Forwards Insp Repts 50-445/90-34 & 50-446/90-34 on 900731- 0807 & Notice of Violation.Action Already Taken to Correct Hot Standby Operating Procedure Inadequacies & No Response to Violation Required
ML20059D651
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/29/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20059D654 List:
References
NUDOCS 9009070133
Download: ML20059D651 (3)


See also: IR 05000445/1990034

Text

'

..

.. .

,

AUB 29 S00

l

!

Reply Refer To:

Dockets:

50-445/90-34

'

50-446/90-34

TV Electric

i

ATTN:

W. J. Cahill, Jr.

Executive Vice President, Nuclear

Skyway Tower

400 North Olive Street, Lock Box 81

<

Dallas, Texas

75201

Gentlemen:

!

This refers to the special team inspection conducted by Messrs. A. T. Howell,-

i

D. L. Kelley, D. N. Graves, and R. B. Vickrey during the period July 31 through-

August 7, 1990, of activities authorized by NRC Facility Operating _

License NPF-87 and NRC Construction Permit CPPR-127 for the Comanche Peak Steam

Electric Station, Units 1 and 2, and to the discussion of our findings with you

and other members of your staff at the conclusion of the inspection.

~

i

This inspection was conducted to review the circumstances following a. safety

,

injection event at Comanche Peak Steam Electric Station (CPSES), Unit 1, on

'

July 30,1990.

1

The enclosed copy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During this inspection, it was found-that certain of your activities were in

1

violation of NRC requirements. This violation would normally be considered as

noncited per 10 CFR 2, Appendix C, criteria; however, although your staff

identified the violation and promptly corrected it, this violation was

potentially more significant because the operability of all four atmospheric

relief valves could have been affected by the presence of water from isolated

main steam isolation valve (MSIV) upstream drippots.

Since action has already

_

been taken to correct the hot standby operating procedure inadequacies, no

'

response to this violation is required.

During this inspection, you committed in an Augus't 4, 1990, letter to NRC

Region IV (TXX-90283) to implement a design modification to remove the local

switches for the essential lights, as appropriate. We, thereby, request that

you provide, in writing, to NRC Region IV, a schedule for the implementation of

this design modification, as well as a description of any interim measures that

you deem appropriate to ensure that all essential lighting remains energized

until such time that the design modification can be implemented. We request

that you provide this information within 30 days of the date of this letter.

pC:DRP/PN

RI :DR B:RI

Rf

0

DR

DRS:T

DRP

D-

AHowell:ww

DGraves

RV ekrey DKell

DChamberlain

TGwynn

C

ns

8/rl/90

$ /27 /90

f/fy/90 $ /fl/90

t/$/90

[/)f/90

000CO

[

/

$ 0 *$0$2R Pso$N4s

G

PNU

e'

..

TV Electric

-2-

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of_1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

,

NRC Public Document Room.

l

Should you have any questions concerning this inspection, we will be pleased to

discuss-them with you.

Sincerely,

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure;:

'

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-445/90-34; 50-446/9 M 4

cc w/ enclosures:

TV Electric

ATTN:

Roger D. Walker, Manager,

Nuclear Licensing

Skyway Tower

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

Billie Pirner Garde, Esq.

Robinson, Robinson, et al,

103 East College Avenue

Appletor., Wisconsin 45911

I

.

T

.

, .

,

TV Electric

-3-

TU Electric

Bethesda Licensing

3 h:tro Center, Suite 610

Bethes'J, Maryland 20814

l

i

Heron, Burchette, Ruckert, & Rothwell

ATTN: William A Burchette, Esq.

I

Counsel for Tex-La Electric

Cooperative of Texas-

1025 Thomas Jefferson St., N.W.

Washington, D.C.

20007

E. F. Ottney

P.O. Box 1777-

Glen Rose, Texas 76043

i

-

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

-1

1615 L. Street, N.W.

_,

Suite 1000

i

Washingtin, D.C.

20036

,

Texas Department of Labor & Standards

l

'

ATTN:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

y

Austin, Texas 78711

$

Honorable George Crump

'

County Judge

-i

Glen Rose, Texas 76043

.

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

,

bec to DMB (IE01)

'

bec distrib. by RIV:

  • R. D. Martin

'* Resident Inspector (2)

  • DRP
  • DRS
  • Section Chief (DRP/B)
  • Project Engineer (DRP/B)
  • DRSS-FRPS

Lisa Shea, RM/ALF-

  • MIS System
  • RSTS Operacor
  • RIV Files

J. Lieberman, OE

G. F. Sanborn, E0

,

  • w/766

)