05000295/LER-1979-076, Forwards LER 79-076/03L-0

From kanterella
Revision as of 13:56, 3 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-076/03L-0
ML19260B211
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 11/09/1979
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19260B212 List:
References
NUDOCS 7912070418
Download: ML19260B211 (1)


LER-1979-076, Forwards LER 79-076/03L-0
Event date:
Report date:
2951979076R00 - NRC Website

text

.. - -

1

{C{

Commonwealth Edison Zion Generating Station Shiloh Blvd. & Lake Michigan Zion, Ilknois 60099 Telephone 312/746 2084 November 9, 1979 Mr. Jac7s G.

Keppler Regional Director Directorate of Regulatory Operations Region III U.

S.

N.tclear Regulatory Commission Glen Ellyn, Illinois 60137

Reference:

Zion Generating Station Docket No. 50-295/DPR-39 Technical Specification, Section 6.6.2

Dear Mr. Keppler:

Enclosed please find Reportable Occurrence Reoort No.

50-295/79-76 for Zion Generating Station.

This report is submitted to you in accordance with the requirements of the Technical Specificationc. Section 6.6.2.

b. (2), which states that conditions leading tu operation in a degraded mode permitted by a limiting condition for oper-ation or plant shutdown required by a limiting condition for operation requires a 30 day written report.

Very truly yours, L4.-.

N.

E.

Wandke Superintendent Zion Station CLR/klk

Enclosure:

Reportable Occurrence Report No. 50-295/79-76 vav 3 01970 goa 1514 163 5ll/

y/f 7912070 W

0