Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 1999-09-09
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20055C7241990-06-14014 June 1990 Responds to Forwarding Constituent Gordon Ltr Re Screening Procedures for Gaining Access to Plant.Specific Access Requirements That Apply to Licensee Stated in Security Plan,Per 10CFR73.55(d) ML20244D3151989-04-14014 April 1989 Responds to Requesting That NRC Reserve Judgement on Plant Restart Until Issues Raised by State of MD Residents Addressed.Public Hearing Scheduled on 890417 in Rockville,Md to Consider Possible Restart ML20245F3581989-04-14014 April 1989 Responds to Requesting That NRC Reserve Judgement on Plant Restart Until Issues Raised by State of MD Residents Addressed.Commission Will Not Permit Restart of Plant Unless Public Health & Safety Assured ML20195B4051988-10-25025 October 1988 Responds to Re Concerns Raised by P Hammond on Restart of Plant.Hammond Ltr Does Not Provide Basis to Permanently Shutdown Plant ML20205C5771988-10-0404 October 1988 Responds to Re B Risacher Request That ACRS Address & Respond to Concerns Re Proposed Restart of Plant ML20155E9791988-10-0404 October 1988 Responds to Re Status of Commonwealth of PA Governor RP Casey Request for Public Hearings Before Resumption of Operations at Facilities.Integrated Assessment Team Insp Will Be Conducted in Nov 1988 ML20247E4021988-09-16016 September 1988 Informs of Commonwealth of PA Vs NRC Litigation Re NRC Use of Authority to Issue Immediately Effective License Amends Upon Finding of NSHC Involved.Commonwealth Challenging Amends to Plant Licenses ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20151G9611988-07-19019 July 1988 Responds to Re Public Participation in Commission Decision Concerning Restart of Plant.Results of Ongoing Gao Study Will Be Considered in Restart Decision ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20197F6211988-05-27027 May 1988 Forwards Commission Responses to Questions Posed by Senator Mikulski Per Re Facility Restart.Responses Will Be Made Part of Record of Committee 880302 Hearing on NRC FY89 Budget Request ML20196B2851988-02-0202 February 1988 Informs That NRC Personnel Most Familiar W/Current Status of Plant Will Participate in Maryland Congressional Delegation 880204 Meeting,In Response to 880114 Request ML20149F8501987-12-30030 December 1987 Responds to Expressing Concerns Re Adequacy of Util Commitment to Excellence Action Plan & Info on NRC Actions in Response to Governor Schaefer .Revised Plan Requested from Util.Nrc Response to Schaefer Ltr Encl ML20238C9521987-12-23023 December 1987 Forwards NRC Response to Hunt Expressing Concerns About Lack of Adequate Public Notification of 871104 Meeting in Quarryville,Pa Re Util Commitment to Excellence Action Plan.Display Ads of Meeting Were in Local Newspapers ML20238C9021987-12-22022 December 1987 Informs That Commission Will Not Authorize Restart Until Satisfied That Public Health & Safety Will Not Be Compromised,In Response to Encl .Three Meetings to Receive Public Comments Already Conducted ML20236P3861987-08-0606 August 1987 Responds to Encl Re Concerns of R Wells Involving Shutdown of Plants.Based on Util Past Performance & Seriousness of Longstanding Pervasive Operator Inattentiveness While on Duty,Shutdown Order Necessary ML20236P0821987-08-0505 August 1987 Responds to Rs Walker Re Constituents Concern Re Mgt Problems at Plants & Withholding of Truth from Public About Possible Health Risks.Plants Will Remain Shut Down Until Recovery Plan Approved ML20235K3561987-07-10010 July 1987 Responds to Concerns Raised in CA Morella Based on 870414 Discussion Between NRC & State of MD Delegates Re Plant.Nrc Regulations Require That Security Programs Be Established.Related Info Encl ML20214J5261987-05-15015 May 1987 Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards ML20214J1171987-05-15015 May 1987 Expresses Appreciation for Supporting NRC Actions at Plant Re Reactor Operators ML20214Q0521986-11-24024 November 1986 Responds to & 861017 Inquiry Re Constituent Lm Brown Concerns About History of Problems at Plant. Factors Inhibiting Improved Performance & NRC Assessment of Plant Employee Training Discussed.W/O June 1986 Insp Rept NUREG-1068, Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls1986-08-26026 August 1986 Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls ML20202C9191986-07-0707 July 1986 Responds to Re Serious Mgt Deficiencies at Facility.Info Cited Based on Poor Performance Indicated in 860606 SALP Board Rept.Meeting W/Licensee Planned.Author Has Scheduled Addl Meeting W/Util Executive Officer ML20140H6701985-06-0303 June 1985 Forwards Press Release 85-78 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Unplanned Occupational Radiation Exposures & Failure to Control Contractor Work Forces ML20140H8941984-06-19019 June 1984 Forwards Press Release 84-75 Re NRC Proposed Fine Against Util for Five Alleged Violations of Tech Specs ML20215K4771976-11-0303 November 1976 Responds to 761012 Request for Info Re Fallout from 760926 Nuclear Explosion by Peoples Republic of China.On 761003, Util Informed Region I of Low Level Contamination Around Reactor Bldg.Samples Indicated Plant Not Source 1990-06-14
