ML20059J617
| ML20059J617 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/11/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20059J623 | List: |
| References | |
| NUDOCS 9009200096 | |
| Download: ML20059J617 (3) | |
See also: IR 05000445/1990030
Text
-.
_.
.
h
.:
.
-
SEP l i 1990
'
In Reply Refer To:
Dockets: 50-445/90-30
50-446/90-30
l
l
t
TV Electric
l
ATTN:
W. J. Cahill, Jr., Executive
i
Vice President, Nuclear
Skyway Tower
400 North Olive Street, L.B. 81
i
Dallas, Texas 75201
j
i
Gentlemen:
i
This refers to the inspection conducted by Mr. R. A. Caldwell of this office
,
during the period July 23 through August 2,1990, of activities authorized by
i
NRC Operating License NPF-87 and Construction Permit CPPR-127 (Units 1 and 2)
a
for the Comanche Peak Steam Electric Station, and to.the discussion of our
findings with members of your staff at the conclusion of the inspection.
The inspection reviewed certain areas of your physical security program.-
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspector. The inspection findings are documented in the
enclosed inspection report.
,
Within the scope of the inspection, no violations or deviations were
identified.
'-
'
Should you have any questions concerning this inspection, we will be pleased to
!
discuss them with you.
Sincerely,
'
T. R, -fo h nSon .
Fo r
Samuel J. Collins, Director
'
Division of Reactor Projects
Enclosure:
Appendir - NRC Inspection Report
)
50-U U 90-30
l
50-446/90-30
>
!
I
RIV:SEPShb
C:SEPS[
i
- 0RS
D
RACaldwelT:1m
DAPowers
BBeac
pS ollins
i
'
,
l
g/g/90
C /23/90
q/g/9
g
o / g/90
,
!
v
l
0 ? G4.3
9'
I-
9009200096 900911" ~
ADOCK 05000445
-
'
l
0
PNU,
,
!
,-
.',
,
,
t
!
TV Electric
-2-
,
!
?
cc w/ enclosure:
TV Electric
.
'
ATTN:
Roger D. Walker, Manager,
Nuclear Licensing
Skyway Tower
.
400 North Olive Street, L.B. 81
Dallas, Texas 75201
,
Juanita Ellis
President - CASE
i
1426 South Polk Street
Dallas, Texas 75224
i
GOS Associates, Inc.
,
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
Billie Pirner Garde, Esq.
I
Robinson, Robin >on, et. al.
103 East College Avenue
l
Appleton, Wisconsin 54911
TV Electric
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland 20814
Heron, Burchette, Ruckert, & Rothwell
,
ATTN: William A. Burchette, Esq.
,
l
Counsel for Tex-La Electric
Cooperative of Texas
1025 Thomas Jefferson St., N.W.
Washington, D.C.
20007
.
E. F. Ottney
P.O. Box 1777
'
-
Glen Rose, Texas 76043
Newman & Holtzinger, P.C.
ATTN: Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000
Washington, D.C.
20036
'
.
t
i
k
.
'.
.
,
TU Electric
-3-
,
%
Texas Department of Labor & Standards
ATTN:
G. R. Bynog, Program Manager /
Chief Inspector
Boiler bi,1sion
P.O. Box 12157, C;:iitol Station
. Honorable George Crump
'
County Judge
Glen Rose, Texas 76043
[
Texas Radiation Control Program Director
i'
1100 West 49th Street
'
bec to DMB (IE06)
bec distrib. by RIV:
,
- R. D. Martin
- Resident Inspector (2)
- DRP
- Section Chief (DRP/B)
- Project Engineer (DRP/B)
'
Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- RIV Files
- A. B. Beach
- D. A. Powers
- SEPS File
- DR$5-FRPS
- w/766
[
!
.
.
,
$
&
f
l.
l