IR 05000272/2021401

From kanterella
Jump to navigation Jump to search
And Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only)
ML21049A252
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/23/2021
From: Fred Bower
Plant Support Branch 1
To: Carr E
Public Service Enterprise Group
References
IR 2021401
Download: ML21049A252 (3)


Text

February 23, 2021

SUBJECT:

HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000354/2021401, 05000272/2021401 AND 05000311/2021401

Dear Mr. Carr:

On February 4, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2 and discussed the results of this inspection with Mr. Charles V. Mcfeaters, Senior Vice President of Nuclear Operations and other members of your staff. The results of this inspection are documented in the enclosed report. Remote inspections were completed on January 25-28, 2021, and on-site inspections were completed on February 2-4, 2021.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.12] - Avoid Complacency.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, X /RA/

Signed by: Fred L. Bower

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000354, 05000272 and 05000311 License Nos. NPF-57, DPR-70 and DPR-75

Enclosure:

As stated

cc w/o encl; w/o OUO-SRI: Distribution via LISTSERV

cc w/encl; w/OUO-SRI Paul Baldauf, Assistant Commissioner, Air Quality, Energy & Sustainability, New Jersey Department of Environmental Protection Robert (Rob) Brinsfield, Administrator, Office of Radiation Control, Delaware Division of Public Health Shane Blanchard, Security Operations Manager Russ Cronk, Security Technical Specialist

ML21049A255 (Cover letter w/ enclosure)

ADAMS ACCESSION NUMBER: ML21049A252 (Cover letter)

Entire Report:

X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available

Cover Letter Only:

X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available

OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS

NAME DCaron per email SMcCarver per email JRey per email BBickett per email FBower

DATE 2/17/21 2/16/21 2/17/21 2/18/21 2/23/21