ML20135H744

From kanterella
Revision as of 17:01, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-445/85-08 on 850501-0731.No Violations Noted
ML20135H744
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/18/1985
From: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Spence M
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20135H745 List:
References
NUDOCS 8509240189
Download: ML20135H744 (2)


See also: IR 05000445/1985008

Text

, . . _

st

~

-

g

-

j, In'ReplyReferTo: SEP 181985

  • Docket: 50-445/85-08 -

, 't.

k-

?~

Texas Utilities Electric Company

ATTN: M, D Spence, President TUGC0

Skyway Tower >

'400 North Olive Street

4

Lock Box 81

Dallas, Texas 75201

,

Gentlemen:

,

1 iThis refers to the inspection conducted by' Messrs. D. L. Kelley and W. F. Smith

of this office during the period May 1 through July 31, 1985, of activities i

1

authorized by NRC Construction Permit CPPR-126 for the Comanche Peak Facility,

'

5 Unit 1, and to the discussion of our findings with Messrs. W. G. Counsil, J. C.

Kuykendall and other members of your staff at the conclusion of the inspection.

4

Areas"'6xanined during the inspection included: (1) verification of correction

of human erigi'neering deficiencies; (2) applicant actions on previous inspection

findings; (3) plant to'urs, and (4) plant status. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the' inspectors. These

findings are documented in the enclosed-inspection report.

. Within the sc# ope of the inspection, no violations or deviations were

identified. ,

4 I Should you have any questions concerning this inspection, we will be pleased to

'

( discuss them with you.

, N Sincer8hhal Signed By:

(

_

,

Richard P. Denise

.  ;'

'

<N R. P. Denise, Director

'

,

'

, Division ~of Reactor

Safety and Projects

<

Enclosure: .

-

Appendix - NRC Inspection Report

50-445/85-08

f cc w/ enclosure: (see next page)

g RIV:SRIY RRI k CPTG 7 DRSP TRT

> JLKelly WFSmith TFWesterman RPDenise VSNoonan p].

e * t/p/85 , 7 /q/85 V//7 /85 ( / 85 / 5

,

-

a

.

y y i t

' '

r3509240189 850919

,

PDR ADOCK 05000445 '

PM

,

<

G

'

'

, , ,

' )_ Y

- -

-

.

4

Utilities Electric Company -2-

cc w/ enclosure:

- Texas Utilities Electric Company

ATTN: J. W. Beck, Vice President

Licensing, QA and Fuel Management

Skyway Tower

'

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Texas Utilities Electric Company

ATTN: W. G. Counsil, Executive

Vice President, Nuclear ' .

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas,-Texas 75201

bec to DMB (1E01)

bec distrib. by RIV: .-

  • RPB_ * MIS System
  • RSB *RSTS Operator
  • RRI-OPS -
  • EP&RPB
  • RRI-CONST R. Denise, D/DRSP

V. Noonan, NRR R.. Martin, RA

S. Treby . ELD C. Wisner,'PA0

Juanita Ellis, Pres. - CASE *D. Weiss, LFMBB (AR-2015)

Renea Hicks, A/ Atty. General,- , *RIV File

EP Divs. - TX

T. F.. Westerman, Chief, CPSES

Task Group >

  • w/766

_

$

f