000272/2021003 and 05000311/2021003 IR 05000272/20214032021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000272/20210122021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000272/2021011 and 05000311/2021011 IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20210022021-08-11011 August 2021 Integrated Inspection Report 05000272/2021002 and 05000311/2021002 IR 05000272/20210012021-05-0505 May 2021 Integrated Inspection Report 05000272/2021001 and 05000311/2021001 IR 05000272/20210102021-03-0909 March 2021 Triennial Fire Protection Inspection Report 05000272/2021010 and 05000311/2021010 IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) IR 05000272/20214012021-02-23023 February 2021 And Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only) IR 05000272/20200042021-02-0909 February 2021 Generating Station, Units 1 and 2: Integrated Inspection Report 05000272/2020004 and 05000311/2020004 2024-09-25
[Table view] Category:UTILITY
MONTHYEARIR 05000272/19900231990-11-0707 November 1990 Insp Repts 50-272/90-23,50-311/90-23 & 50-354/90-19 on 900925-28.No Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000272/19900821990-11-0707 November 1990 Insp Repts 50-272/90-82,50-311/90-82 & 50-354/90-80 on 901029-1102.Major Areas Inspected:Emergency Preparedness Exercise ML18095A5771990-10-31031 October 1990 Safety Insp Repts 50-272/90-22,50-311/90-22 & 50-354/90-16 on 900816-1001.Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & Technical Support IR 05000272/19900101990-10-12012 October 1990 Mgt Meeting Repts 50-272/90-10,50-311/90-10 & 50-354/90-07 on 900719.No Violations Noted.Major Areas Discussed:Findings of fitness-for-duty Insp Conducted on 900312 IR 05000272/19900191990-09-0404 September 1990 Insp Repts 50-272/90-19,50-311/90-19 & 50-354/90-14 on 900619-0815.Noncited Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness & Security ML18095A4861990-08-29029 August 1990 Insp Repts 50-272/90-20 & 50-311/90-20 on 900629-0815.One Noncited Violation Noted.Major Areas Inspected:Review of Circumstances Surrounding & Licensee Response to Reactor Trip on 900628 IR 05000272/19900181990-08-0101 August 1990 Insp Repts 50-272/90-18,50-311/90-18 & 50-354/90-12 on 900625-29.No Violations,Deviations or Unresolved Items Noted.Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000272/19900171990-07-25025 July 1990 Insp Repts 50-272/90-17,50-311/90-17 & 50-354/90-11 on 900611-15.No Violations Noted.Major Areas Inspected:Review of Licensee Engineering Organization,Staffing, Communications,Qa & Training & Mgt Support IR 05000272/19900811990-07-0303 July 1990 Integrated Performance Assessment Team Insp 50-272/90-81 & 50-311/90-81 on 900514-25.Weaknesses Noted.Major Areas Inspected:Evaluation of Current Status of Perceived Decline in Performance Identified in Recent SALP Rept IR 05000272/19900131990-06-28028 June 1990 Insp Repts 50-272/90-13,50-311/90-13 & 50-354/90-10 on 900501-0618.Noncited Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Maint & Surveillance Testing,Security & Emergency Preparedness IR 05000272/19900161990-06-13013 June 1990 Insp Repts 50-272/90-16 & 50-311/90-16 on 900529-0601.No Violations Noted.Noncited Violation Re Radioactive Liquid Release from Unit 2 on 900521 Noted.Major Areas Inspected: Licensee Radioactive Liquid & Gaseous Control Programs ML18095A2751990-06-0707 June 1990 Maint Team Insp Repts 50-272/90-200 & 50-311/90-200 on 900409-13 & 23-27.Major Areas Evaluated:Overall Plant Performance as Affected by Maint,Mgt Support of Maint & Maint Program Implementation ML18095A2911990-06-0606 June 1990 Insp Repts 50-272/90-14 & 50-311/90-14 on 900501-04. Violations Noted.Major Areas Inspected:Radiological Controls,Organization & Staffing,Personnel Qualifications & Corrective Action Sys & Performance Monitoring & ALARA IR 05000272/19900111990-05-21021 May 1990 Insp Repts 50-272/90-11,50-311/90-11 & 50-354/90-08 on 900317-0430.Violation Noted.Major Areas Inspected:Operations Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering & Technical Support IR 05000272/19900081990-05-15015 May 1990 Insp Repts 50-272/90-08 & 50-311/90-08 on 900226-0302. Noncited Violations Noted.Major Areas Inspected:Review Status of Previously Identified Open Items & Adequacy of Licensee Actions to Resolve Items ML18095A5581990-05-15015 May 1990 Corrected Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07 on 900312-15.One Noncited Violation Noted.Major Areas inspected:fitness-for-duty Program,Including Written Policies & Procedures,Administration & Training ML18094B4301990-04-19019 April 1990 Insp Repts 50-272/90-12 & 50-311/90-12 on 900411-18.No Violations Noted.Major Areas Inspected:Circumstances & Licensee Response to Identification of Miscalculations in ECCS Flow Balance Verification Surveillance Test IR 05000272/19900051990-04-0404 April 1990 Insp Repts 50-272/90-05,50-311/90-05 & 50-354/90-03 on 900213-0316.Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Maint/Surveillance Testing,Emergency Preparedness,Security & LER Followup ML18094B3801990-03-29029 March 1990 Insp Repts 50-272/90-80 & 50-311/90-80 on 900116-25. Weaknesses & Deficiencies Noted.Major Areas Inspected: Emergency Procedures Used by Operators at Plant IR 05000272/19900061990-03-15015 March 1990 Insp Repts 50-272/90-06,50-311/90-06 & 50-354/90-04 on 900226-0302.No Violations Noted.Major Areas Inspected: Radiological Environ Monitoring & Meteorological Monitoring Programs,Including Mgt Controls for Programs IR 05000272/19900031990-02-26026 February 1990 Insp Repts 50-272/90-03 & 50-311/90-03 on 900108-12 & 16-29. Weaknesses Noted Re Inservice Testing Program Administration.Major Areas Inspected:Corrective Action Controls & Inservice Testing Program Activities IR 05000272/19900041990-02-23023 February 1990 Insp Repts 50-272/90-04,50-311/90-04 & 50-354/90-01 on 900101-0212.No Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness & Security IR 05000272/19900011990-02-0101 February 1990 Insp Repts 50-272/90-01 & 50-311/90-01 on 900108-12.No Violations Noted.Major Areas Inspected:Status of Previously Identified App R Issues,Including Use of Manual Carbon Dioxide Sys in Ac Switchgear Room IR 05000272/19890261990-01-26026 January 1990 Safety Insp Repts 50-272/89-26 & 50-311/89-24 on 891121- 1231.No Violations Noted.Major Areas Inspected:Operations, Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security & Engineering/Technical Support IR 