ML20135H744
| ML20135H744 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/18/1985 |
| From: | Denise R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Spence M TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20135H745 | List: |
| References | |
| NUDOCS 8509240189 | |
| Download: ML20135H744 (2) | |
See also: IR 05000445/1985008
Text
,
.
.
_
st
-
~
g
j,
In'ReplyReferTo:
SEP 181985
-
Docket:
50-445/85-08
-
't.
,
k-
Texas Utilities Electric Company
?~
ATTN:
M, D Spence, President TUGC0
Skyway Tower
>
'400 North Olive Street
4
Lock Box 81
Dallas, Texas 75201
,
Gentlemen:
,
1
iThis refers to the inspection conducted by' Messrs. D. L. Kelley and W. F. Smith
of this office during the period May 1 through July 31, 1985, of activities
i
authorized by NRC Construction Permit CPPR-126 for the Comanche Peak Facility,
1
5 Unit 1, and to the discussion of our findings with Messrs. W. G. Counsil, J. C.
'
Kuykendall and other members of your staff at the conclusion of the inspection.
Areas"'6xanined during the inspection included:
(1) verification of correction
4
of human erigi'neering deficiencies; (2) applicant actions on previous inspection
findings; (3) plant to'urs, and (4) plant status.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the' inspectors.
These
findings are documented in the enclosed-inspection report.
Within the sc# ope of the inspection, no violations or deviations were
.
identified.
,
I
Should you have any questions concerning this inspection, we will be pleased to
4
(
discuss them with you.
'
Sincer8hhal Signed By:
,
_
N
(
Richard P. Denise
,
- '
.
'
<N
R. P. Denise, Director
Division ~of Reactor
,
,
'
'
Safety and Projects
<
Enclosure:
.
-
Appendix - NRC Inspection Report
50-445/85-08
f
cc w/ enclosure: (see next page)
RIV:SRIY
RRI k
CPTG 7
DRSP
TRT
g
p].
>
JLKelly
WFSmith
TFWesterman
RPDenise
VSNoonan
- t/p/85
, 7 /q/85
V//7 /85
( /
85
/
5
e
a
y
y
i t
,
-
.
'
r3509240189 850919
'
,
,
ADOCK 05000445
'
G
<
'
'
, , ,
' )_ Y
~
.
.
- -
-
.
4
Utilities Electric Company
-2-
cc w/ enclosure:
- Texas Utilities Electric Company
ATTN:
J. W. Beck, Vice President
Licensing, QA and Fuel Management
Skyway Tower
400 North Olive Street
'
Lock Box 81
Dallas, Texas 75201
Texas Utilities Electric Company
ATTN:
W. G. Counsil, Executive
Vice President, Nuclear
.
'
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas,-Texas
75201
bec to DMB (1E01)
bec distrib. by RIV:
.-
- RPB_
- MIS System
- RSB
- RSTS Operator
- RRI-OPS
- EP&RPB
-
- RRI-CONST
R. Denise, D/DRSP
V. Noonan, NRR
R.. Martin, RA
S. Treby . ELD
C. Wisner,'PA0
Juanita Ellis, Pres. - CASE
- D. Weiss, LFMBB (AR-2015)
Renea Hicks, A/ Atty. General,-
, *RIV File
EP Divs. - TX
T. F.. Westerman, Chief, CPSES
Task Group
>
- w/766
_
$
f