W L
JUL 2 51990 f '.
In Reply Refer To:
-Docket:
50-445 TV Electric
'l ATTN:
W. J. Cahill, Jr., Executive Vice President, Nuclear i
Skyway Tower i
400 North Olive L.B. 81 Dallas, Texas 75201 Gentlemen:'
This' acknowledges the granting of a temporary waiver of compliance to Comanche Peak Steam Electric Station, Unit 1 as requested in your letter to our office dated July 24,1990(TXX90263). This letter provides the basis.for your request for a temporary waiver of compliance from the provisions of Technical Specifications (TS)3.3.2[ Table 3.3-2,ActionStatement17-(containment pressure only)] and 3.6.2.1 for the containment spray system in order to rerair i
and test containment pressure Transmitter 1-PT-0934 with Unit 1 in hot sta'.dby.
j We understand that the actual repair and testing of 1-PT-0934 is not exrected l
to exceed 7 days..and that the actual total time that containment spra.s will 1
. be inoperable is not expected to exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Therefore, this temrorary j
waiver of compliance will be effective for a period of 7 days, and will become i
' effective when: Unit.I' is placed in hot standby following the turbine
-j trip / reactor trip: startup test from 100 percent power.
During this 7-day-l period, the total integrated time that you are authorized to operate;in
, accordance with this waiver shall not exceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
{
1The duration of this temporary waiver of compliance was discussed with members of.your staff during a teleconference that was conducted with representatives i
of this office ~and the Office.of Nuclear Reactor Regulation on July 25,'1990..
j If, during the repair of 1-PT-0934, it becomes apparent that-the integrated
- period of operation under this waiver is likely toLexceed 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />,:you will i
.need to contact this office prior to exceeding the total integrated period.of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> so that a reconsideration of the basis for the temporary waiver of compliance'can be conducted.
[
Sincerely, l
iy*9 -
Original Signed By.
Thomas P,Gwynn j
Samuel J. Collins, Director l
Division of Reactor Projects i
L
Enclosure:
' TV Electric Letter TXX-90263 l
b cc w/o
Enclosure:
(see next page) 4
/V
.RIV:PE':PSB C:PSB R
D RP ATHowell:bh DDCham BBoger WSJQqllins 7/f6/90 7/.:6/90 7/ r/90,
d 7/c4/90 9008030127 900725
/
gDN ADOCK osoorg45 h' t,.
j
,(
ki:f q'
.Q 9,
'M!(
> ' 'TU Electric; Q
l
" TU Electric
" ATTN:
Roger D.: Walker, Manager, l
P-Nuclear Licensing.
-Skyway Tower,
?
'400 North Olive Street, L.B. 81 L
- Dallas, Texas 75201' LJuanita Ellis P
- President - CASE 14261 South Polk Street i
. Dallas.-Texas :75224-l jGDS Associates. Inc.
JSuite 720 1850 Parkway Place.-
.Marietta, Georgia 30067-8237
~I
'. Billie Pirner Garde. Esq.
- .,. Robinson' Robinson. et. al.
i 103 East College Avenue 1Appleton, Wisconsin 54911 q
TU Electric Bethesda Licensing 3 Metro Center,' Suite 610
'Bethesda, Maryland 20814 1
Heron,' Burchette, Ruckert, & Rothwell j
ATTN:- William A. Burchette, Esq.
j Counselt for. Tex-La Electric Cooperative of. Texas j
1025 Thomas' Jefferson St., N.W.
~
F-Washington, D.C. -20007 1
F E MF. 0ttney.
,)
^
- P.0., Box 1777
~
, Glen; Rose, Texas 76043 y
JNewman'& Holtzinger, P.C.
ATTN: 1 Jack R. Newman, Esq.
l L1615 L. Street, N.W.
Suite'1000.
1 Washington, D.C..-20036
' Texas Department.of Labor & Standards ATTN:
G. R. Bynog, Program Manager /
3
-Chief Inspector t Boiler Division P.O. Box'121.57 Capitol Station Austin, Texas' 78711-
't i
?
.f,o s'
@y.
Oc,
] ;;. ?
~[,,
n
.TU Electric i Honorable George' Crump p". <
County Judge Glen-Rose,. Texas fe043 Texas Radiation Control-Program Director 1100 West 49th Street N
- . f-lbccl;to1DMB7(IE51)?'7,J bec distrib..by RIV w/
Enclosure:
R. D. Martin.
. Resident' Inspector (2) 0
~SectionChief(DRP/B)
RIV' Files DRSS-FRPS Lisa Shea, RM/ALF T. Murley, NRR (MS: 12D1)
B. Boger, NRR (MS:- 14A2)
J.;Lieberman,OE(MS: 7H5).
C. Grimes, NRR (MS:
13H15) 3 M.~ Fields,NRR-(MS:
13H15)
J. Wilson, NRR (MS:
13H15)
~I A. Mendiola, NRR (MS;14A2).
j l
.1 u
+
i
?i i
z.