IR 05000272/1981008

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-272/81-08 & 50-311/81-09 on 810406-09.No Noncompliance Noted
ML18086A602
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/14/1981
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
Shared Package
ML18086A603 List:
References
NUDOCS 8106030501
Download: ML18086A602 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-272 50-311 Public Service Electric and Gas Company ATTN:

Mr. F. W. Schneider Vice President - Production 80 Park Plaza - 15A Newark, New Jersey 07101 Gentlemen:

Subject:

Combined Inspections 50-272/81-08 and 14 MAY 1981 This refers to the special, announced emergency preparedness inspection conducted by a team led by Mr. D. Donaldson of this office on April 6-9, 1981, at the Salem Nuclear Generating Station.(SNGS), Units 1 and 2, of activities authorized by NRC License Nos. DPR-70 and DPR-75 and to the discussions of our findings held by Mr. Donaldson and other members of the NRC team with Mr. R. Eckert, you, and members of your staff at the conclusion of the inspectio Areas examined during this inspection are describ~d in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspecto Within the scope of this inspection, no items of noncompliance were observe In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC 1 s Public Document Roo If this report contains any information that you (or your contractors) believe to be exem~t from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such informatio Consistent with section 2.790(b)(l), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosur This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld sha11 be incorporated as far as possible into a separate part of the affidavi If we do not hear from you in this regard within the

1--

....

Public Service Electric and Gas Company

14 MAY 1981 specified periods noted above, the report will be placed in the Public Document Roo The telephone notification of your intent to request withholding, or any request for an extension of the 10 day period which you believe necessary, should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-522 No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with yo

Sincerely,

~pd~

Bo'fce H. Grier Director Enclosure:

Combined Office of Inspection and Enforcement Inspection Report Numbers 50-272/81-08 and 50-311/81-09 cc w/encl:

R. Eckert, Senior Vice President, Energy Supply and Engineering J. T. Boettger, General Manager, Corporate Quality Assurance R. L. Mittl, General Manager - Licensing and Environment H. J. Midura, Manager - Salem Generating Station R. A. Uderitz, General Manager - Nuclear Production