Grants Temporary Waiver of Compliance from Tech Specs 3.3.2 & 3.6.2.1 Re Containment Spray Sys in Order to Repair & Test Containment Pressure Transmitter 1-PT-0934 W/Unit in Hot Standby
ML20056A044
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/25/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20056A045 List:
References
NUDOCS 9008030127
Download: ML20056A044 (3)


Text

W&  :;-

L # .

JUL 2 51990 f '.

In Reply Refer To:

-Docket: 50-445 TV Electric ATTN: W. J. Cahill, Jr., Executive

'l Vice President, Nuclear i Skyway Tower i 400 North Olive L.B. 81 Dallas, Texas 75201 Gentlemen:'

This' acknowledges the granting of a temporary waiver of compliance to Comanche Peak Steam Electric Station, Unit 1 as requested in your letter to our office dated July 24,1990(TXX90263). This letter provides the basis .for your request for a temporary waiver of compliance from the provisions of Technical Specifications (TS)3.3.2[ Table 3.3-2,ActionStatement17-(containment pressure only)] and 3.6.2.1 for the containment spray system in order to rerair i and test containment pressure Transmitter 1-PT-0934 with Unit 1 in hot sta'.dby. j We understand that the actual repair and testing of 1-PT-0934 is not exrected l to exceed 7 days..and that the actual total time that containment spra.s will 1

. be inoperable is not expected to exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Therefore, this temrorary j waiver of compliance will be effective for a period of 7 days, and will become i

, ' effective when: Unit.I' is placed in hot standby following the turbine -j trip / reactor trip: startup test from 100 percent power. During this 7-day- l period, the total integrated time that you are authorized to operate;in

, accordance with this waiver shall not exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. {

1The duration of this temporary waiver of compliance was discussed with members -!

of.your staff during a teleconference that was conducted with representatives i of this office ~and the Office.of Nuclear Reactor Regulation on July 25,'1990.. j If, during the repair of 1-PT-0934, it becomes apparent that- the integrated  !

period of operation under this waiver is likely toLexceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />,:you will i

.need to contact this office prior to exceeding the total integrated period.of  !

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> so that a reconsideration of the basis for the temporary waiver of ..

compliance'can be conducted. [

Sincerely, l iy*9 - Original Signed By. >

Thomas P,Gwynn j Samuel J. Collins, Director l Division of Reactor Projects i

L

Enclosure:

' TV Electric Letter TXX-90263  !

l cc w/o

Enclosure:

(see next page) 4 /V b

.RIV:PE':PSB C:PSB R D RP ATHowell:bh DDCham BBoger WSJQqllins 7/f6/90 7/.:6/90 7/ r/90 , d 7/c4/90 h' t, . /

9008030127 900725 gDN ADOCK osoorg45j

,( --

ki:

f q'

.Q 9,

'M!(

> ' 'TU Electric; l Q .

" TU Electric '

" ATTN: Roger D.: Walker, Manager, '

l P-Nuclear Licensing. "

-Skyway Tower,

? '400 North Olive Street, L.B. 81 L  ; Dallas, Texas 75201' LJuanita Ellis P

President - CASE 14261 South Polk Street i

. Dallas.-Texas :75224-l jGDS Associates. Inc.

JSuite 720 1850 Parkway Place.-

.Marietta, Georgia 30067-8237 ~I

'. Billie Pirner Garde. Esq.

.,. Robinson' Robinson. et. al.

, i 103 East College Avenue 1Appleton, Wisconsin 54911 q TU Electric Bethesda Licensing 3 Metro Center,' Suite 610 .

'Bethesda, Maryland 20814 1 Heron,' Burchette, Ruckert, & Rothwell j

. ATTN:- William A. Burchette, Esq. j Counselt for. Tex-La Electric Cooperative of. Texas j

> 1025 Thomas' Jefferson St., N.W. ~

F- Washington, D.C. -20007  :

1 F E MF. 0ttney . '

,)

^ :P.0., Box 1777 ,

~

, Glen; Rose, Texas 76043 y

JNewman'& Holtzinger, P.C.

ATTN: 1 Jack R. Newman, Esq.  ;

L1615 L. Street, N.W.

l Suite'1000.  ;

1 Washington, D.C..-20036  ;

' Texas Department.of Labor & Standards ATTN: G. R. Bynog, Program Manager /

..,. 3 -Chief Inspector t Boiler Division P.O. Box'121.57 Capitol Station  !

Austin, Texas' 78711-

', 't ,

i

?

.f,o <

s' ,. ;

@y. '

Oc , .

] ;;. ? *

~[, , ..

n

.TU Electric i Honorable George' Crump p". < County Judge Glen-Rose,. Texas fe043 Texas Radiation Control- Program Director

  1. " 1100 West 49th Street N e Austin, Texas 78756
. f- lbccl;to1DMB7(IE51)?'7,J bec distrib..by RIV w/

Enclosure:

R. D. Martin . . Resident' Inspector (2) 0 .DRP' ,

DRS

~SectionChief(DRP/B) RIV' Files DRSS-FRPS Lisa Shea, RM/ALF T. Murley, NRR (MS: 12D1) B. Boger, NRR (MS:- 14A2)

J.;Lieberman,OE(MS: 7H5). C. Grimes, NRR (MS: 13H15) 3 M.~ Fields,NRR-(MS: 13H15) J. Wilson, NRR (MS: 13H15) ~I A. Mendiola, NRR (MS;14A2) . j l

.1 u

,' +

i

?i

__________i__z. _ _ _ _