ML20206F571
| ML20206F571 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/30/1999 |
| From: | Good G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Terry C TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20206F575 | List: |
| References | |
| 50-445-99-06, 50-445-99-6, 50-446-99-06, 50-446-99-6, NUDOCS 9905060171 | |
| Download: ML20206F571 (5) | |
See also: IR 05000445/1999006
Text
,
________ - ___ - - _ - _
..
g**"%,\\
UNITED STATES
NUCLEAR REGULATORY COMMISSION
y
.
5-
-.E
REGloN IV
611 RYAN PLAZA DRIVE, SUITE 400
W ,,,g
ARUNGToN, TEXAS 76c11-8064
' April 30, 1999
Mr. C. L. Terry
TU Electric
Senior, Vice President & Principal Nuclear Officer
ATTN: Regulatory Affairs Department
P.O. Box 1002
Glen Rose, Texas 76043
SUBJECT: NRC INSPECTION REPORT NO. 50-445/99-06; 50-446/99-06
Dear Mr. Terry:
This refers to the inspection conducted on March 29 through April 2,1999, at the Comanche
Peak Steam Electric Station, Units 1 and 2 facilities. The purpose of this inspection was to
focus on the radiation protection program activities during the Unit 2 refueling outage. The
enclosed report presents the results of this inspection. A telephonic exit meeting was
conducted with members of your staff on April 28,1999.
In general, the radiation protection program was well implemented. However, a number of
problems were identified by the NRC. These included three examples of failing to survey, three
examples of failing to fully evaluate the use of temporary shielding, two instances of failing to
post hot spots, and two occurrences in which personnel did not respond to continuous air
monitor audible and visual alert / fault alarms.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred. The first violation involved three examples of failure to perform
radiological surveys, and the second violation involved the failure to perform complete
radiological evaluations on temporary shielding packages. These violations are being treated
as non-cited violations (NCVs) consistent with Appendix C of the Enforcement Policy. These
NCVs are described in the subject inspection report, if you contest the violation or severity
level of these NCVs, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region
IV, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room.
f
,
9905060171 990430
ADOCK 05000445
I
G
o
o
.
.
TU Electric
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Since ly,
-
'
h
Gail M. Good,
ief
Plant Support Branch
Division of Reactor Safety
Docket Nos.: 50-445
50-446
License Nos.: NPF-87
NPF-89
Enclosures:
NRC Inspection Report No.
50-445/99-06;50-446/99-06
cc w/ enclosures:
Mr. Roger D. Walker
TU Electric
Regulatory Affairs Manager
P.O. Box 1002
Glen Rose, Texas 76043
Juanita Ellis
President - CASE
1426 South Polk Street -
Dallas, Texas 75224
George L. Edgar, Esq.
1800 M. Street, NW
Washington, D.C. 20036
G. R. Bynog, Program Menager/
Chief Inspector
Texas Department of Licensing & Regulation
)
Boiler Division
i
P.O. Box 12157, Capitol Station
j
i
County Judge
P.O. Box 851
j
Glen Rose, Texas 76043
!
i
l
,
v.
O'
1Q
. TU Electric
-3-
Texas Radiation Control Program Director .
1100 West 49th Street
-John Howard, Director
- Environmental and Natural Resources Policy
- Office of the Governor-
' P.O. Box 12428
i
i
!
!
i
i
l
!
c
1
.
TU Electric
-3-
E Mail report to T. Frye (TJF)
E Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE06)
bec distrib. by RIV:
Regional Administrator
Comanche Peak Resident inspector (2)
DRP Director
DRS-PSB
.
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
DRS Action item (Golnes)(99 G-00 )
,
Branch Chief (DRP/TSS)
l
l
l
4
2
i
DOCUMENT NAME: R:\\ CP\\CP906RP.JBN.WPD
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
Peer Review,
RIV:PSB[ M
PSB
E
C:DRS\\PSBs
4:DRP\\Af J
-.
,
N. S')/9Md.jD ' JBNicho}ath
JSDodson d
GMGood MMJITaala 'thlpefy
04/W99
04M99 (/N 04/M/99
04/7)l99 (dW 04M 99 f
U
'F
F
'
OFFICIAL RECORD COPY
W
V
000037
J
.
.
TU Electric
-3-
! E-Mall report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
' E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK) ,.
bec to DCD (IE06)
, bec distrib. by RIV:
Regional Administrator
Comanche Peak Resident inspector (2)
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
DRS Action item (Goines)(99-G-00 )
Branch Chief (DRP/TSS)
1
i
1
i
)
l
DOCUMENT NAME: R:\\_CP\\CP906RP.JBN.WPD
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy
RIV:PSB[ M
PSB
E
C:DRS\\PSBs
4:DRPW/ J
Peer Review,
-
,
f
Pf,5"),W M R.Yd' JBNichokut/r
JSDodson ad
GMGood GWMJITa aja '(%hejfv
04/W99
7
04#W99 ( F 04//t/99
04$99 [(47 0@99 [
U
F
'
OFFICIAL RECORD COPY
V
V
'
J