05000272/19900021990-01-22022 January 1990 Radiological Controls Insp Repts 50-272/90-02 & 50-311/90-02 on 900108-12.No Violations Noted.Major Areas Inspected: Organization & Staffing,Licensee Actions on Previous Findings,Alara & Outage Planning IR 05000272/19890281990-01-0909 January 1990 Insp Repts 50-272/89-28 & 50-311/89-25 on 891211-13.No Violations Noted.Major Areas Inspected:Condition of Facility Storage Tanks to Find Out What Insp & Maint Activities Conducted by Licensee,Lers Re Tanks & Corrective Actions IR 05000272/19890211990-01-0909 January 1990 Insp Repts 50-272/89-21 & 50-311/89-19 on 891017-1120.One Noncited Violation Noted Re Failure to Rept to NRC RHR Overpressurization Event.Major Areas Inspected:Emergency Preparedness,Maint,Security & Review of Licensee Repts IR 05000272/19890271990-01-0303 January 1990 Insp Rept 50-272/89-27 on 891129-1201.Violations Noted. Major Areas Inspected:Review of Events Surrounding 891109 Entry Into Tech Spec 3.0.3 During Performance of Turbine Volumetric Flow Test IR 05000272/19890241989-12-20020 December 1989 Partially Withheld Physical Security Insp Repts 50-272/89-24,50-311/89-22 & 50-354/89-19 on 891113-17 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Program Plans & Audits & Security Training & Qualifications IR 05000272/19890811989-12-0707 December 1989 Insp Repts 50-272/89-81,50-311/89-81 & 50-354/89-81 on 891024-26.No Exercise Weaknesses Noted.Major Areas Inspected:Annual,Partial Participation Emergency Exercise on 891024-26 ML18094B2041989-12-0505 December 1989 Insp Rept 50-272/89-25 & 50-311/89-23 on 891117-29. Violation Noted.Major Areas Inspected:Circumstances & Licensee Response to Identification of ECCS Single Failure Vulnerability IR 05000272/19890221989-11-0707 November 1989 Safety Insp Repts 50-272/89-22 & 50-311/89-20 on 890905- 1016.Three Unresolved Items Noted.Major Areas Inspected: Operations,Radiological Controls.Surveillance Testing,Maint, Emergency Preparedness,Security & Engineering Support IR 05000272/19890231989-10-31031 October 1989 Insp Repts 50-272/89-23 & 50-311/89-21 on 890912-15.No Violations or Deviations Noted.Major Areas Inspected: Licensee Compliance w/10CFR50.62 ATWS Rule & Review Conducted Per NRC Temporary Instruction 2500/20 IR 05000272/19890201989-09-19019 September 1989 Insp Repts 50-272/89-20 & 50-311/89-18 on 890725-0904.No Violations Noted.Major Areas Inspected:Operations, Radiological Controls,Surveillance Testing,Maint,Security, Engineering/Technical Support & Safety of Quality ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000272/19890151989-08-0303 August 1989 Insp Repts 50-272/89-15 & 50-311/89-14 on 890606-0724. Violations Noted.Major Areas Inspected:Operations,Maint, Radiological Controls,Surveillance Testing,Security,Safety Assessment/Assurance of Quality & Emergency Preparedness IR 05000272/19890131989-07-31031 July 1989 Insp Repts 50-272/89-13 & 50-311/89-12 on 890522-26. Deviations Noted.Major Areas Inspected:Licensee Implementation of Reg Guide 1.97,Rev 2 for post-accident Monitoring Instrumentation ML18094A5761989-07-12012 July 1989 Insp Repts 50-272/89-16 & 50-311/89-15 on 890527-0614. Violations Noted.Major Areas Inspected:Licensee Response to Identification of Inadequate Response Time Testing of Main & Bypass Feedwater Regulating Valves & Unacceptables Results IR 05000272/19890111989-07-0505 July 1989 Resident Safety Insp Repts 50-272/89-11 & 50-311/89-10 on 890501-0605.Violation Noted.Major Areas Inspected: Operations,Radiological Controls,Surveillance Testing,Maint, Emergency Preparedness,Security & Review of LERs ML18094A5531989-06-16016 June 1989 Insp Rept 50-272/89-17 on 890522-26.Violations Noted.Major Areas Inspected:Loss of RHR Pump Event on 890520 Due to Inadvertent Nitrogen Injection from Accumulator & Licensee Action Associated W/Event IR 05000272/19890081989-05-31031 May 1989 Insp Repts 50-272/89-08 & 50-311/89-07 on 890424-0501.No Violations Noted.Major Areas Inspected:Radiological & Nonradiological Chemistry Program,Confirmatory measurements- Radiological,Std analyses-chemistry & Lab Qa/Qc IR 05000272/19890091989-05-25025 May 1989 Insp Repts 50-272/89-09 & 50-311/89-08 on 890424-28.No Violations Noted.Weaknesses Identified in Housekeeping Area. Major Areas Inspected:Personnel Qualifications & Training & Corrective Action Sys & Performance Monitoring ML18094A4691989-05-12012 May 1989 Insp Repts 50-272/89-07 & 50-311/89-06 on 890417-21.No Violations Noted.Major Areas Inspected:Review of Actions in Response to Expeditious Enhancements Described in Generic Ltr 88-17, Loss of Dhr IR 05000272/19890061989-05-12012 May 1989 Insp Repts 50-272/89-06,50-311/89-05 & 50-354/89-10 on 890410-14.No Violations Noted.Major Areas Inspected: Engineering Support of Plants by Corporate Engineering Organization IR 05000272/19890031989-05-11011 May 1989 Safety Insp Repts 50-272/89-03 & 50-311/89-03 on 890321-0430.Violations Noted.Major Areas Inspected: Operations,Radiological Controls,Surveillance Testing,Maint, Emergency Preparedness,Security & LERs ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000272/19890051989-04-28028 April 1989 Insp Repts 50-272/89-05,50-311/89-04 & 50-354/89-07 on 890313-16 & 22 & 0417-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000272/19890041989-04-27027 April 1989 Insp Rept 50-272/89-04 on 890403-07.Major Areas Inspected: Steam Generator Secondary Water Chemistry,Eddy Current Insp History,Schedules of Items to Be Examined During Ongoing Refueling Outage & Requests for Code Requirements Relief ML18094A3201989-03-29029 March 1989 Insp Repts 50-272/89-01 & 50-311/89-01 on 890131-0320. Violations Noted.Major Areas Inspected:Resident Safety Insp of Operations,Radiological Controls,Surveillance Testing, Maint,Emergency Preparedness,Security & Engineering Support IR 05000272/19880241989-02-0808 February 1989 Safety Insp Repts 50-272/88-24 & 50-311/88-27 on 881213- 890130.Violation Noted.Major Areas Inspected:Operations, Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security & Engineering/Technical Support 1990-09-04