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209F2461999-07-15015 July 1999 Request Addl Info Re Relief Request CRR-01 Through CRR-11 for Plant,Units 2 & 3.RAI Undtd ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K2251999-06-11011 June 1999 Forwards Insp Repts 50-277/99-04 & 50-278/99-04 on 990405- 0517.One Severity Level IV Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G2051999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20207B8381999-05-24024 May 1999 Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified ML20207A0541999-05-17017 May 1999 Acks 990512 & 14 Telcons with Licensee Re Util Request That Rev 8 of NUREG-1021, OL Exam Stds for Power Reactors Be Followed Rather than Interim Rev 8 for Exams in Sept 1999. Request Acceptable ML20206K2231999-05-0606 May 1999 Informs That Author Authorized to Exercise Discretion & Not Issue NOV or Civil Penalty Re Violation Util Identified Involving Unit 2 Rod Block Monitoring Sys Being Inoperable for 29 of 185 Control Rods ML20206K1921999-05-0606 May 1999 Discusses 990503 Telcon Between J Williams & B Bierly Re Arrangements Made for Administration of Licensing Exam at Peach Bottom Facility During Week of 990913 ML20206A1511999-04-20020 April 1999 Forwards Request for Addl Info Re Util 980514 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-operated Valves. Response Requested within 90 Days of Ltr Receipt ML20206A2801999-04-20020 April 1999 Discusses Proposed Changes Submitted by PECO on 980416, 981116,990122 & 990211 to Plant Emergency Action Levels (Eals).Eals Incorporate Guidance in NUMARC/NESP-007,Rev 2. SE Supporting Proposed EALs Encl ML20205N1961999-04-0909 April 1999 Informs of NRC Planned Insp Effort Resulting from Peach Bottom Atomic Power Station Plant Performance Review Conducted for Period April 1998 to 990115.Historical Listing of Plant Issues & Insp Plans Through Jan 2000 Encl ML20205K7321999-04-0707 April 1999 Forwards Amends 227 & 230 to FOLs DPR-44 & DPR-56, Respectively.Amends Consist of Changes to TS SRs Re Secondary Containment Doors,In Response to 980204 Application,As Revised by ML20205J0531999-04-0101 April 1999 Ack Receipt of 990326 Notice of Enforcement Discretion Request & Documents Resolution.Notes That E3 EDG Returned to Operable Status on 990327,within 14 Day Completion Time Required by Ts.No Enforcement Discretion Necessary ML20205B9891999-03-25025 March 1999 Forwards Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.Violation Noted & Being Treated as non-cited Violation.Nrc Concluded That Staff Maintained Effective Influents Controls & Effective Security Program ML20203H8101999-02-12012 February 1999 Discusses Completion of Licensing Action for Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in BWR, ML20203H7751999-02-12012 February 1999 Discusses Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Peach Bottom Atomic Power Station ML20202J5251999-02-0101 February 1999 Forwards Insp Repts 50-277/98-11 & 50-278/98-11 on 981110- 990104 & Notice of Violation Re Failure to Complete Facility Licensed Operator Requalification Program ML20202J8081999-02-0101 February 1999 Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions ML20203A6111999-01-22022 January 1999 Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705 ML20198P1761998-12-30030 December 1998 Forwards from R Calvan Transmitting FEMA Rept for Spring 1998 Peach Bottom Atomic Power Station Ingestion Exposure Pathway Exercise.No Deficiencies Identified During Exercise Conducted on 980407-09,980506 & 980519-21 ML20198K5911998-12-24024 December 1998 Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls IR 05000277/19980081998-12-21021 December 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/98-08 & 50-278/98-08 Issued on 981028 ML20198D4071998-12-16016 December 1998 Forwards Emergency Preparedness Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Exercise Weaknesses,Safety Concerns or Violations of NRC Requirements Identified 1999-09-07
[Table view] |
Text
__
[
/ %,
g unirso states NUCLEAR REGULATORY COMMISSION h'N7 1 L j WASHINGTON, D. C. 20566
+
..... NOV 2 41988 The Honorable Robert S. Walker United States House of Representatives Washington, DC 20515
Dear Congressman Walker:
I am pleased'to respond to your October 29, 1986 letter to PPC Chaiman .
