ML20238C902

From kanterella
Revision as of 10:43, 19 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Commission Will Not Authorize Restart Until Satisfied That Public Health & Safety Will Not Be Compromised,In Response to Encl .Three Meetings to Receive Public Comments Already Conducted
ML20238C902
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/22/1987
From: Zech L
NRC COMMISSION (OCM)
To: Sarbanes P
SENATE
Shared Package
ML20238C904 List:
References
NUDOCS 8712310313
Download: ML20238C902 (4)


Text

_ -

e nam 50"I1'IfYU

, d Io, UNITED STATES

! ,, j NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20555 g aE

. ' . . . . p$

CHAIRMAN December 22, 1987 The Honorable Paul S. Sarbanes United States Senate Washington, D.C. 20510

Dear Senator Sarbanes:

I am responding to your November 5, 1987 letter that expressed concerns about the PeachtBottomoAtomicsPower;5tation. I want to assure you that we are examining the facility's restart efforts and the licensee's proposed reorganization very carefully.

With regard to your' concern about the number of outstanding maintenance items at Peach Bottom and the need to properly address all maintenance problems, I can assure you that the Commission will not authorize restart until it is satisfied that public health and safety will not be compromised because of these items. However, this is not to say that all outstanding maintenance items will be completed prior to restart. There are always a number of outstanding maintenance items at any nuclear i power plant, including preventive and corrective maintenance actions, facility enhancements, and routine refurbishment of structures, systems, and components. Our inspectors are closely monitoring the licensee's maintenance activities and will ensure that all maintenance items that potentially impact public health and safety are addressed prior to restart of the plant.

Concerr.ing your request for a public meetin.g before a final decision is made regarding Peach Bottom's operating status, we have already conducted three meetings in the local area to receive public comments. We have also met with state and local officials numerous times. The need for further meetings is presently being evaluated, including additional staff briefings of the Commission. The Commission fully intends to meet in public session with NRC staff and the licensee before authorizing restart.

The Commission is closely monitoring the Peach Bottom plants. We will ensure that they can be safely operated before a decision on restart of these facilities is reached.

Sincerely, 8712310313 B71222 w, PDR COMMS NRCC CORRESPONDENCE PDR Lando W. Ze , Jr.

Originated: RI:Linville

s.

DISTRIBUTION V. Stello J. Taylor T. Rehm T. Murley J. Murray W. Russell J. Allan W. Kane S. Collins E. Wenzinger J. Linville  !

T. Johson {

S. Varga B. Boger 3 W. Butler l R. Martin EDO 003316 Secy No. 1336 Docket No. 50-277/278 Public Document Room Local Public Document Room EDO Reading File-Commonwealth of Pennsylvania GPA/CA Identical Letters Sent To:

Senator Mikulski Rep. Dyson l Rep. Bentley Rep. Hoyer Rep. McMillen l

Rep. Cardin l Rep. Mfume Rep. Morella

K  :. :

  1. ~-

UNITED STATES ib,!

p ~~' i., NUCLEAR REGULATORY COMMISSION -!

g j .. y/ASHINGTON, D. C,20555 .

4.....$ >

a - - .

f

  • kS,' d d be n $2 EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: jOUE: 12/04/87 .EDO CONTROL: 003316 DOC DT: 11/05/07 SEN. BARBARA A. MIKULSKI FINAL REPLY:

SEN. PAUL S..SARBANES, ET. ALAN TO:

CHAIRMAN 2ECH FdR SIGNATURE OF: ** PRIORITY ** SECY NO: 1336  !

CHAIRMAN DESC: ROUTING:

CONCERNS RE PEACH BOTTOM AND REQUEST PUBLIC STELLO MEETING TAYLOR REHM' DATE: 11/24/87 MURLEY ASSIGNED TO: RI CONTACTt RUSSELL, , MURRAY SPECIAL INSTRUCTIONS OR REMARKS:

a. _. . - .

. o '

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER: CRC-87-1336 LOGGING DATE: Nov 20 87 ACTION'bFFICE: g gDo AUTHOR: B.A. Mikulski, P Sarbanes etc; AFFILIATION: U.S. SENATE LETTER DATE: Nov 5 87 FILE CODE: ID&R-5 Peach Bottom-

SUBJECT:

Urges the Comm to conduct a public meeting.

regarding the re-opening of the Peach Bottom facility ACTION: Signature of Chairman DISTRIBUTION: OCA to Ack, Docket, EDO, RF SPECIAL HANDLING: None NOTES: -

DATE DUE: Dec 4 87 SIGNATURE: .

DATE SIGNED:

AFFILIATION:

Rec'd Off. EDO Date__ it . Av sgg

. Time _ // 4 s

EDO --- 003316