Grants Temporary Waiver of Compliance from Tech Specs 3.3.2 & 3.6.2.1 Re Containment Spray Sys in Order to Repair & Test Containment Pressure Transmitter 1-PT-0934 W/Unit in Hot Standby
ML20056A044
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/25/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20056A045 List:
References
NUDOCS 9008030127
Download: ML20056A044 (3)


Text

W L

JUL 2 51990 f '.

In Reply Refer To:

-Docket:

50-445 TV Electric

'l ATTN:

W. J. Cahill, Jr., Executive Vice President, Nuclear i

Skyway Tower i

400 North Olive L.B. 81 Dallas, Texas 75201 Gentlemen:'

This' acknowledges the granting of a temporary waiver of compliance to Comanche Peak Steam Electric Station, Unit 1 as requested in your letter to our office dated July 24,1990(TXX90263). This letter provides the basis.for your request for a temporary waiver of compliance from the provisions of Technical Specifications (TS)3.3.2[ Table 3.3-2,ActionStatement17-(containment pressure only)] and 3.6.2.1 for the containment spray system in order to rerair i

and test containment pressure Transmitter 1-PT-0934 with Unit 1 in hot sta'.dby.

j We understand that the actual repair and testing of 1-PT-0934 is not exrected l

to exceed 7 days..and that the actual total time that containment spra.s will 1

. be inoperable is not expected to exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Therefore, this temrorary j

waiver of compliance will be effective for a period of 7 days, and will become i

' effective when: Unit.I' is placed in hot standby following the turbine

-j trip / reactor trip: startup test from 100 percent power.

During this 7-day-l period, the total integrated time that you are authorized to operate;in

, accordance with this waiver shall not exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

{

1The duration of this temporary waiver of compliance was discussed with members of.your staff during a teleconference that was conducted with representatives i

of this office ~and the Office.of Nuclear Reactor Regulation on July 25,'1990..

j If, during the repair of 1-PT-0934, it becomes apparent that-the integrated

period of operation under this waiver is likely toLexceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />,:you will i

.need to contact this office prior to exceeding the total integrated period.of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> so that a reconsideration of the basis for the temporary waiver of compliance'can be conducted.

[

Sincerely, l

iy*9 -

Original Signed By.

Thomas P,Gwynn j

Samuel J. Collins, Director l

Division of Reactor Projects i

L

Enclosure:

' TV Electric Letter TXX-90263 l

b cc w/o

Enclosure:

(see next page) 4

/V

.RIV:PE':PSB C:PSB R

D RP ATHowell:bh DDCham BBoger WSJQqllins 7/f6/90 7/.:6/90 7/ r/90,

d 7/c4/90 9008030127 900725

/

gDN ADOCK osoorg45 h' t,.

j

,(

ki:f q'

.Q 9,

'M!(

> ' 'TU Electric; Q

l

" TU Electric

" ATTN:

Roger D.: Walker, Manager, l

P-Nuclear Licensing.

-Skyway Tower,

?

'400 North Olive Street, L.B. 81 L

Dallas, Texas 75201' LJuanita Ellis P
President - CASE 14261 South Polk Street i

. Dallas.-Texas :75224-l jGDS Associates. Inc.

JSuite 720 1850 Parkway Place.-

.Marietta, Georgia 30067-8237

~I

'. Billie Pirner Garde. Esq.

.,. Robinson' Robinson. et. al.

i 103 East College Avenue 1Appleton, Wisconsin 54911 q

TU Electric Bethesda Licensing 3 Metro Center,' Suite 610

'Bethesda, Maryland 20814 1

Heron,' Burchette, Ruckert, & Rothwell j

ATTN:- William A. Burchette, Esq.

j Counselt for. Tex-La Electric Cooperative of. Texas j

1025 Thomas' Jefferson St., N.W.

~

F-Washington, D.C. -20007 1

F E MF. 0ttney.

,)

^

P.0., Box 1777

~

, Glen; Rose, Texas 76043 y

JNewman'& Holtzinger, P.C.

ATTN: 1 Jack R. Newman, Esq.

l L1615 L. Street, N.W.

Suite'1000.

1 Washington, D.C..-20036

' Texas Department.of Labor & Standards ATTN:

G. R. Bynog, Program Manager /

3

-Chief Inspector t Boiler Division P.O. Box'121.57 Capitol Station Austin, Texas' 78711-

't i

?

.f,o s'

@y.

Oc,

] ;;. ?

~[,,

n

.TU Electric i Honorable George' Crump p". <

County Judge Glen-Rose,. Texas fe043 Texas Radiation Control-Program Director 1100 West 49th Street N

e Austin, Texas 78756

. f-lbccl;to1DMB7(IE51)?'7,J bec distrib..by RIV w/

Enclosure:

R. D. Martin.

. Resident' Inspector (2) 0

.DRP' DRS

~SectionChief(DRP/B)

RIV' Files DRSS-FRPS Lisa Shea, RM/ALF T. Murley, NRR (MS: 12D1)

B. Boger, NRR (MS:- 14A2)

J.;Lieberman,OE(MS: 7H5).

C. Grimes, NRR (MS:

13H15) 3 M.~ Fields,NRR-(MS:

13H15)

J. Wilson, NRR (MS:

13H15)

~I A. Mendiola, NRR (MS;14A2).

j l

.1 u

+

i

?i i

z.