Requests Review of Encl First Draft Tech Specs,Based on Util 850717 Submittal.Proposed Changes to Braidwood Draft Tech Specs Applicable to Byron Cannot Be Incorporated Until Byron Changes Approved.W/O Encl
ML20133G117
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/07/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
References
NUDOCS 8510150182
Download: ML20133G117 (3)


Text

_ _

4 Mr. Dennis L. Farrar OCT 0 71985 l

l t

Enclosure 3 is a list of typographical / editorial deficiencies identified during this review that are considered not to have technical merit. To be consistent with the staff's policy in not releasing Technical Specifications with known errors, Enclosure 3 items were corrected in the Braidwood first draft. Byron 's Technical Specifications must be amended to correct these known deficiencies.

Enclosure 4 is a list of apparent Byron and Braidwood Safety Evaluation Report deficiencies and proposed resolution submitted for your information and review.

Enclosure 5 is a copy of the first draft of the Braidwood Station, Units 1 and 2 Technical Specifications.

The above findings are not all inclusive since the review is still in progress.

Provide your response within 45 days of receipt of this letter. Please contact i the Braidwood Project Manager, J. A. Stevens at (301) 492-7144 for further information or clarification.

Sincerely, ORIGINAL SIGNED M '

B. J. Youngblood, Chief

[1l Licensing Branch No. 1 Division of Licensing

Enclosures:

As stated cc w/o enclosure:

See next page DymEEON: w/o encl.

gcketFie} d5tevens *w/ encl.

nnurun OELD Region III (3)

LPDR ACRS (16) ResidentInspector(1)

NSIC EJordan PRC System JPartlow LB#1 R/F BGrimes MRushbrook L01shan J

LB#1:DLh LB#1:DL LB#1:DL JStevens ; kab L01shan Ip BJYoungblood i

10/ / /ES 10/ 4 /85 10/q /85 85yoigo g [ Mpkg4 A

o UNITED STATES

! ~,j NUCLEAR REGULATORY COMMISSION g j WASHINGTON, D. C. 20555

/ OCT 0 71985 Docket Nos.: STt' E0-456

  • and STN 50-457 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

Subject:

Braidwood Station, Units 1 and 2 First Draft Technical Specifications The NRC has completed its initial review of the first draft of the Braidwood Station, Units 1 and 2 Technical Specifications. The first draft is based on Commonwealth Edison's July 17, 1985, submittal drafted from the approved Byron Technical Specifications to include changes that were site-specific in nature.

We request that you review this document and identify any statements which do not accurately reflect the Braidwood Station, Units 1 and ? FSAR, SER or the "as-built" plant.

We also request your review of the enclosed convaents generated during the staff's review of your July 17, 1985 submittal.

Enclosure 1 is a sunmary of your proposed changes and our resolution / changes

. incorporated in this first draft Technical Specification submittal. In accor-dance with the Commission's standardization policy, your proposed changes to the Braidwood draft Technicel Specifications that are also applicable to Byron Station can not be incorporated at this time. Upon acceptance by the staff of the proposed changes for Byron Station, Braidwood's Technical Specifications will then be revised accordingly.

Enclosure 2 is a list of apparent deficiencies identified during the staff's review of Braidwoed's draft Technical Specifications. Proposed resolutions are subnitted for your information and resolution.

/

a Mr. Dennis L. Farrar Braidwood Station Commonwealth Edison Company Units 1 and 2 cc:

Mr. William Kortier Ms. Lorraine Creek Atomic Power Distribution Route 1, Box 182 Westinghouse Electric Corporation Manteno, Illinois 60950 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Jane M. Whicher, Esq.

109 N. Dearborn Street Joseph Gallo, Esq. Chicago, Illinois 60602 Isham, Lincoln & Beale 1120 Connecticut Ave., N. W. Rebecca J. Lauer, Esq.

Suite 840 Isham, Lincoln & Beale Washington, D. C. 20036 Three First National Plaza Suite 5200 C. Allen Bock, Esq. Chicago, Illinois 60602 Post Offices Box 342 Urbana, Illinois 61801 Erie Jones, Director Illinois Emergency Services Thomas J. Gordon, Esq. and Disaster Agency Waaler, Evans & Gordon 110 East Adams 2503 S. Neil Springfield, Illinois 62705 Champaign, Illinois 61820 Ms. Bridget Little Rorem Appleseed Coordinator i 117 North Linden Street

] Essex Illinois 60935 Mr. Edward R. Crass Nuclear Safeguards and

~

Licensing Division Sargent-a Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 U. S. Nuclear Regulatory Commission Resident Inspectors Office RR#1, Box 79

Braceville, Illinois 60407 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

1