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000272/19990071999-09-28028 September 1999 Insp Repts 50-272/99-07 & 50-311/99-07 on 990712-0829. Non-cited Violations Noted.Major Areas Inspected:Selected Exam of Procedures & Representative Records,Observed Work Activities & Interviews with Various Personnel IR 05000272/19990061999-09-20020 September 1999 Insp Repts 50-272/99-06 & 50-311/99-06 on 990716-0806 & (Region I-Inoffice) 990809-19 & 0901.No Violations Noted. Major Areas Inspected:Results of Team Insp of Auxiliary Feedwater Sys by Region Based Inspectors PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000272/19990051999-08-10010 August 1999 Insp Repts 50-272/99-05 & 50-311/99-05 on 990530-0711.No Violations Noted.Major Areas Inspected:Licensee Performance Indicators IR 05000272/19990041999-07-0606 July 1999 Insp Repts 50-272/99-04 & 50-311/99-04 on 990419-0529.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000272/19990021999-05-21021 May 1999 Insp Repts 50-272/99-02 & 50-311/99-02 on 990308-0418. Noncited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected Status of Util Ongoing Cable Raceway Fire Barrier Project IR 05000272/19990031999-05-0303 May 1999 Insp Repts 50-272/99-03 & 50-311/99-03 on 990315-19.No Violations Identified.Major Areas Inspected:Operations,Maint & Corrective Actions IR 05000272/19993011999-04-0909 April 1999 NRC Operator Licensing Exam Repts 50-272/99-301 & 50-311/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0305 & Grading on 990308-12.Seven of Eight ROs & All Eight SRO Applicants Passed Exam IR 05000272/19980121999-02-12012 February 1999 Insp Repts 50-272/98-12 & 50-311/98-12 on 981206-990116. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support PNO-I-99-008, on 990203,determined That Computer Sys Supporting Overhead Annunciators in CR Had Malfunctioned. Mishap Occurred During Preventive Maint on Annunciator Computer Sys,Which Involves Two Computer Processors1999-02-0303 February 1999 PNO-I-99-008:on 990203,determined That Computer Sys Supporting Overhead Annunciators in CR Had Malfunctioned. Mishap Occurred During Preventive Maint on Annunciator Computer Sys,Which Involves Two Computer Processors IR 05000272/19980111998-12-21021 December 1998 Insp Repts 50-272/98-11 & 50-311/98-11 on 981025-1205. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Insp on Radiation Protection Program ML18106B0061998-12-21021 December 1998 Notice of Violation from Insp on 981025-1205.Violation Noted:On 980916,NRC Identified Measuring & Test Equipment Connected to All Four Operable Channels of RPS Without Appropriate Channel Separation & Electrical Isolation PNO-I-98-060, on 981208,CR Operators Declared Unusual Event at Salem Unit 2,due to Indications of Substantial RCS Leak. Unit 1 Was Operating at Full Power.Resident Inspectors Responded to Event & Observed CR Activities1998-12-0909 December 1998 PNO-I-98-060:on 981208,CR Operators Declared Unusual Event at Salem Unit 2,due to Indications of Substantial RCS Leak. Unit 1 Was Operating at Full Power.Resident Inspectors Responded to Event & Observed CR Activities PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1998-12-0101 December 1998 PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal IR 05000272/19980091998-11-19019 November 1998 Insp Repts 50-272/98-09 & 50-311/98-09 on 980913-1024. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000272/19983021998-10-0505 October 1998 NRC Operator Licensing Exam Repts 50-272/98-302 & 50-311/98-302 (Including Completed & Graded Tests) for Exams Administered on 980914-24.All Candidates Demonstrated Good Control of Plant Operations When in SRO Position IR 05000272/19980991998-09-15015 September 1998 SALP Repts 50-272/98-99 & 50-311/98-99 for Salem Nuclear Generation Station,Units 1 & 2 for Period of 970301-980801 IR 05000272/19980061998-08-21021 August 1998 Insp Repts 50-272/98-06 & 50-311/98-06 on 980622-0801. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000272/19980071998-08-0404 August 1998 Insp Repts 50-272/98-07 & 50-311/98-07 on 980629-0716.No Violations Noted.Major Areas Inspected:Review Engineering Activities Re Previously Identified Issues ML18106A7061998-07-10010 July 1998 Notice of Violation from Insp on 980524-0621.Violations Noted:On 980504,NRC Inspectors Noted That Procedure Writers Failed to Perform 10CFR50.59 Applicability Review & SE for Rev to Procedure SC.MD-CM.ZZ-0024 as Required by NAP-59 ML18106A7081998-05-0404 May 1998 Insp Repts 50-272/98-05 & 50-311/98-05 on 980504-0621. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects PNO-I-98-012, on 980407,reactor Went Critical.Nrc Inspectors Observed Approach to Criticality.Util Issued Press Release1998-04-0808 April 1998 PNO-I-98-012:on 980407,reactor Went Critical.Nrc Inspectors Observed Approach to Criticality.Util Issued Press Release ML18106A4321998-04-0202 April 1998 Insp Repts 50-272/98-01 & 50-311/98-01 on 980202-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML18106A4311998-04-0202 April 1998 Notice of Violation from Insp on 980202-0315.Violation Noted:From 980125-0225,several Instances of Biofouling in SW Cooled Heat Exchangers Were Observed & Missing Strainer Filter Media Identified W/O Initiating Action Request IR 05000272/19980041998-04-0101 April 1998 Insp Repts 50-272/98-04 & 50-311/98-04 on 980316-31.No Violations Noted.Major Areas Inspected:Engineering & Plant Support PNO-I-98-009, on June 1995 CAL Which Modified to Allow Salem Unit 2 Restart on 970806 Has Now Been Modified to Permit Unit 1 Restart.Approach to Criticality Expected to Begin on 980405.Addl Insp Planned to Monitor Power Ascension Program1998-04-0101 April 1998 PNO-I-98-009:on June 1995 CAL Which Modified to Allow Salem Unit 2 Restart on 970806 Has Now Been Modified to Permit Unit 1 Restart.Approach to Criticality Expected to Begin on 980405.Addl Insp Planned to Monitor Power Ascension Program IR 05000272/19980801998-03-20020 March 1998 Insp Repts 50-272/98-80,50-311/98-80 & 50-354/98-04 on 980302-04.No Violations Noted.Major Areas inspected:full- Participation Emergency Preparedness Exercise Evaluation IR 05000272/19980811998-03-17017 March 1998 Insp Repts 50-272/98-81 & 50-311/98-81 on 980210-20.No Violations Noted.Major Areas Inspected:Mgt Programs & Independent Oversight,Operations,Maint & Surveillance & Engineering ML18106A3691998-03-0505 March 1998 Insp Repts 50-272/97-21 & 50-311/97-21 on 971201-980201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000272/19980021998-02-17017 February 1998 NRC Operator Licensing Exam Repts 50-272/98-02OL & 50-311/98-02OL Administered on 980112-30.Seven SRO Candidates Administered Initial Exams.One Candidate Did Not Pass Written Portion,All Other Candidates Passed All Exams IR 05000272/19970191997-12-24024 December 1997 Insp Repts 50-272/97-19 & 50-311/97-19 on 971020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance,Plant Support & Security Program IR 05000272/19970811997-12-0303 December 1997 Corrected Pages for Insp Repts 50-272/97-81,50-311/97-81 & 50-354/97-81.Rev to More Clearly Show Status of Two Issues Discussed in Rept IR 05000272/19970201997-11-14014 November 1997 Insp Repts 50-272/97-20 & 50-311/97-20 on 971020-1113.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000272/19970151997-09-24024 September 1997 Insp Repts 50-272/97-15 & 50-311/97-15 on 970727-0907.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000272/19970161997-09-17017 September 1997 Insp Repts 50-272/97-16 & 50-311/97-16 on 970609-0725. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support PNO-I-97-052, on 970817,NRC inspectors,on-shift at Time, Observed Approach to Criticality.Backshift Insp Coverage in Progress to Monitor Reactor Startup & Power Ascension Program.States of Nj & DE Notified1997-08-18018 August 1997 PNO-I-97-052:on 970817,NRC inspectors,on-shift at Time, Observed Approach to Criticality.Backshift Insp Coverage in Progress to Monitor Reactor Startup & Power Ascension Program.States of Nj & DE Notified ML18102B5501997-08-14014 August 1997 Insp Repts 50-272/97-14 & 50-311/97-14 on 970622-0726. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000311/19970081997-08-11011 August 1997 Insp Rept 50-311/97-08 on 970609-0711.No Violations Noted. Major Areas Inspected:Mgt Programs & Independent Oversight, Operations,Maint & Surveillance & Engineering PNO-I-97-048, on 970807,approach to Criticality Expected to Begin,Based on June 1995 CAL Modified to Allow Restart of Salem Unit 2.Addl Insps Planned to Monitor Power Ascension Program.States of Nj & DE Notified1997-08-0707 August 1997 PNO-I-97-048:on 970807,approach to Criticality Expected to Begin,Based on June 1995 CAL Modified to Allow Restart of Salem Unit 2.Addl Insps Planned to Monitor Power Ascension Program.States of Nj & DE Notified IR 05000272/19970101997-07-31031 July 1997 Insp Repts 50-272/97-10 & 50-311/97-10 on 970414-0614.No Violations Noted.Major Areas Inspected:Aspects of Testing for Startup of Salem Unit 2 ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept IR 05000272/19970081997-07-15015 July 1997 Insp Repts 50-272/97-08 & 50-311/97-08 on 970331-0606.No Violations Noted.Major Areas Inspected:Licensee Engineering & Plant Support IR 05000272/19970131997-07-0202 July 1997 Exam Repts 50-272/97-13OL & 50-311/97-13OL on 970529.Exam Results:Candidate Passed Simulator Retake Exam.Facility Training Staff Did Good Job in Developing & Subsequently Validating Two Simulator Scenarios ML18102B4311997-07-0101 July 1997 Integrated Insp Repts 50-272/97-12 & 50-311/97-12 on 970427-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML18102B5991997-06-30030 June 1997 Investigation Rept 1-96-031 on 970630.No Noncompliance Noted.Major Areas Investigated:Allegations Re Discrimination Against Contract Security Officer for Purportedly Contracting NRC ML18102B3731997-06-0303 June 1997 Insp Repts 50-272/97-05 & 50-311/97-05 on 970209-0328. Violations Noted.Major Areas Inspected:Engineering & Plant Support ML18102B3761997-06-0303 June 1997 Insp Repts 50-272/97-09 & 50-311/97-09 on 970414-18. Violations Noted.Major Areas Inspected:Corrective Actions to Satisfy 10CFR59,App R,Sections Iii.G, Fire Protection of Safe Shutdown Capability ML18102B3721997-06-0303 June 1997 Notice of Violation from Insp on 970209-0328.Violation Noted:On & Before 960328 Pse&G Failed to Provide Adequate Bases for Plant Design Configurations That Differed from FSAR Description as Evidenced IR 05000272/19970061997-05-30030 May 1997 Insp Repts 50-272/97-06 & 50-311/97-06 on 970301-0412. Violations Noted.Major Areas Inspected:Engineering Staff Knowledge & Performance,Miscellaneous Engineering Activities & Mgt Meeting 1999-09-28
[Table view] |
Inspection Report - Salem - 1981001 |
---|
|
|
Text
Report No Docket No U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT 50-272/81-01 50-311/81-01 50-272 50-311 DPR-70
REGION I
License No DPR-75
---~~~~~~~~~~~~-
Licensee:
Public Service Electric and Gas Company 80 Park Piaza - 15A Newark, New Jersey 07101 50272-810119 50272-810126 50272-810129 50272-810130 Faci 1 ity Name:
sa*l em Nuclear Gener.a ting Station - Units 1 and 2 Inspection At:
Hancocks Bridge, New Jersey Inspectors:
Approved By:
1981 Inspector R.R. Keimig, Chief, Reacto'r Projects Section No. 1, RO&NS Branch 1'/;?/rl
~*
date
- i./ I~ IR I date a/c../tJ date Inspection Summary:
Ins ections on Januar 1 - Januar 31, 1981 Combined Re art Numbers 50-272/81-01 and 50-311/81-01 Unit 1 Areas Inspected: Routine inspections by the resident inspectors of plant operations including tours of the facility; confonnance with technical specifi-cations and operating parameters; log and record review; reviews of licensee events; IE Bulletins and Circulars; and followup on previous inspection item The inspection involved 79 inspector-hours by the resident inspecto ~esults: Three items of noncompliance were identified (Failure to conduct post-maintenance position verification of ECCS valves {paragraph 10); Failure to acknowledge entry into an Action Statement (paragraph 6b); Fajflure to post docu-ments per 10 CFR 19.11 (paragraph lOc)).
Unit 2 Areas Inspected: Routine inspection by the resident inspectors of plant startup testing including tours of the facility; license requirements and technical specifications; IE Bulletins and Circulars; followup on licensee events; and, followup on previous inspection items. The inspection involved 43 inspector-hours by the resident NRC inspector Results:
One item of noncompliance was identified (Failure to acknowledge entry into an Action Statement (paragraph 6b)).
DETAILS Persons Contacted J. Driscoll, Chief Engineer L. Fry, Station Operating Engineer J. Gallagher, Assistant Maintenance Engineer S. LaBruna, Maintenance Engineer H. Midura, Manager - Salem Generating Station L. Miller, Station Perfonnance Engineer Jr Nichols, Reactor Engineer F. Schnarr, Station Operating Engineer R. Silverio, Assistant to the Manager J. Stillman, Station QA Engineer R. Swetnam, Radiation Protection Engineer The inspector also interviewed and talked with other licensee personnel during the course of the inspections including management, clerical, maintenance, operations, performance and quality assurance personne.
