ML20141F106

From kanterella
Revision as of 18:41, 26 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-454/85-55 & 50-455/85-45 on 851202-06 & Notice of Violation
ML20141F106
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/27/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20141F111 List:
References
NUDOCS 8601080624
Download: ML20141F106 (2)


See also: IR 05000454/1985055

Text

-

O O

DEC 2 71985

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. M. Ring and

W. Forney and Ms. J. Malloy of this office on December 2-6, 1985, of activities

at Byron Station, Units 1 and 2 authorized by NRC Operating License No. NPF-37

and NRC Construction Permit No. CPPR-131 and to the discussion of our findings

with Mr. R. Querio and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

b

Carl J. Pape[riello, Director

Division of Reactor Safety

g 1 ] g g g PDR 54

G

RIII RIII RIII RI RIII Rill A

Q?>tLAfb "p.iQlg) mX, i 11 ,/rfg {-Q #

Ring /ld Forney Malloy Wari ek Harrison PT er 110 8

( ,

12/ )/85 afst/W jj 77 ( (

-

. ,

.-. .

i.

'

Commonwealth Edison Company 2

-

DEC 2 71985

u -

\v -I

C

,'d Enclosures:

1. Notice of Violation

2. Inspection Report

No.50-454/85055(DRS)

Li No. 30-455/85045(DRS).

<e

'

cc.w/edclosures:

j(J D. L. Farrar, Director.

^-

t of Nuclear Licensing

V. I. Schlosser, Project Manager

, Gunner Sorensen, Site Project

-

f" Superintendent

.2 R. E.- Querto, Plant Manage'r

LOCS/RSB (RIDS) (

Licensing Fee Management B,ran'ch ' '

Resident Inspector, RIII. Byron

Resid6nt Inspector, RIII

Brsidwood

Phyllis Dunton, Attorney

General's Office, Environmental

3 Control Division

.Aa ;D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD'-

,

L'. 01shan, NRR LPM

N. S. Taylor, Quality Assurance

Division

'l ?jl

'

'!!i

- si

s

S

i

$

u ,

)

t

.g

-

'

o=_ *: