Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005)
ML23241A821
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/31/2023
From: Brice Bickett
NRC/RGN-I/DORS
To: Mcfeaters C
Public Service Enterprise Group
References
IR 2023005
Download: ML23241A821 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415

August 31, 2023

Charles McFeaters President and Chief Nuclear Officer PSEG Nuclear, LLC P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000272/2023 005 AND 05000311/2023 005)

Dear Charles McFeaters:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Salem Nuclear Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission ( NRC)

provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5312 with any questions you have regarding this letter.

Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety

Docket Nos. 05000272 and 05000311 License Nos. DPR-70 and DPR-75

Enclosure:

Salem Inspection Plan

cc w/encl: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000272/2023 005 AND 05000311/2023 005) DATED AUGUST 31, 2023

Distribution w/encl: (via email)

RLorson, RA (R1ORAMAIL RESOURCE)

DCollins, DRA (R1ORAMAIL RESOURCE)

BWelling, DORS (R1DORSMAIL RESOURCE)

RMckinley DORS (R1DORSMAIL RESOURCE)

PKrohn, DRSS (R1DRSSMAIL RESOURCE)

JQuichocho, DRS S (R1DRSSMAIL RESOURCE)

AZiedonis, DORS BBickett, DORS EEve, DORS RClagg, DORS KMooney, DORS JDolecki, DORS, SRI NGarcia, DORS, RI CFragman, DORS,AA JJosey, RI OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDroIrib Resource ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -24 Second Quarter Process/Branch 3/ROP-24_SL_IP Transmittal Ltr & Report 22.docx ADAMS Accession No. ML23241A821 n -Sensitive Publvlle SUNSI Review Sensitive n -Publiclyvlable

OFFICE RI/DORS RI/DORS ME EEve BBickett TE /2023 /2023 OFFIAL RERD CO Site Inspection Activity Plan Salem

07/01/2023 - 06/30/2025

Unit Start End Activity CAC Title Staff Count

RP Rad Instrumentation 71124.05 1

1,2 8/7/2023 8/11/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

PI&R Team Inspection - Salem 4

1,2 8/14/2023 8/18/2023 IP 71152B 000747 Problem Identification and Resolution

1,2 8/28/2023 9/1/2023 IP 71152B 000747 Problem Identification and Resolution

Material Control and Accounting - Salem Units 1 and 2 1

1,2 9/11/2023 9/20/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

Salem Requal Inspection with P/F Results 2

1,2 9/18/2023 9/22/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/18/2023 9/22/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Access Control, Equipment, Sec Trng, Sec Plan Review, PI-SAL 3

1,2 9/18/2023 9/22/2023 IP 71130.02 000734 Access Control

1,2 9/18/2023 9/22/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 9/18/2023 9/22/2023 IP 71130.07 000739 Security Training

1,2 9/18/2023 9/22/2023 IP 71130.09 001656 Security Plan Changes

1,2 9/18/2023 9/22/2023 IP 71151 001338 Performance Indicator Verification

Inservice Inspection - Salem 1

1 10/16/2023 10/27/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazard Assess and Control 71124.01 1

1,2 10/23/2023 10/27/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

RP Perf Indicators IP71151 1

1,2 11/6/2023 11/9/2023 IP 71151 000746 Performance Indicator Verification

Access Auth, Fitness for Duty 2

1,2 2/5/2024 2/9/2024 IP 71130.01 000733 Access Authorization

1,2 2/5/2024 2/9/2024 IP 71130.08 000740 Fitness For Duty Program

Fire Protection - Salem 3

1,2 4/8/2024 4/12/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 4/22/2024 4/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EP Exercise Inspection - Salem 5

1,2 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 5/20/2024 5/24/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event

1,2 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification

Prepared on 8/23/2023 2:48:21 PM 1 of 3 Site Inspection Activity Plan

RP - 71124.03 Airborne and 71124.04 Dose 1

1,2 6/24/2024 6/28/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 6/24/2024 6/28/2024 IP 71124.04 000728 Occupational Dose Assessment

Cyber Security - Salem 4

1,2 8/12/2024 8/16/2024 IP 71130.10 000741 Cybersecurity

Access Control, Equipment Testing and Maintenance, Training, SPR 3

1,2 8/26/2024 8/30/2024 IP 71130.02 000734 Access Control

1,2 8/26/2024 8/30/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training

1,2 8/26/2024 8/30/2024 IP 71130.09 001656 Security Plan Changes

1,2 8/26/2024 8/30/2024 IP 71151 001338 Performance Indicator Verification

Inservice Inspection - Salem Unit 2 1

2 10/14/2024 10/25/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 71124.01 Rad Hazard Control 1

1,2 10/14/2024 10/18/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

RP 71151 PI Verification 1

1,2 12/9/2024 12/13/2024 IP 71151 000746 Performance Indicator Verification

2025 Salem Initial License Examination 4

1,2 12/16/2024 12/20/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 1/13/2025 1/17/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

PI&R BIENNIAL TEAM INSPECTION - SALEM 4

1,2 1/27/2025 1/31/2025 IP 71152B 000747 Problem Identification and Resolution

1,2 2/10/2025 2/14/2025 IP 71152B 000747 Problem Identification and Resolution

EP Program Inspection - Salem 2

1,2 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing

1,2 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification

Inservice Inspection - Salem Unit 1 1

1 4/7/2025 4/18/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazard 71124.01 1

1,2 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

RP RETS 71124.06 1

1,2 5/5/2025 5/9/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

RP Radwaste 71124.08 1

Prepared on 8/23/2023 2:48:21 PM 2 of 3 Site Inspection Activity Plan

1,2 6/9/2025 6/13/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Access Control, Protective Strategy, TSR, SPR, PIs - Salem 4

1,2 6/9/2025 6/13/2025 IP 71130.02 000734 Access Control

1,2 6/9/2025 6/13/2025 IP 71130.05 000737 Protective Strategy Evaluation

1,2 6/9/2025 6/13/2025 IP 71130.09 001656 Security Plan Changes

1,2 6/9/2025 6/13/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

1,2 6/9/2025 6/13/2025 IP 71151 001338 Performance Indicator Verification

Prepared on 8/23/2023 2:48:21 PM 3 of 3