Status of Previous Inspection Items (Closed) Unresolved Item (272/80-07-07) Evaluation and enumeration of reactor trip cycles. The licensee has detennined that a record of all reactor trips, regardless of power level, will be main-tained. The inspector reviewed a new section of the Operations Directive Manual which establishes a Cyclic and Transient Data File to be maintained by the* Operating Department staff. Addi-tionally, Special Directive No. 8, dated January 14, 1981, directs operators to record certain infonnation in the operating logs for defined transient events, including tri.PS from any powe The data file for reactor trips, including all trips to date, is being complete The inspector had no further questions on this ite (Closed) Follow Item (272/80-23-04)
Review of system leak rate testing for systems outside containment which contact the reactor coolant system. System visual leak rate tests were conducted prior to unit startup. The inspector reviewed the results of testing con-ducted in accordance with Maintenance Procedure M 17 F, Visual Leak Examination Procedure. The following system leakage values were recorded: Containment Spray - none, eves - 120 drops/min, RHR - 4 drops/min, Sampling - 65 drops/min, Safety Injection -
73 drops/min, Liquid Waste - none, Waste Gas - 12,234.53 SCC Work Orders were issued to correct identified leak points. The inspector had *no further questions on this ite (Closed) Unresolved Item {272/80-20-04) Storm drain sampling schedul The inspector reviewed procedure PD-3.8.008, NPDES Samples, Revision O, dated January 14, 1981, which includes a monthly sample of yard drains for activity. Also reviewed were the results of the January 1981 sample which indicated no detectable activity in the drains. The inspector had no further questions relative to IE Bulletin 80-1 *
(Closed)
(Closed)
(Closed)
(Closed)
(Closed)
(Closed)
Noncompliance (272/80-06-01)
Failure to maintain status of valve 14AF10 found closed during Mode 1 operation. The licensee's response to this item is included in correspondence to NRC Region I dated May 1, June 5, and July 2, 198 The inspector verified that the following actions have been taken; changeout of locks and use of chains on locked valves, control of valve lock keys at the Shift Supervisor, verification of valve lineups for safety related systems, and explicit directions to operators regarding the performance of valve lineups. The confirmation included a review of the following:
selected post-test valve lineups and verifica-tions, status of locked valves in Unit 1, Information Letter 80/60 Performance of Valve Lineups, dated May 16, 1980, and Operating Memorandu~-19, Independent Valve Lineups and Verifications, dated January 21, 198 The inspector had no further questions relative to corrective or preventive measures taken with respect to this ite Unresolved Item (272/79-14-02) Accuracy of ISI data. The inspector reviewed a copy of the revised ISI Report to confirm that an appropriate procedure was referenced for the 12 MS 167 upper set studs. The report now refers to UT procedure 600-14/1 The in~
specter had no further questions on this ite Further review is documented in NRC Inspection Report 50-272/80-2 Follow Item (272/80-32-02)
Identification of sinks in controlled access are The inspector confirmed that sources of demineralized water in controlled access area laboratories had been identified to caution personnel that the water was not to be used for consumptio This. completes the review of IE Circular 80-14.
.
Unresolved -Item (272/80-13-04)
Complete design change to provide automatic switchover for meteorological tower power suppl By review of documentation and interviews with personnel, the i.nspector confirmed that OCR 1 EC-790 had been completed, providing the automatic switchover capability stated in LER 80-0 The inspector had no further questions on this ite Noncompliance (311/80-09-01)
Failure to maintain no more than one operable safety injection pump with RCS temperature less than 312° The inspector reviewed procedure SP(O) 4.3.2.1.3, ESF-Response Time Testing, Revision O, dated March 1979, with on-the-spot change P-7, dated July 2, 198 The procedure has been modified as stated in the licensee's response to preclude simultaneous operability of two pumps under cold plant conditions. The inspector had no further questions on this ite Unresolved Item (311/80-16-02) Replace PORV limit switches with qualified substitute By inspection of PORV's 2PR1 and 2PR2 and review of design change documentation (DCP 2 EC-0818), the inspector confirmed that NAMCO type EA 180-11302 limit switches have been installed on the valves as specified in the design package to provide qualified switches. The licensee's response to IE Bulletin 79-0lB asserts that these are qualtfied limit switche *
(Closed)
(Closed)
(Open)
SITE
Unresolved Item (272/79-25-01)
Procedure for fire door fouling with cable and hos The inspector reviewed Fire Fighting and Organization Manual, Revision 5, dated September 15, 1980. Section 3.2.7 now includes a statement that fire doors must remain operable at all time Any door prevented from closing must be attended by a fire watc The licensee has instituted a program of placing signs on each fire door requiring notification of shift supervision in the event that a door must be blocked ope Follow Item (272/80-32-03)
Review of natural circulation cooldown procedur The inspector reviewed emergency instruction EI-I-4.9, Blackout, Revision 10, dated September 19, 1980. Appendix I to this procedure detail~ steps for cooldown in a natural circulation mode. *The appendix addresses the possibility of voiding and pro-vides cooldown and depressurization limits of 25°/hr and 750 psi/hr, respectively. A similar procedure is provided in the loss of com-ponent cooling emergency instruction. The inspector had no further questions on this ite Follow Item (272/80-20*05) Annual requalification training. The inspector observed a presentation of the annual requalification training presented to licensee employee The previous items regarding instructor familiarity, station emergencies, and respira-tory protection were acceptable. The instructor mentioned the Radiation Exposure Pennit (REP) but did not provide details regarding its us Some individual exposure limits listed in 10 CFR 20 were not presented in the review. Various areas such as contaminated area, restricted area, radiation area, and high radiation area were not clearly explained nor demonstrated with specific site illustra-tions. The licensee stated that the lesson plan was being rewritten, and these items would be included in the changes. This item remains open and will be reviewed during a subsequent inspectio. Shift Logs and Operating Records The inspector reviewed the following plant procedures to detennine the licensee established requirements in this area in preparation for a review of selected logs and record AP-5, Operating Practices, Revision 10, May 21, 1980; AP-6, Operational Incidents, Revision 6, February 22, 1979; AP-13, Control of Lifted Leads and Jumpers, Revision 4, February 11, 1980; Operations Directive Manual; and, AP-15, Safety Tagging Program, Revision 1, November 21, 198 The inspector had no questions in this are ~ Shift logs and operating records were reviewed to verify that:
Control room log sheet entries are filled out and initialled; Auxiliary log sheets are filled out and initialled; Log entries involving abnonnal conditions provide sufficient detail to communicate equipment status, lockout status, correction and restoration; Log book reviews are being conducted by the staff; Operating orders do not c.onflict with Technical Specification requirements; Incident reports detail no violati9n of Technical Specification LCO or reporting requirement; and, Logs and records were maintained in accordance with Technical Specifications and the procedures in 3.a abov c. The review included the following plant shift logs and operating records as indicated and discussed with licensee personnel:
Log No. 1 - Control Room Daily Log, January 1-31, 1981 Log No. 6 - Primary Plant Log, January 1-31; 1981 Log No. 7 - Secondary Plant Log, January 1-31, 1981 Log No. 8 - Unavailable Equipment Status Log, January 1-31, 1981 Night Orders, December 27, 1980 - January 16, 1981 Lifted Lead and Jumper Log - All active Nonconfonnance Reports for December 1980 Incident Reports80-363, 373, 389, 391-408, 411-413; 81-6, 9, 16, 17' 19-21 The inspector had no questions relative to logs reviewed during this inspection period *
6 Plant Tour a~ During the course of the inspections, the inspector made observations and conducted multiple tours of plant areas, including the following; (1)
Control Room (daily)
(2)
Relay Rooms (3)
Auxiliary Building (4)
Vital Switchgear Rooms ( 5)
Turbine Building (6)
Yard Areas (7)
Radwaste Building (8)
Penetration Areas (9) - Control Point (10) Site Perimeter (11) Fuel Handling Building (12) Containment The following detenninations were made:
Monitoring instrumentation: The inspector verified that selected instruments were functional and demonstrated parameters within T_echnical Specification 1 imit Valve positions. The inspector verified that selected valves were in the position or condition required by Technical Specifications for the applicable plant mode. This verification included control board indication and field observation of valve position (Charging/
Safety Injection, Auxiliary Feedwater, and Containment Spray Systems).