Lando Zech and your October 17, 1986 inquiry addressed to the NRC Office of l Congressional Affairs regarding a letter from one of your constituents, Mr. Lester M. Brown. These letters expressed your concern and the concerns of your constituent about the history of problems that have been identified at the ewacn u: :t = Atomic Power sta<:iod including the issues contained in an
- October 12, I M _ancaster Sunday News article. ,
I want to assure you that the NRC shares your con ~cerns and those of your constituent regarding the problems that have been identified at Peach Bottom and that we are detemined to see that these problems are resolved. NRC identification and assessment of the issues at Peach Bottom have resulted in our assigning high inspection and oversight priority to the plant. Most
- recently, the NRC has established a third resident inspector position at Peach Bottom to provide for increased direct inspection and observation of plant i . performance and operations. We are currently in the process of filling that position. Additionally, Peach Bottom will continue to receive high inspection priority including the assignment of site reviews by region-based specialist inspectors. Senior NPC management has and will continue to be involved with monitoring Peach Bottom performance through periodic. meetings with Philadelphia ,
Electric Company management.
i As the Lancaster Sunday News article indicates, Peach Bottom has been receiving '
- special attention from the NRC. As an example of our attention, a special NPC team inspection was conducted in June 1986. The team inspection concluded that the Peach Bottom plants were being operated safely and that the programs at Peach Bottom are fundamentally sound and basically acceptable. However, the inspection team identified certain underlying factors that tend to inhibit improved overall performance at Peach Bottom. These factors include a depend-ence on third parties to identify problems rather than self identification and a failure to implement aggressive followup and oversight by management of corrective action programs. A copy of the inspection report is included for your information. The Peach Bottom licensee, Philadelphia Electric Company, has responded positively to our inspection findings and is currently engaged in a comprehensive program to improve Peach Bottom performance. This program has been formally presented to the NRC and we will closely monitor the licensee's performance improvement program status and results.
8612040489 861124 PDR ADOCK 05000177 P PDR
In your October 29, 1986 letter you also asked for our assessment of employee training at Peach Bottom. Our current overall assessment is that training is satisfactory. The licensed _ operator training and requalification training programs are functioning well as evidenced by NRC exam perfomance. Improve-ments have been noted in nonlicensed operator, chemistry technician and maintenance related training. There are, however, areas for improvement in training as evidenced by licensee personnel errors. A copy of the riost recent NRC Systematic Assessment Licensee Performance Report at Peach Pottom which addresses licensee performance in training and other discipline / functional areas, is included for your information.
In conclusion, I believe that our efforts to date have resulted in the early identification of current problems at Peach Rottom. The NRC staff has been aggressive in its inspection and enforcement at Peach Bottom and in providing effective analyses of licensee performance through 'special team inspections and the Systematic Assessment of Licensee Performance. As indicated above, NRC will continue to closely monitor the licensee's operations and performance through additional resident inspectors located at the Peach Bottom site, through increased region-based specialist inspections, and through continuing manage-ment level reviews of status and progress of Peach Bottom's improvement programs.
I assure you that the NRC will continue to fulfill its responsibilities con-cerning the Peach Bottom plants and will not hesitate to take those actions
. required to ensure the public health and safety.
