ML20247K575
| ML20247K575 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/27/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20247K579 | List: |
| References | |
| NUDOCS 8908010003 | |
| Download: ML20247K575 (2) | |
See also: IR 05000382/1989020
Text
,
-.
--
--
p
h
.g
&/ T 3 6
p
,:
-
,
(
A 27 g
-
,
In Reply' Refer To:
Docket: 50-382/89-20
,
k
'
'
Louisiana Power & Light Company?
L
ATTN:
'J. G. Dewease Senior Vice President
Nuclear' Operations
'317 Baronne. Street
y
New Orleans,-Louisiana 70160.
.
Gentlemen: .
,
This refers to the inspection conducted by Mri I. Barnes of this office on
-
F
July 5,1989, of ' activities authorized by NRC Operating License NPF-38 for the
L
Waterford Steam Electric Station, Unit 3, and to the discussion of our findings
with Mr. J.'R. McGaha and other members of your staf.f at the conclusion of the
l inspection.:
,
The' area examined during the: inspection was the service failure of the shaft'in
Chilled Water Pump B.
Within;this area, the inspection consisted of selective
examination of. procedures and representative records, interviews with personnel,,
"e
~and observations by the NRC inspector. The inspection findings are documented-
in the enclosed-inspection. report.
'
Within the scope of the inspection, no violations.or' deviations'were
,
sidentified.-
,
" - One unresolved item is! identified in paragraph 2 of the enclosed inspection
report pertaining to review of the findings of the laboratory failure analysis
- and'your planned response actions.
In that the inspection has indicated a. potential concern regarding the
'
condition of the shafts in the remaining chilled water pumps,'we. request that
you advise this office upon your receipt of the laboratory findings.
Should you have'any ouestions concerning this inspection, we'will be pleased to
discuss them with you.
Sincerely,
&w.%Lh
James L. Milhoan, Director
Division of Reacter Projects
Enclosure:
Appendix - NRC Inspection Report
.50-382/89-20
.cc w/ encl'osure:
(seenqxtpage)
RIV:C:MQPS_q3
AD $ RS (hY.
D:DRP
d
'
vvJLMpcan
i
')tVJaupong /gb/89
(g 1// /89
pf
IBarnes/cjg
7/2&/89
I \\
8908010003 890727
)
ADOCK 05003382
O
FDC
,
--
.
. *
-
v
r
>
o
.
.c
Louisiana Power & Light Company'
'
l
i
,
Louisiana!Pcwer:& Light Company
ATTN:
R. P. Barkhurst, Vice President
l Nuclear Operations
P.O. Box B
Kill:,.ia , Louisiana .'70066 -
Louisiana Power A Light Company
-ATTN:
J. R. McGaha, Jr., Plant Manager
P.O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
~
ATTN:
R. F. Burski, Manager, Nuclear
Safety & Regulatory Affairs
- 317 Baronne Street
P.O. Box ~~60340
New Orleans, Louisiana. 70160
-Louisiana. Power.& Light Company.
ATTN:
L. W.' Laughlin, Site
j
'
Licensing Support Supervisor
P.O. Box B
K111ona, Louisiana 70066
Louisiana Power & Light Company
<
1
' ATTN:
.G. M. Davis, Manager, Events
Analysis Reporting & Response
P.O. Box B-
Killona Louisiana 70066
Middle South Services
ATTN: 'Mr. R. T. Lally
P.O. Box 61000
i
New Orleans, Louisiana 70161
Louisiana Radiation Control Program Director
!
bec to DMB (IE01)
>
bec' distrib. by RIV:
- RRI
- R. D. Martin, RA
- Section Chief (DRP/A)
- DRP
i
- RPB-DRSS.
- MIS System
,
-
5
- Project Erdeer (DRP/A)
- RSTS Operator
- PIV File
- DRS
i
- D. Wigginton, NRK Project Manager (MS:
13-D-18)
Lisa Shea,.RH/ALF
'
- I. Barnes
- w/766
.
.