Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power16 September 1999PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power
IR 05000272/19990011 April 1999Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
High Radiation Area
Fire Barrier
Condition Adverse to Quality
Maintenance Rule Program
Biofouling
Unidentified leakage
PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1 December 1998PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal
IR 05000272/19982029 July 1998Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities
ML20217N62224 April 1998Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects
ML20217E78525 July 1997Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept
ML20202D09731 March 1997Investigation Rept 1-95-013 on 970331.No Noncompliance Noted.Major Areas Investigated:Allegation Re Pse&G Intentionally Operated Outside Design Basis & Failed to Make Timely Notification to Nrc,Per 10CFR50.72Unanalyzed Condition
Condition Adverse to Quality
Exemption Request
GOTHIC
ML20137B60218 March 1997Notice of Violation Identified in Correspondence Between 961105 & 970212.Violations Noted:Conducted Requalification Program Such That Annual Operating Test Not Provided for Fourteen Plant Licensed Operators in CY96
IR 05000272/19970035 February 1997Attachment to Insp Repts 50-272/97-03 & 50-311/97-03 ,consisting of 970205 Slide Presentation Inadvertently Omitted from Repts
ML20134B67427 January 1997Notice of Violation from Insp on 961110-1221.Violations Noted:Vital Area Access Control & Badge Sys Requirements of Util Security Plan Were Not Implemented for Listed Examples
IR 05000354/199601027 January 1997Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program PlanUnanalyzed Condition
Ultimate heat sink
Stroke time
Squib
Foreign Material Exclusion
Through-Wall Leak
Operability Assessment
ML20133A44911 December 1996Notice of Violation from Insp on 960815-0903.Violation Noted:On 960814,vital Area Access Not Physically Controlled in That Positive Access Control Over Photobadge Keycards Compromised,Creating Opportunity for Unauthorized Access
ML20133A43411 December 1996Notice of Violation from Investigation Repts 1-94-006R & 1-94-053 on 940218-960430 & 941121-960425.Violation Noted: Licensee Through Former Manager of Nsr,Discriminated in Nov 93 & May 94 Against Former Onsite Safety Review Engineer
IR 05000272/19960133 December 1996Insp Repts 50-272/96-13 & 50-311/96-13 on 960812-0920. Violations Noted.Major Areas Inspected:Engineering Performance Issues That Require Resolution Prior to Plant RestartSafe Shutdown
Temporary Modification
Emergency Lighting
Foreign Material Exclusion
Operability Determination
Fire Protection Program
ML20135B26811 April 1995Notice of Violation from Investigation 1-93-021R.Violation Noted:C Vondra Deliberately Caused Pse&G to Violate 10CFR50.7 by Discriminating Against Two Employees for Engaging in Protected Activities
ML20135A9469 March 1994Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:On 931012,maint on Breaker for electro-hydraulic Pump Was Conducted W/O Supervisor Ensuring Equipment Was Tagged & Safe to Work onFuel cladding
PNO-I-93-068, on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R)7 December 1993PNO-I-93-068:on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R)
PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan12 November 1993PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan
PNO-I-93-060, on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified3 November 1993PNO-I-93-060:on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified
ML20058P93615 October 1993Notice of Violation from Insp on 920614-0725.Violation Noted:Licensee Determined Several Instances in Which Personnel Assigned to Fire Watch Patrols Failed to Perform or Complete Function as Required by TS & Falsified RecordsFire Barrier
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000272/199109929 July 1993Initial Draft SALP Repts 50-272/91-99,50-311/91-99 & 50-354/91-99 for 911229-930619Fire Barrier
Contraband
Temporary Modification
Missed surveillance
Job Performance Measure
Systematic Assessment of Licensee Performance
Fire Protection Program
Hourly Fire Watch
Siren
IR 05000272/199202127 January 1993Exam Repts 50-272/92-21OL & 50-311/92-21OL on 921214-17.Exam Results:All Six SRO Candidates Passed All Portions of Exam & Issued Licenses
PNO-I-92-075, upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes15 December 1992PNO-I-92-075:upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 MinutesTime of Discovery
PNO-I-90-056, on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed23 July 1990PNO-I-90-056:on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed
ML20246C40015 August 1989Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14
ML20247B6659 May 1989Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment ProgramsUltimate heat sink
Temporary Modification
Scaffolding
IR 05000272/198800618 March 1988Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt EffectivenessInattentive
IR 05000354/19860994 March 1988SALP Rept 50-354/86-99 on 861201-880115High Radiation Area
Grab sample
Temporary Modification
Missed surveillance
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Scaffolding
Unidentified leakage
Unidentified leak
Siren
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
IR 05000272/19860995 February 1988SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987Safe Shutdown
High Radiation Area
Fire Barrier
Weld Overlay
Locked High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Fire Protection Program
Fire Watch
Siren
IR 05000254/198702523 November 1987Insp Repts 50-254/87-25 & 50-265/87-25 on 870922-1105. Violations Noted.Major Areas Inspected:Licensee Implementation of Generic Ltr 85-06 Re ATWS Mitigation Sys (25020) & Onsite Followup Events
IR 05000272/19870269 November 1987Exam Repts 50-272/87-26OL & 50-311/87-26OL on 870915-17.Exam Results:All Four Senior Reactor Operator Candidates Passed Written & Operating Exams
ML20217F85427 October 1987PNS-I-87-017:on 871026,fireman Received Call of Bomb Threat at Plant.Search of Facility Proved Negative
PNO-I-87-099, on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway26 October 1987PNO-I-87-099:on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway
IR 05000272/198702720 October 1987Insp Rept 50-272/87-27 on 870921-25.No Violations Noted. Major Areas inspected:post-mod Test Program for Forthcoming Refueling Outage,Including Engineering Change (1EC) Packages,Mod Test Procedures & Test Specs
IR 05000272/198702117 August 1987Requalification Evaluation Repts 50-272/87-21OL & 50-311/87-26OL on 870615-19.Exam Results:Two Senior Reactor Operators & Three Reactor Operators Passed All Portions of Exam.Program Found Unsatisfactory,Per NUREG-1021
PNO-I-87-075A, on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas13 August 1987PNO-I-87-075A:on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected AreasBoric Acid
PNO-I-87-060, on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days6 July 1987PNO-I-87-060:on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days
PNO-I-87-059, on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc26 June 1987PNO-I-87-059:on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc
ML20154D45615 June 1987Notice of Violation from Insp on 831205-06 & 840116-20. Violations Noted:Fire Protection Features Not Provided for Certain Redundant Trains of Equipment &/Or Cabling Located Outside Primary ContainmentSafe Shutdown
Fire Barrier
Emergency Lighting
PNO-I-87-038, on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration29 April 1987PNO-I-87-038:on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration
IR 05000272/198700523 March 1987Insp Repts 50-272/87-05 & 50-311/87-07 on 870224-27.No Violations Identified.Major Areas Inspected:Control of Internal Exposures,Processing of Routine Survey Data, Organization & Staffing & Control of Radioactive Matl
ML20207S41812 March 1987Notice of Violation from Insp on 870127-0223
IR 05000272/198700311 March 1987Insp Repts 50-272/87-03 & 50-311/87-04 on 870127-0223. Violation Noted:Control & Testing of Containment Boundary Valves IncompleteFire Barrier
IR 05000311/198700510 March 1987Insp Rept 50-311/87-05 on 870203-06.No Violations Identified.Major Areas Inspected:Cycle 4 Startup Physics Testing Program,Precritical Tests,Low Power Physics Tests & Power Ascension TestsShutdown Margin
IR 05000311/19870069 March 1987Exam Rept 50-311/87-06OL on 870213.Exam Results:One Candidate Administered Oral Exam Failed Due to Lack of Knowledge of Tech Specs Unique to Unit 2
IR 05000272/19860234 March 1987Mgt Meeting Repts 50-272/86-23 & 50-311/86-23 on 870203. Major Areas Discussed:Findings Re Equipment Qualification Insp,Including Equipment Qualification of Limitorque Operators & Exo Sensors Hydrogen Analyzers
IR 05000272/198509827 February 1987Corrected SALP Repts 50-272/85-98 & 50-311/85-98 for Oct 1985 - Sept 1986High Radiation Area
Fire Barrier
Missed surveillance
Systematic Assessment of Licensee Performance
Fire Watch
Siren
ML20212B97520 February 1987Notice of Violation from Insp on 870112-16
IR 05000272/198700220 February 1987Insp Repts 50-272/87-02 & 50-311/87-02 on 870112-16. Violations Noted:Procedures Used in Performing Evaluation Found to Underestimate Anchor Bolt Loads When Compared to More Accurate Analytical Techniques