ML20133B423

From kanterella
Revision as of 22:21, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-456/85-29 on 850625-28,0702 & 09-11.No Violation Noted
ML20133B423
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 07/31/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133B427 List:
References
NUDOCS 8508060172
Download: ML20133B423 (2)


See also: IR 05000456/1985029

Text

-

. .

JUL 31 1985

Docket No. 50-456

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690 ,

Gentlemen:

This refers to the routina safety inspection conducted by Ms. J. Malloy of this

office on June 25-28, July 2 and July 9-11, 1985, of activities at Braidwood

Station authorized by NRC Construction Permit No. CPPR-132 and to the discussion

of our findings with Mr. C. Tomashek and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of pr,cedures and representative records, observations, and

interviews with personnel.

.No violations of NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure, will be placed in the NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

ORIGINAL SIGNED BY L. A. REYES

Luis A. Reyes, Chief

Operations Branch

Enclosure: Inspection Report

No.50-456/85029(DRS)

Distribution: See Attached

$h454

PDR /h/l 8

m

.

/ 1

,l .:}'l*

L

JUr 31 1985

Commonwealth Edison Company 2

L

.

cc w/ enclosure:

D. L. Farrar, Director

,

~o f Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

, -Superintendent

l. ~J. F. Gudac, Plant Manager

C. W._Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident' Inspector, RIII

t

Braidwood

Resident Inspector, RIII Byron

l: .Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. 'Cassel, Jr. , Esq.

J.: W. - McCaffrey, Chief, Pub'ic

Utilities Division

H. S.-Taylor, Quality Assurance

.

Division

E. Chan, ELD =

J. Stevens, NRR

_

.

p

-

.

E

jk 3h3D

RI

Malloy/lc Wawk' ins Li tle yes

7/29/85 4 o

e

3

-