Sincerely, 7
Victor Stello, Jr, Executive Director for Operations
Enclosures:
As stated l
i e-DISTRIBUTION w/o attachment J. Roe T. Rehm J. Sniezek G. Cunningham J. Taylor C. Kammerer H. Denton T. Murley W. Kane S. Collins R. Gallo P. Eselgroth T. Johnson P. Lohaus D. Muller R. Bernero W. Kerr ED0 002247 ED0 002279 Secy 86-1128 Secy 86-1151 Docket No. 50-277/50-278 Public. Document Room Local Public Document Room ED0 Reading File Commonwealth of Pennsylvania 3 e ad *"'""# k biotwW" # gh o'" REVISED IN DEDR0GR 11/20/86 //
See attached for previous concurrences OFC :RI:DRP :RI:DRP :RI:DRP :RI:DRP :RI:DRA :RI:RA :EDO NAME :Eselgroth* :Gallo* : Collins * :WKane* :JAllan* :TEMurley* :VS ello
-____.___ -_______:___________-:_______-____:-_--_______-:_---_--_---_:_---__-__---:- d-------
DATE :11/ /86 :11/ /86 :11/ /86 :11/ /86 :11/ /86 :11/ /86 :11/9M86 l OFFICIAL RECORD COPY
% 's J
9
.x -
k '
'The Honorable Robert S. Walker United States House of Representatives
< Washington, DC 20515
Dear _ Congressman Walker:
I am pleased 29, 1986 letter to NRC Chairman Lando Zech and your\to respond j0ctober to inquiry 17, 1986 your October addressed to the .NRC Office of Congres-sional Affairs, regarding a letter from one of your constituents, Mr. Lester M.
Brown. These Ietters s
expressed your concern and the concerns of your constituent
, about the history of problems that have been identified at the Peach Bottom Atomic L Power Station in luding the issues contained in an October 12, 1986 Sunday News article.
4 I want to assure yo that the NRC shares.your concerns and those of your-constituent regardin the problems that have bee'n identified at Peach Bottom
, and that we are dete ned to see that these problems are resolved. NRC identification and asse sment of the issues pt Peach Bottom have resulted in our assigning high inspectio and oversight pri,ority to the plant. Most recently, the NRC has established a hird resident nspector position at Peach Bottom to provide for increased plan activity eval ation and is currently in the process of filling that position. ditionally4' Peach Bottom will continue to receive high inspection priority inc1 ding the/ assignment of site reviews by regional based specialist inspectors. enfor NRC management has and will continue to be involved with monitoring Peach tt . performance through periodic meetings with Philadelphia Electric Company ma ement.
As the Sunday news article indic t s, Peach Bottom has been receiving special attention from the NRC. As an /xam'ple of our attention, an NRC diagnostic team inspection was conducted in Ju e 1986. Although the review identified n.o evidence that the Peach Botto plantk were being operated unsafely, the team inspection report, which is ttached to this letter, does identify some areas where we have determined th t improvements are needed. The Peach Bottom licensee, Philadelphia Ele tric Compan'y, has responded positively to our '
inspection findings and i currently engaged in a comprehensive program to improve Peach Bottom per rmance. This program has been formally presented to the NRC and we intend t closely monitor performance improvement program status
- and results.
. Continued NRC vigilance will t'e accomplished, as indicated above, through an aggressive inspection program and continuirg management level reviews of the progress of the Peach Bottom improvement program. We will examine, in particular, the licensee's progress in bringing about significant improvement in those areas of weakness identified in the most recent Systematic Assessment of Licensee Performance. A copy of the most recent SALP is attached for your 1
l 1 ,. -- . . _ . . _ _ _ _ _ _
t ,
perusal. In your October 29, 1986 letter you also asked for our assessment of employee training at Peach Bottom. As documented in the attached SALP report, our current overall assessment is that training is satisfactory while areas for improvement in the training program have also been identified.
In conclusion, I believe that our efforts to date have resulted in the early identification of current problems at Peach Bottom. The NRC staff has been aggressive in relying on its inspection results and providing effective y analyses of these results through the Systematic Assessment of Licensee sg Performance to identify weaknesses to management and plant staff. I assure n 3 you that the NRC will continue to fulfill its responsibilities concerning the X Peach Bottom plants and will not hesitate to take those actions required to D ensure the public health and safety. (-QJ g P
Sincerely, q w '
N
, C kd Victor Stello, Jr.
Executive Director for Operations Attachmen : As stated /
l I g
\
x
\
r i
_ _ - . . -_______._m_ _ _ .
1, ..
DISTRIBUTION w/o attachment J. Roe T. Rehm
'J..Sniezek l
-G. Cunningham J.-Taylor C. Kammerer H. Denton T.' Murley-W. Kane S. Collins R. Gallo P. Eselgroth T. Johnson P. Lohaus '
D.-Muller R. Bernero W. Kerr '
~ED0 002247' EDO 002279
'Secy 86-1128 Secy 86-1151 Docket No.' 50- 77/50-278 Public Document oom Local Public Doc nt Room EDO Reading File Commonwealth of Pen ylvania l
\