Radiation Control The inspector verified by* observation that control point procedures and posting requirements were being followe Plant housekeeping conditions. Observations relative to plant house~
keeping identified no unsatisfactory condition Fluid leak No fluid leaks were observed which had not been identi-fied by station personnel and for which corrective action had not been initiated, as necessary.
Piping vibratio No excessive piping vibrations were observed and no adverse conditions were note Selected pipe hangers and seismic restraints were observed and no adverse conditions were note Equipment tagging. The inspector selected plant components for which valid tagging requests were in effect and verified that the tags were in place and the equipment in the condition specifie Control room annunciators. Selected lit annunciators were discussed with control room operators to verify that the reasons for them were understood and corrective action, if required, was being take By frequent observation through the inspection, the inspector verified that cqntrol room manning requirements of 10 CFR 50.54 lk) and the.
Technical Specifications were being met *. In addition, the inspector observed shift turnovers to verify that continuity of system status was maintained. The inspector periodically questioned shift personnel relative to their awareness of plant conditions and knowledge of emergency procedure Release On a sampling basis, the inspector verified that appropriate documentation, sampling, authorization, and.monitoring instrumentation, were provided for effluent releases *
Technical Specifications. Through log review and direct observations during tours, the inspector verified compliance with selected Technical Specification Limiting Conditions for Operation. The following para-meters were sampled frequently:
RWST level, BAST level and temperature, containment temperature, boration flow path, shutdown margin, offsite powe In addition, the inspector conducted periodic visual checks of protective instrumentation and inspection of electrical switchboards
. to confirm availability of safeguards equipmen Security. During the course of these inspections, observations relative to protected and vital area security were made, including access con-trols, boundary integrity, search, escort, and badgin Items identified relative to security are covered in a separate NRC Investigation report (50-272/80-02 and 50-311/80-03).
c. The following acceptance criteria were used for the above items:
Technical Specifications Operation Directives Manual Inspector Judgement The inspector had no questions relative to tours made during this inspection.
l 5. Full Power License Conditions (Unit 2) On January 14, 1981, the NRC staff, including the Senior Resident Inspector, briefed the Commission on the status of Salem Unit 2 and the proposed licensing action to authorize operation in excess *of 5% rated thermal powe Included in the briefing were the draft license and Technical Specifications. The draft license includes conditions relating to actions responsive to staff concerns, NUREG-0694 and NUREG-073 The inspector reviewed a number of these items to determine status of implementatio The following comments apply to the areas reviewed:
Task II.E.1.1 - Auxiliary Feedwater System Reliabilit The Demineralized Water supply line drain in the 64' elevation switchgear room has been hard-piped tothe floor and tenninates approximately 2 feet from a floor drai Emergency Instruction, EI-I-4.1, Flooding or High Wind Conditions, Revision 6, dated April 25, 1979, with on-the-spot change P-1, dated November 29, 1980 is in place and requires the installation of the Auxiliary Feedwater-Service Water spool piece upon receipt of a tornado warnin Task I.D.l - Control Room Design Review *
Alann annunciator systems have been modified to provide considerably increased sound levels over those previously available. Initial settings were found to be uncomfortably loud. The inspector was present in the control room when the alanns were set under conditions of emergency ventilation and considered a level of 10 db above back-ground in the 4000 Hz (center frequency) band adequate. All alarm speakers have been set at least 10 db above emergency supply fan backgroun The licensee, in correspondence dated January 16, 1981, provided the basis for this setting to the Office of Nuclear Reactor Regulatio Plant Operations a. Unit 1 tripped* from 100% power at 9:56 AM on January 19 due to low-low steam generator leve No. 11 Steam Generator Feed Pump had tripped on an indicated overspeed condition, resulting in the low levels. Investi-gation identified no cause for the overspeed trip, however several electronic components were replaced. The reactor was critical at 4:56 P Two subsequent trips occurred from low power levels at 11:20 PM and 1:59 AM on January 2 In each case, the cause was low-low level in No. 14 steam generator {18% level trip point). Criticality was achieved at 2:54 AM on January 2 At 4:00 PM on January 21, 1981 reactor power was back at 100%.
Unit 1 again tripped from 100%.power at 7:07 PM on January 26. While conducting functional checks on power range flux channel N-42, with the bistables tripped by procedure, the technician pulled signal cables for N-41, completing the 2 of 4 trip logic. The reactor was critical at 12:57 AM on January 27. Delays in latching the turbine were* experienced while resolving a problem with low EHC autostop oil pressure. The unit synchronized to the grid at 6:29 AM on January 27. All systems func-tioned normally on the trip. During power ascension following restart excessive vibration was experienced on No. 11 Steam Generator Feed Pum The pump was taken out of service and power was limited to approximately 65% with the remaining feedwater pum At approximately 3:00 PM on January 29, containment sump pump start/
stop times indicated a leak in containment on the order of 4 to 5 gp Investigation inside containment indicated a possible service water leak from cooler tubes.in No. 12 Containment Fan Cooling Unit. This was reported to the NRC duty officer in accordance with IE Bulletin 80-24. Later investigation could not confirm a leak from the CFCU. *
Subsequent evaluations included a detennination of accuracy of sump pump start/stop level instrumentatio No other indicators, including water inventory, activity, sump overflow, or visual inspection confirmed leakage into containmen It WQ.S ultimately determined that short-
. cycling of the sump pump caused an erroneously high leak rate detenninatio Repairs. to service water piping outside containment serving No. 11 Containment Fan Coil Unit extended until 10:15 AM on January 30, at which time the. 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action Statement expired. Plant load reductio*n was initiate NRR authorized an emergency Technical Specification change which modified the Action Statement to 7 days, consistent with Unit 2 Technical Specifications (standard).
