ML20147D571

From kanterella
Revision as of 05:36, 25 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-382/87-31 on 871216-880131 & Notice of Violation
ML20147D571
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20147D572 List:
References
NUDOCS 8803040054
Download: ML20147D571 (3)


See also: IR 05000382/1987031

Text

,. .

t

t. 8

In Reply Refer To:

Docket: 50-382/87-31

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. W. F. Smith and T. R. Staker

of this office during the period December 16, 1987, through January 31, 1988,

of activities authorized by NRC Operating License NPF-38 for the Waterford

Steam Electric Station, Unit 3, and to the discussion of our findings with

Mr. R. P. Barkhurst and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included onsite followup of events,

monthly maintenance observation, operational safety verification, monthly

surveillance observation, followup of previously identified items, licensee

event report followup, plant status, and 10 CFR 21 reports. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 6 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'

,f &

1

TStkker/;z

S -

A ,

0: )

11 Ond LJCallan

2/ 1788 1 88 /q/88 2 /26/88

s\

piroiB8M8888lip

Q

/Fo/

.__

-

, .

Louisiana Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ea,ta.1 Sfgned By

A. 3. Deach

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-382/87-31

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: A. F. Burski, Acting Manager

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite

Licensing Coordinator

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P.O. Box 6100

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV

  • Section Chief (DRP/A) *DRP

RPSB-DRSS * MIS System

  • ProjectEngineer,DRP/A *RSTS Operator

L

_ _ _ _ _ _ _ __ - .__

. .

Louisiana Power &' Light Company -3-

  • R Hall *D. Wigginton, NRR Project
  • TSS Manager
  • DRS -
  • Lisa Shea, RM/ALF

'

  • RIV File
  • w/766

l

,

l