ML20133C818

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-35 & 50-457/85-34 on 850715-18.No Violations Noted
ML20133C818
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/31/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133C820 List:
References
NUDOCS 8508070148
Download: ML20133C818 (2)


See also: IR 05000456/1985035

Text

r ., _

.

'

'

. .

'

.

,

I

.

JUL 31198_5

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice Presfdent *

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward of

this office on July 15-18, 1985 of activities at Braidwood Nuclear Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. L. Kline at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations with NRC requirements were identified during the course of this

inspection.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure (s) will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

OPIGi nal Sfsnad by J 'J. 1:arrison

-

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No.50-456/85035(DRS);

No. 50-457/85034(DRS)

See Attached List For Distribution

!

I

I

56 l

PDR

1Edt

.

9 I

o . .

a

Comonwealth Edison Company 2 JUL 311985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station

p Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident-Inspector, RIII

Braidwood ,

Resident Inspector, RIII Byron

-

Phyllis Dunton, Attorney

General's Office Environmental

. Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

. H. S. Taylor, Quality Assurance

,

'

Division

E. Chan, ELD

J. Stevens, NRR

,

C(

l

- '

( -

rd/j Da ielson elke H rrison

07/29/85 t3i 1) 1(3 (

l-

-

e - - ,-. -_ , . _ . , , , _ _ . , . , . - - . , - ,