ML20236L339

From kanterella
Revision as of 09:47, 21 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-19 & 50-457/87-17 on 870521-0723.No Violations Noted
ML20236L339
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/05/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20236L343 List:
References
NUDOCS 8708100217
Download: ML20236L339 (4)


See also: IR 05000456/1987019

Text

1

.

l

AUG 5 3937

Docket No. 50-456

,

Docket No. 50-457

l

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767 l

l Chicago, IL 60690 l

l Gentlemen:

,

l This refers to the special safety inspection conducted by Mr. R. A. Westberg

l of this office on May 21 through July 23, 1987, of activities at the Braidwood

Station, Units 1 and 2, authorized by NRC Operating License No. NPF-72 and

Construction Permit No. CPPR-133 and to the discussion of our findings with

Mr. E. E. Fitzpatrick and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during t'te course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Sign:d by J. J. Ihrr.

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports  ;

No. 50-456/87019(DRS); and {

No. 50-457/87017(DRS)

See Attached Distribution {

!

RIII RIII RIII-

j

I

h

R I l

wh\v pn .V )

Westberg /lms Gardner Li t1 i on W il i

q\u\g ,M b1  % g' g ~/ fg I

B708100217 B70B05

PDR ADOCK 05000456  %\ /pb'

G PDR i

j

a

.

-

AUG 5 1987

Commonwealth Edison Company 2

Distribution  !

I

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

,

D. Shannon, Project Manager ]

W. Vahle, Construction {

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor '

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

! Richard Hubbard

l

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, 0GC ,

'

J. Stevens, NRR

The Honorable Ivan W. Smith, ASLB

The Honorable A. Dixon Callihan, ASLB i

The Honorable Richard F. Cole, ASLB l

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

_ __ _ - - _ - _ - - _ _ - _ _ _ _

b. , - . .2 . e .- m .....,o ,, . m. ~ >. ,s . .. . . . . s

UNITEo STATES

j# Hou

d. .

% NUCLEAR REGULATORY COMMIS310N

REGION lli

[

Ep

'

'f

S ,

799 ROOSEVELT RO AD

f

.....

AUG5 1987

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. R. A. Westberg

of this office on May 21 through July 23, 1987, of activities at the Braidwood

Station, Units 1 and 2, authorized by NRC Operating License No. NPF-72 and

Construction Permit No. CPPR-133 and to the discussion of our findings with

Mr. E. E. Fitzpatrick and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,, C  ;

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-456/87019(DRS); and

No. 50-457/87017(DRS)

See Attached Distribution

i

_________ -__ _ .

._._,m.-...~.. . ~ m... . .. .-- .. q

.

.

Commonwealth Edison Company 2 AUG 5 1987

Distribution  !

cc w/ enclosure:  !

D. L. Farrar, Director  !

of Nuclear Licensing l

D. Shannon, Project Manager l

W. Vahle, Construction 3

Superintendent ,

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor  !!

DCS/RSB(RIDS) l

Licensing Fee Management Branch l

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq. 4

Richard Hubbard l

J. W. McCaffrey, Chief, Public  ;

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC 1

-

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Ivan W. Smith, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB l

'

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP l

The Honorable Christine N. Kohl, ASLAP ,

1

- _ _ - _ - _ _ _ - _ _ - .