No. 11 CFCU was in service by noon-on January 30:,-198 A manual turbine trip/reactor trip was initiated at 1:45 PM on January 30 due to increasing turbine bearing temperatures. The cause was identified as a service water control valve which had drifted shu Unit return to service was delayed by repairs to containment sump pump controls, repair of a flange leak in an RTD bypass loop, and a trip from low power due to low steam generator level. The plant was critical at 3:47 PM on January 31 and synchronized at 9:03 PM *an January 3 The inspector had no questions relative to licensee response on the above situation During a Unit 1 control room tour on January 20, with the plant in Mode 2 and startup in progress, the inspector noted that Auxiliary Feedwater Storage Tank indicated level was 86%.
The minimum required by Technical Specification 3.7.1.3 is 200,000 gallons which corresponds to approximately 94% level. The Action Statement requires restoration in level within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. At the time of this observation, reactor power was approximately 2% with auxiliary feedwater in servic No action had been taken to restore level or acknowledge entry into the corresponding action statement *
Licensee procedures require a log entry to be made when entering an Action Statement of the Technical Specification * *
A review of operating logs on January 8, identified instances on January
- 7 and 8, in which Number l Fire Pump Day Tank 1 evel was recorded as 26
and 28 11 respectively. The minimum required by Technical Specification 4.7.10.1.2 corresponds to approximately 30.5
. an Action Statement of the Technical Specifications was in effect could be identified and no corrective action to increase level was taken until the item was brought to the attention of the operators by the inspecto On January 27, the inspector noted that Pressurizer Overpressure Pro-tection Channel 2 (2PR48) was not in service on Unit No reason could be detennined by operators and the channel was placed in servic Technical Specification 3.4.9.3 requires both channels to be operable and permits, under an Action Statement, inoperability of one channel for up to seven day No acknowledgement of the Action Statement appli-cability was iden~ifie *
The above failures to acknowledge an Action Statement of the Technical Specifications and making of appropriate log entries constitute an apparent item of noncompliance (272/81-01-02) (311/81-01-01).
Emergency Procedures for Coping With ATWS Events The inspector reviewed licensee procedures and practices to ensure that adequate guidance is provided to operators if rod insertion fails to occur when a reactor trip is initiated *
The inspector reviewed Emergency Instruction I-4.3, Reactor Trip. This instruction specifically addresses a failure of one or more control rods to insert. In the event that reactor trip does not occur, the operator is directed to perfonn the following actions:
a) Operate a console reactor trip button b) Operate the console turbine trip butto c) Open the trip breakers at the consol d)
Initiate safety injectio e)
Open the trip breakers locall f) Trip the rod drive motor-generator sets at the local breaker *
. Any of the above actions should de-energize the control rod drive mechanisms causing rod insertion. Safety injection is initiated vice rapid boration to provide for immediate injection of borated water and the addition of another reactor trip signa The inspector noted that no direction is provided for the operator to manually insert (drive in) the control rods. Discussion with the licensee and review of the magnetic jack mechanism design revealed that gravity is the only motive force causing rod insertion. Accordingly, de-energizing the control rod drive mechanisms should be more effective than driving in the control rods *
The emergency procedure provides for further action when one or more control rods fail to insert. In this case, rapid boration at 150 gpm for eight minutes is specified for each rod not fully inserted. The procedure details the steps for rapid boration. All steps can be per-fonned at the operator console in the control roo The inspector had no further questions relative to the above procedure at this tim *
d. During a tour of the switchgear room for unit 2, the inspector observed a jumper extending between two adjacent electrical cabinets. The inspector was not aware of any testing or plant conditions requiring the jumper, and investigated the reason for the installed jumpe The jumper was installed earlier during the performance of Startup Test Procedure 70.3. A change to the test procedure for convenient installa-tiori of test gear provided for the installation of the jumper. Subsequent steps in the procedure required removal of the test gear. The jumper should have been.removed but was apparently misse The change to the procedure did not specifically provide for the removal of the jumpe Since the jumper was installed pursuant to a test procedure, it was not subject to control by administrative procedures regarding installation of temporary jumpers. The j_umper fac_il itaJ;ed test instrumentation and.
did not affect any safety related function The jumper was remove The inspector had no further question. Fuel Cycle 3 Startup Testing a. *The inspector discussed the quadrant power tilt observed during tne Unit 1 startup with the Senior Reactor Staff Supervisor, reviewed incore flux maps and analyses and reviewed WCAP-8927, "The Nuclear Design of Salem Unit 1 Power Plant, Cycie 3
, October 1980, and Westinghouse letter, FP-PS-358, "Unit 1, Cycle 3 Incore Constants", dated December 2, 198 Comparing Flux Map # 1301, taken December 21, 1980 at 3.5% Rated Thennal Power with the quadrant power tilt calcualted in WCAP-.9827, the inspector developed the following data:
Bank D @ 212, 1258 ppm B Measured, Map 1301 1.0666 0.989 1.039 0.906 All Rods Out, Hot Zero Power calculated, WCAP-9827 1.008 1.023 1.015 0.954 Unit 1 attained Xenon equilibrium at 100% Rated Thermal Power on January 1 The inspector developed the following data from incore Flux Map
- 1313 taken January 13 and the Westinghouse letter on Incore Constants referenced above:
Bank D @ 228, 741 ppn B All Rods Out, Hot Full Power Measured, MaE 1313 calcu1ited 2 FP-PS-358 1.011 0.992 1.000 1.007 1.024 0.973 1.007 0.986
- The incore calculation for Map 1313 was compared to Technical Speci-fications as follows:
Parameter Fxy
~~H FQ(Z)
TS limit Map 1313 Calculation (most limiting value)
<:::: 1.65 (6 to 12. ft) 1.6334 c:: 1. 55
< 2.32K(Z)
1.4166 Within limits at all axial locations The quadrant power tilt determined by the incore flux detector system and computer analysis of flux data generally follows that predicted by the Westinghouse nuclear design with respect to shape, but is slightly greater than the predicted magnitude Comparison of calculated hot-
- . channel factors with Technical Specification limits for the core a % Rated Thennal Power showed all factors to be within limits *. Additional startup test results were reviewed to confirm that the pre-scribed program had been completed. These included isothermal temperature coefficient, power *coefficient, and rod worth measurement The inspector had no questions relative to test results reviewed *
8. Maintenance During unit 1 *startup after a reactor trip, excessive vibration was experienced in #11 Main Feed Pump/Turbin The feedpump and turbine were shut down for further investigation. Initial inspection required removal and inspection of the thrust and journal bearings. The turbine inboard journal bearing was wipe The outboard pump and turbine journal bearings were replaced. The turbine was run disconnected, and no unusual vibrations were observe An inde-pendent testing agency was contracted to instrument, test and evaluate the feed pum During startup, minor vibrations were experienced in the axial direction, but have been attributed to high background reading A full load test is in progress at the conclusion of this inspection period. A formal report will be provided to the licensee at the conclusion of this evaluation. Tentatively, the reports will contain the evaluation results plus any recommendations regarding future operation of the feed pump Apart from the pending evaluation, no obvious cause has been attributed to the excessive vibration and wiped bearing. The inspector will review the results of the evaluation during routine inspectio The inspector observed portions of the bearing removal and reinstallation and had no further question The inspector reviewed the calibration procedures for the general area beta-gamma air monitoring systems, AMS-2 and AMS III. The inspector compared the manufacturer's technical manual with the licensee's cali-bration procedures, PD-15.9.012 (Rev 0) for the AMS-2 and PD-15.9.027 (Revision 0) for the AMS II *
