ML20151H411

From kanterella
Revision as of 10:54, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Rev to Emergency Plan Implementing Procedures,Including Procedures Bzp 100-1 Re Station Manager & Bzp 310-4 Re Assembly & Evacuation of Personnel
ML20151H411
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/25/1983
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20151H409 List:
References
6068N, NUDOCS 8305040074
Download: ML20151H411 (1)


Text

v Commonwe:lth Edison

@ One First Naticrat Plaza. Chicago, Illinois Address Reply to: Post Office Box 767 Chicago. Illinois 60690 February 25, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Generating Station Units 1 and 2 Emergency Plan Implementing Procedures NRC Docket Nos. 50-454 and 50-455

Dear Mr. Denton:

Pursuant to the requirements of 10 CFR 50, Appendix E, (

Commonwealth Edison Company hereby submits two copies of the detailed implementing procedures for the Byron Generating Station emergency plan. One copy is also being sent to the Region III Office of Inspection and Enforcement. These procedures are considered complete to the extent possible at this time.

Please address questions regarding this document to this office.

Very truly yours, zl2.sle3 l

phruT. R. Tramm l Nuclear Licensing Administrator 1m cc: J. G. Keppler, RIII l/l 1

6068N ffL l 8305040074 830422 PDR ADOCK 05000454 F PDR

.