Text

t

)TXU

\\v#

TXU Elechk C. Lance Terry Comanche Peak Senior Vice President & Principal Nuclear Officer Steam Electrk Station P.O. Box 1002 Gen Rose TX.76041

. Tel:254 897 8920

- Fax:254 8976652 lt?rry1@txu.com -

Log # TXX-99229 File # 10010

' Ref. # GL-98-01 October 1,1999 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COM.ANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 FINAL RESPONSE TO GENERIC LETTER (GL) 98-01, SUPPLEMENT 1, " Year 2000 Readiness of Comonter Systems at Nuclear Power Plants" REF:

1) TU Electric Letter, Logged TXX-98188, from C.L. Teny to USNRC dated August 5,1998
2) TU Electric Letter, logged TXX-99160, from C.L. Terry to USNRC dated June 30,1999 Gentlemen:

The purpose of this letter is to provide the final response to the Nuclear Regulatory Commission's request for information regarding Year 2000 readiness at nuclear power plants. Generic Letter 98-01 requires two responses. The first response was required by August 10,1998, and was submitted via Reference 1.

On January 14,1999, the Nuclear Regulatory Commission issued Supplement 1 to Generic Letter 98-01 to modify the request for information in the original generic letter.

g0082 I

9910050269 991001 I

]

)

PDR ADOCK 05000445:

/\\

P PDR

TXU

?-

i TXX-99229

" ~

Page 2 of 3 The Supplement stated:

l

-"In responding to this supplement to GL 98-01, the addressee should confirm [ Year 2000].Y2K readiness of the facility with regard to those systems within the scope of the license and NRC regulations, and those systems required for continued operation of the facility after January 1,2000. For those systems which are not Y2K ready as of July 1,1999, the addressee should provide a status and completion schedule for achieving readiness by the year 2000."

In response,i Comanche Peak Steam Electric Station (CPSES) voluntarily reported facility readiness as outlined in Supplement 1 to Generic Letter 98-01 via

(

Reference 2, describing facility Y2K status as of July 1,1999.

Enclosed, is 'the Year 2000 Readiness Disclosure for CPSES denoting the final status of facility Y2K readiness. This disclosure is submitted under the guidelines of the

" Year 2000 Information and Readiness Disclosure Act"(Public Law 105-271).

Based upon the implementation of CPSES's Y2K Readiness Plan and Contingency l

. Plan, and completion of remediation of the systems / components noted herein, the facility is declared "Y2K Ready".

j No negative impact on facility nuclear safety, commitment implementation, plant l

operation, schedule or the facility's ability to meet licensing and/or regulatory.

l requirements was identified. Further, contingency plans have been developed to L

mitigate the impact of Y2K-induced events at key rollover dates.

l-This communication does not contain new licensing basis commitments regarding CPSES Units 1 and 2.

t-

()TXU t-j

(.

TXX-99229 Page 3 of 3 l,

If you have any further inquiries, please contact Mr. Jay Amin, Y2K Project Manager

. at 254-897-6469 -

9 Sincere O

C. L. Terry NSH/gpj Attachment Enclosure c-E. W. Merschoff, Region IV J. I. Tapia, Region IV -

D. H. Jaffe, NRR Resident Inspectors, CPSES Regional Administrator,NEI t

?-

l l

7 o

\\:

, to TXX-99229 Page 1 of 1 I

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION -

4 In the Matter of'

)

-)

TXU Electric

)

Docket Nos. 50-445

-)

50-446 (Comanche Peak Steam Electric

)

Station, Unit 1 & 2)

)

AFFIDAVIT C. L. Terry being duly sworn, hereby deposes and says that he is Vice President,

. Nuclear Engineering and Support, Officer of TXU Electric, the licensee herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this response to Generic Letter 98-01, Supplement 1; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best ofhis

~ knowledge,information and belief.

C. L. Terry SeniorVice ent &

Principal Nuclear. Officer STATE OF TEXAS -

-)

)

COUNTY OF xnul/ )

Subscribed and swom to before me, on this A'A day ofAtuJu 1999,

/

AMw&w,2W

/

Notary [ublic SUSAN C. GRAVATT NOTARY PUBIJC 4

STATE OF TEXAS

%'.kCd My Commisske E$res 3-23 2001 j.

wsm-ww.--ww%;

i i

u..

f d

[

l.

L Enclosure to TXX-99229 i

Page1 of2 l

' TXU Electric's Response to Generic Letter 98-01, Supplement 1:

This disclosure addresses the final Y2K readiness status of the facility with regard to those systems within the scope of the license, NRC regulations, and other systems required for continued operation of the facility after January 1,2000. A facility that is "Y2K Ready" has followed a prescribed program to identify and resolve Y2K issues so the facility can operate reliably while meeting commitments.

TXU Electric has conducted a Y2K readiness program similar to that outlined in Nuclear Utility Year 2000 Readiness. NEI/NUSMG 97-07. The program epplies to j

software, hardware and firmware whose failure due to a Y2K problem would prevent the performance of the safety function of a structure, system or component and the continued operation of the nuclear facility well beyond December 31,1999. The program provided for risk management efforts and development of contingency plans i

for key rollover dates.

The.Y2K readiness program has been completed through the detailed assessment, remediation and contingency phases for those systems required for operation of the j

CPSES facility. The following open remediation items are now considered closed and i

the facility is declared Year 2000 Ready.

- Unit 1 - Condensate Polishing Programmable Logic Controller System This non-safety related Year 2000 modification has been implemented successfully during the Unit 1 Refueling outage, and as such the system has been declared Year 2000 compliant as of September 30,1999. This system is necessary for secondary

- plant chemistry control.

Common Facility - Plant Simulator Rehost Proicct This project entailed complete rehost of the CPSES Plant simulator. This item does not affect plant operations or plant safety. Existing processes are already in place to conduct operator training in the event the simulator is not available for any reason, including potential Year 2000 induced failures or should the remediation strategy fail.

This project was scheduled to be completed by October 30,1999.

l

r1 Enclosure to TXX-99229 Page 2 of 2 During the remediation phase, it was decided that due to vendor delays beyond TXU control, and the risk of not completing the rehost project in a timely manner, an alternate remediation plan was implemented in parallel. The alternate remediation plan entailed backdating of the plant simulator, verifying proper operation, and operating the simulator in dates earlier than the Year 2000 to avoid encountering Year 2000 issues. This alternate remediation has been implemented and the plant simulator has becit declared Year 2000 Ready as of September 17,1999.