Both procedures require the detector efficiencies to be recorded in a lo The inspector observed that there were no maximum or minimum values specified in the procedures for detector efficiency. The licensee stated that the efficiency was for conversion from disintegrations to counts per minute and not used to determine the acceptability of the detector's performance. The inspector observed that the calibration procedure for the AMS-2 provides for calibration of the meter but not the chart recorder. The licensee stated that the recorder was used to indicate trends and not for quantitative values. Based on the intended use of the monitors, the inspector found these items acceptable. The inspector further noted that the AMS III requires a calibration/flow check with an air flow indicator. The AMS-2 procedure does not require the air flow to be calibrated or checke The licensee stated that this would be included in the procedure. This item is open (272/81-01-05)
pending revision of the procedure to include air flow calibratio. Fire Protection a. During the inspection period, the inspector noted various fire doors which could not be considered fully serviceable. The deficiencies
. ranged from broken latches to broken door closure devices. Conversation with licensee personnel revealed over fifty work orders had been issued to repair fire doors. After the day shift for the final work day of this report period, the inspector identified the*following fire doors with degraqed conditions as noted:
Location Elevation Number Remarks Aux ~~
100
36 blocked open
"
"
100
35 closure mechanism broken
"
"
100'
394 fouled with electrical cable
"
"
100'
closure mechanism broken
"
"
122'
438 air pressure differential
"
"
1 (access to diesel fuel tank)
blocked open
"
"
88'
361 blocked open
"
"
88'
fouled with electrical cable
"
"
100'
air pressure differential
"
"
100'
374 closure device broken There were no attendant fire watches for any of these door The inspector provided the above information to the Senior Shift Supervisor and a member of the security force who had been tasked to inspect the fire door His survey coincided with the NRC inspector's. This item (fire doors) was previously identified in NRC Inspection Report 50-272/80-27. This item is unresolved pending an evaluation of the licensee's correction of the previous item (272/81-01-06).
14 During a plant tour, the inspector noted that two Unit 2 fire hose sta-tions were inoperable in that the hoses had been disconnected from their standpipe connections and the reels were on the floor some distance awa One reel, inside Unit 2 containment, was located under a stairwell next to the standpipe (2FP88J. This hose is required to be operable by.
Technical Specifications whenever equipment in the area is required to be operable. Periodic surveillance, conducted on January 2, 1981 had identified the reel as missing and no action had been taken by the time of discovery by the inspector during the week of January 19, 198 Immediate. action to restore the hose reels to operable status was take The inspector expressed his concern that a hose reel required by Technical Specifications during operation had not been made operable in a more
'
timely fashio The licensee acknowledged the inspector's remark This item will continue to be inspected on a routine basis in the con- *
tinuing inspection program. *
10. Management Controls
- a. Amendment 27 to Unit 1 Facility Operating License DPR-70 adds surveillance requirement 4.5.2.g which requires the verification of ECCS throttle valve positions within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following compietion of each val~e stroking operation or maintenance on the valve when ECCS subsystems are required to be operable *.
In reviewing the monthly operating report for December 1980, the inspector noted that several of these throttle valves had been re-packed during the outag The applicable work orders included a post-maintenance require-ment to stroke the valve No documentation could be identified to con-finn the "as-left" position of the throttle valve Interviews revealed that conflicting direction had been given to operators who verify throttle valve positions during pre-startup valve lineups. For each throttle valve in question, the licensee performed a verification of the valve positio The following conditions were found:
VALVE NUMBER OF TURNS OPEN Valve As Found Reguired As Left 11 SJ 16 2 3/4 2 3/4 2 3/4 12 SJ 16 2 3/4 2 3/4 2 3/4 13 SJ 16 2 3/4 2 3/4 2 3/4 14 SJ 16 4 1/3 3 1/3 I
3 1/3 11 SJ 143
2
12 SJ 143 2 1/2 2 1/2 2 1/2 13 SJ 143 1 1/2 1 1/2 1 1/2 14 SJ 143 2 1/16 2 1/16 2 1/16 11 SJ 138
4 1/2 4 1/2 12 SJ 138 4 1/2 Full Open Full 13 SJ 138 5 1/2 4 1/2 4 1/2 14 SJ 138
5
...
Based on this finding, the licensee submitted Licensee Event Report 81-07 /Ol An eva 1 uati on of the va 1 ve mi sa 1 i gnment is in pro_gres The inspector determined that the applicable Technical Specification was issued by a license amendment which became effective after the subj.ect va 1 ve maintenance had been conducted. Addi ti ona l ly, a sub-sequent analysis by the licensee and NSSS vendor confirmed that the parti:cular valve misposition as referenced would not have prevented *
effective operation of the Safety Injection System in accordance with the design basi Fafl:ure to conduct an adequate verffication of ECCS throttle valve
- position constitutes an apparent item of noncompliarice (272/81-01-01). During control room observations, the inspector noted that the Auxiliary Feedwater Tank level instrument in Unit 2 was marked with a grease pen-cil notation indicating that the transmitter was frozen. The Tank is not required to be operable in Mode On another occasion, the two Unit l Refueling Waster Storage Tank level indicators were in disagree-ment; one indicated slightly greater than the minimum Technical Speci-fication requirement and one indicated slightly less. Operators indicated.
that a* local reading had been obtained to confirm the higher level as *
being correc No provision was made to indicate which obs*erved level in the control room was correc Further review by the inspector identified no formal mechanism established by the licensee for identifying control room instrumentation which may be erroneous due to malfunction or testing. Pending further review, this item is unresolved (272/81-01-04). By correspondence dated December 29, 1980, the licensee responded to an i tern of non comp 1 i ance detai"l ed.in NRC Inspection *'Repo.rt.* 50-272780~*23 dealing with failures to* secure high radiation areas. During tours of the facility, the inspector noted that until January 19, 1981, the licensee had not posted the item, nor the response, on plant bulletin board Title 10 Code of Federal Regulations Part 19.11 (a) states in part, 11 *** licensee shall post current copies of the following documents: *.*
(4) any notice of violation involving radiological working conditions,
- and anj:*response from the licensee." Part 19.11 (e) further requires that such posting take place within 2 days of receipt or dispatch and that the documents remain posted for 5 days or until action correcting the item has been take The above failure to post documents required by 10 CFR 19 constitutes an apparent item of noncompliance (272/81-01-03).
~-
1 Un re so 1 ved Items Areas for which more information is required to determine acceptability are considered unresolved. Unresolved items are contained in Paragraphs 8, 9, and 10 of this repor. Exit Interview At periodic intervals during the course*of this inspection, meetings were held with senior facility management to discuss inspection scope and findings *