ML20247N795

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-68 & 50-446/89-68 on 890814-18.No Violations or Deviations Noted
ML20247N795
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/14/1989
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20247N797 List:
References
NUDOCS 8909260302
Download: ML20247N795 (4)


See also: IR 05000445/1989068

Text

_

_ - - _ - _ _ _ . _ - - _ -__ ____ -

3;#.r

w

{ '

SEP 141989

In Reply Refer!To: DOCUMENT CONTAINS

g Dockets: 50-44'5/89-68 SAFEGUARDS INFORMATION J

50-446/89-68

,

[ l

TV Electric l

ATTN: W. J. Cahill, Jr. , Executive

Vice President, Nuclear .

Skyway Tower  !

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

This refers.to the inspection conducted by Messrs. A. B. Earnest and

J. A. Kelly of this office during the period August 14-18, 1989, of activities

authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussion of our findings

~

with members o,f your staff at the conclusion of the inspection.

The inspection reviewed certain areas of your physical security program.

Within these: areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

'We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The material enclosed herewith.contains Safeguards Information as defined by

10 CFR Part 73.21 ar.d its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

8909260302 8909144 5

PDR ADOCK 050

. RI SEPS C:SEPSg C:RPBd D:D

hABB phgh

NRR[

A r e t:jt JAKell h DAPowevs BMurraye RFWrnick

'] $/89 9 /g3 /89 9/s)/89 't/13 /89 9/1[/89 9//f/89

ENCLOSURE CONTAINS 79l'

SAFEGUARDS INFORMATION

DOCUMENT C0NTAlps t 1

UPON SEPARATION THIS

SAFEGUARDS INFORMATION PAGE IS DECONTROLLED (

_ _ _ _

s

a

S."

.r

N .

  1. @w - TU-Electric -2-
  • Should-you~have any questions concerning this inspection, we will be pleased to

. discuss them with you.

Sincerely,

k> N )

. F. Warnick, Assistant Director--

for Inspection Programs

Comanche Peak Project Division-

Office of Nuclear. Reactor Regulation

~ Enclosure:

. Appendix - NRC Inspection Report

50-445/89-68

50-446/89-68

cc w/ summary r> age only:

TU Electric ~

= ATTN: Roger D. Walker, Manager,

, .

Nuclear Licensing

Skyway. Tower.

' 400 North Olive Street, L.B. 81

Dallas, TX 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, TX 75224

GDS Associates, Inc.

Suite 720

1850-Parkway Place

Marietta, GA 20067-8237

Billie Pirner Garde, Esq.

Garde Law Office-

104 East Wisconsin Avenue

Appleton, WI 54911

TU Electric

Bethesda Licensing

3' Metro Center, Suite 610

Bethesda, MD 20814

(cc's continued)

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION l

UPON SEPARATION THIS

PAGE IS DECONTROLLED

- __-___ -_-_ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ - - _ _ = - _ _ _ _ _ _ _ _ _ _ _

- - _ - - - - _

_ - _ - -_ __

gp *

.("

,,

w :~

lS"

..o,

~

f ;L

Eh .

..

AN" 'TU Electric ~ -3-

Ai' 4

.,1

y.

Heron, Burchette, Ruckert, & Rothwell

ATTN: LWilliam A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington,.DC 20007

E. F. Ottney

P.O. Box 1777

Glen Rose, TX '76043

Newman & Holtzinger,.P.C.

ATTN: . Jack R. Newman, Esq.

1615 L. Street, ' N.W.

' Suite 1000 ,

Washington, DC 20036

Texas Department of Labor & Standards

ATTN: G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

~

P.O. Box 12157, Capitol Station

Austin, TX '78711

Honorable George Crump'

County Judge

Glen Rose, TX 76043

Texas Radiation Control Program Director

bcc copy of entire report:

RIV Security File

P. A. Starcher, RSGB/NRR

R. D. Martin, RA

B. Beach, DRSS

R. F. Warnick, AD:CPPD:0SP

' Chief, RPB

Section Chief, SEPS:RPB-

Security Inspectors

Resident Inspector

SEPS:RPB File

G. F. Sanborn, E0-

bec copy of letter and inspection summary only w/766:

DRP- RIV File

MIS. Lisa Shea, RM/ALF

RSTS Operator Site Reading

J. Wiebe J. Livermore

C..Vandenburgh

!

'

ENCLOSURE CONTAINS -

SAFEGUARDS INFORMATION

UPON SEPARATION THIS .

. .. ..

PAGE lS DECONTROU.ED

.

[r j.

,.' ,

.

TU Electric -4- l

bec copy of letter and inspection summary only w/out 766:

.DMB IE-04

DRS

A. Vietti-Cook F. Miraglia

J. Partlow J. Taylor

C. Grimes J. Lyons

M. Malloy E. Jordan

B. Hayes J. Gilliland

i

P. McKee J. Moore, OGC

ADSP Reading (Mail 7-D-24) CPPD Reading (HQ) (Mail 7-H-17)

LPDR CPPD-LA J. Wilson .

M. Fields D. Crutchfield

B, Grimes

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLED j

4