Forwards IE Inspec Repts#50-456/78-11 & #50-457/78-11 on 780927-29 During Which No Items of Noncompliance Were Noted
ML20148U561
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/03/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML20148U565 List:
References
NUDOCS 7812070105
Download: ML20148U561 (2)


See also: IR 05000456/1978011

Text

T

  1. " "'%, UNITED STATES

.

p '4 NUCLEAR REGULATORY COMMISSION

k \D l 0 REGION 111

E ~E 799 ROOSEVELT ROAD

% , g,g' / oLEN ELLYN, ILLINol5 60137

.....

NOV 3 1978

Docket No. 50-456

l

l

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Jones and

P. A. Barrett of this office on September 27-29, 1978, of act1vities

at Braidwood Nuclear Generating Station, Units 1 and 2, authorized

by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to

the discussion of our findings with Mr. R. Cosaro and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures 1

and representative records, observations, and interviews with i

personnel. I

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

'

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows. If this report i

contains information that you or your contractors believe to be l

proprietary, you must apply in writing to this office, within

.

l

twenty days of your receipt of this letter, to withhold such  !

information from public disclosure. The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an  !

enclosure to the application.

l

i

.m l

l

1

-7812070105 @

_.

. - . _ . . -- _- . . _ _ ..

N

'

.

,

Commonwealth Edison -2- ---

Company NOV 3 1978.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

lo

%+j

R. F. Heishman, Ch'.ef

Reactor Construction and  ;

Engineering Support Branch

Enclosure: IE Inspection

Report No. 50-456/78-11

and No. 50-457/78-11

1

cc w/ enc 1:

Mr. R. Cosaro, Project )

1

Superintendent '

Central Files

j

Reproduction Unit NRC 20b i

PDR I

Local PDR

NSIC 1

TIC

Mr. Dean Hansell, Office

of Assistant Attorney

General

I

1