Responds to Concerns Raised in CA Morella Based on 870414 Discussion Between NRC & State of MD Delegates Re Plant.Nrc Regulations Require That Security Programs Be Established.Related Info Encl
ML20235K356
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/10/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Morella C
HOUSE OF REP.
Shared Package
ML20235K358 List:
References
NUDOCS 8707160283
Download: ML20235K356 (4)


Text

  • * '

_$b 777 k7f JUL 10 667 The Honorable Constance A. Morella United States House of Representatives Washington, D.C. 20515

Dear Congresswoman Morella:

I am responding to the concerns about the_ Peach Bottom Atomic Power Station you raised in your May 19, 1987 letter based on discussions between the NRC staff and Maryland State Delegates on April 14, 1987 in Annapolis. The NRC shares your concerns regarding the problems at Peach Bottom and has an ongoing program in progress to fully examine these problems. This program will examine  ;

very closely the types of issues which you raised. l l

While it is too early new to provide you with the conclusions of our investigations, I would like to provide you with some information on the issues you raised. First, the NRC expects its licensees to establish, and implement through effective management, procedures that assure workers are capable of performing their assigned duties. These procedures are based upon published NRC policies. In particular, guidelines have been established on working hours as related to employee fatigue. Although these guidelines are not regulations, and do not cover outside employment, they do address shift scheduling and overtime and fitness for duty, in general. We will assess the effectiveness of the licensee's programs at Peach Bottom to determine whether appropriate controls were established to prevent operator inattentiveness due to fatigue induced by overscheduling.

l Secondly, NRC regulations require that security programs be established to monitor personnel access to a facility. Accordingly, an NRC inspector's presence on site would be known to some facility personnel. However, although an inspector may observe licensee established protocol and request entry into certain areas within the control room (to minimize congestion during certain conditions), inspectors can and do make entries without permission. We do not believe that access control prevents an inspector from making thorough l inspections.

j I hope these comments have been helpful in clarifying your concerns about the Peach Bottom facility. Let me assure you that NRC is examining issues like  !

i those you have raised and that action will be taken to correct the underlying problems to ensure public safety before the licensee resumes operation of i the Peach Bottom plants. j i

Sincerely, Ni%1malwd natu b'-

i Victor Stello, Jr.

ecutive Director for Operations

  • Concurred by phone 0#EJ 7kl @

RI:DRP RI:D S RI:DRP RJdDRP RI:DRA RI:RA GPA/SLITP t Linville/rbl Miller Gallo Kane Allan Russell Kammerer i 7/2/87* 7/2/87* /2/87* 7/2/87* 7/2/87* 7/2/87* 7/ /87

$RDD ( D A ' EDO GPA:CA GPA JS ,e7ek 1 1.y VStello JB i burne HDenton 7j)/87 7 7/ /87 7fi ) 87 7/ 8 / 87 Verbal concurrence 87071602e3 DR e7071o by J.Shea(IP)g6 g I ADOCK 05000277 PDR \

J .

DISTRIBUTION V. Stello J. Taylor T. Rehm T. Murley J. Murray W. Russell J. Allan W. Kane S. Collins R. Gallo J. Linville T. Johnson S. Varga B. Boger W. Butler R. Martin ED0 002905 Secy No.87-607 Docket No. 50-277/278 Public Document Room Local Public Document Room ED0 Reading File State of Maryland Commonwealth of Pennsylvania ,

l GPA:CA H. Denton C. Kamerer I

i I

l

pa RE%

f., UNITED STATES

[g ') - ( ' ,g NUCLEAR REGULATORY COMMISSION 5i ' .pp WASHINGTON, D. C. 20555

  • %Y, . **' )?\D'f:f,4f f.,k. -e L u u . J ,e/ u e EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: DUE: 06/15/87 EDO CONTROL: 002905 DOC DT: 05/19/87 I REP. CONSTANCE A. MORELLA FINAL REPLY: l TO:

CHAIRMAN ZECH l FOR SIONATURE OF: ** PRIORITY ** SECY NO: 87-607 l EXECUTIVE DIRECTOR DESC: ROUTING:

REQUEST INFO RE PEACH BOTTOM MURLEY MURRAY DATE: 06/02/37 STELLO ASSIONED TO: RI CONTACT: RUSSELL

%___.- TAYLOR REHM SPECIAL INSTRUCTIONS OR REMARKS:

~

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET i

PAPER NUMBER:

CRC-87-0607 LOGGING DATE: May 26 87 ACTION OFFICE: M ODO AUTHOR: C.A. Morella AFFILIATION: U.S. HOUSE OF REPRESENTATIVES LETTER DATE: May 19 87 FILE CODE: ID&R-5 Peach Bottom

SUBJECT:

Operational procedures at the Peach Bottom nuc power plant ACTION: Direct Reply DISTRIBUTION: OCA to Ack, Docket, RF SPECIAL HANDLING: None ,

NOTES:

4 DATE DUE: Jun 9 87 SIGNATURE: . DATE SIGNED:

AFFILIATION:

.