ML20151W212

From kanterella
Revision as of 15:21, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/88-08 & 50-457/88-09 on 880214-0409 & Notice of Violation
ML20151W212
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/26/1988
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20151W217 List:
References
NUDOCS 8805030328
Download: ML20151W212 (2)


See also: IR 05000456/1988008

Text

.

m

~

'O d

-

, _ _,

APR 2 61988

,

Docket No. 50-456

Docket'No. 50-457

. Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

-This refers' to the routine safety inspection conducted by Messrs.

T. M. Tongue, T. E. Taylor, T. Tella, A. Dunlop, Jr., P. Kaufman, W. Grant,

R. Sutphin, and J. M. Ulie of this office from February 14 through April 9,

1988, of activities at the Braidwood Station, Units 1 and 2, authorized by

NRC Operating Licenses No. NPF-72 and No. NPF-75, and to the discussion of

our findings with Mr. K. Kofron and others of your staff at the conclusion

of the inspection.

-The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

. interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

gu\ <

hbbDO

O

O 56

DCD

- - - . - - . - - - - -

________________

.c

.

.

.

-

,-

. Commonwealth Edison Company 2 APR 28 Igg

We will gladly discuss any questions you have concerning this inspection.

'

l

Sincerely,

l

ORIGINAL SIGNED BY W. L FORNEY

William L. Forney, Chief

,

Reactor Projects Branch 1

Enclosures:

1. Notice of Violation

2. Inspection Report

No.50-456/88008(DRP);

No. 50-457/88009(DRP)

cc w/ enclosures:

T. J. Maiman, Vice President,

PWR Operations

H. Bliss, Nuclear ^ -

Licensing Manager

D..Shamblin, Project Manager

D. O'Brien, Station Services

Superintendent

W. Vahle, Construction Superintendent

R. E. Querio, Station Manager

P. L. Barnes, Regulatory

Assurance Su

DCD/DCB(RIDS)pervisor

Licensing Fee Management Branch

Resident Inspector, RIII Braidwood

Resident Inspector, RIII Byron

D. W. Cassel , Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance Division

E. Chan, 0GC

G. Berry, 0GC

Stephen P. Sands, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP @

pIII RIII RII - RIII YIII RII: RIII -

'

Sic 1 /jp Sut an kb p

RIII RIII RIII 4\L II 9 IT

e or

. _ _ _ _ _ _ - _ _ _ _ _ _