ML20247R580
| ML20247R580 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/26/1989 |
| From: | Warnick R Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20247R583 | List: |
| References | |
| NUDOCS 8910020010 | |
| Download: ML20247R580 (3) | |
See also: IR 05000445/1989063
Text
_
_
_
_ _ _ .
- _ _
_ _ _ _ _ _ _ _ ,
p g
b d' ~ .. i.
?
B~
- .
-
.
SEP 2 61989 ~
g
.In Reply Refer.To:.
Dockets:
50-445/89-63.
50-446/89-63
1
-
Mr'. W.JJ..Cahill,jJr.
Executive Vice President
-TU Electric-
400 North 1Oliv'e Street,' Lock Box 81
..
Dallas, Texas ~.
75201-
+
l Dear Mr. Cahill:l
,
.
Tliis refers to the inspection conducted by Mr. C. Hale and an NRC
iconsultant'during the: period' August-2 through September 5, 1989, of
,s.i
' activities authorized by NRC< Construction Permits CPPR-126 and
CPPR-127 for uthe Comanche Peaik Steam Electric Station, Units .1
and 2, and to the discussion of our findings with you and other
members of your' staff at the conclusion of the inspection.
The enclosed.~ copy of'our inspection report identifies areas
examined during the> inspection.
Within these areas, the inspection
consisted of. selective examination of procedures and representative
records,: interviews with personnel, and observations by the
inspectors.
Within the scope.of the inspection, no.viclations or deviations
2were identified.
'In accord
ce with
FR 2.790 of the Commission's regulations, a
,
'~
copyrof.
is letter and the enclosed inspection report will be
i
placed
the NRC Public Document' Room.
M uld you have any questions concerning this inspection, we will
i
be pleased to' discuss.them with you.
Sincerely,.
Joel S. Wiebe for
)
R. F. Warnick, Assistant Director
j
J
for Inspection Programs
.
.$gogggg gyjhas
Comanche Peak Project Division
g
Office of Nuclear Reactor Regulation
i
'
Enclosure:
Inspection Report 50-445/89-63; 50-446/89-63
cc'w/ enclosure:
See next page
)
,
i
RI:CPPD:NRR
uSI:CPPD:NRRd
AD:CPPD:NRR
M#I
'/
CHale:nh
'I
Livermore
.
RWarnick
<
'
9/16 /89
9 M /89
9/9b/89
-_
--
.-
/
. o
UNITED STATES
4
.
!"),(~{
NUCLEAR REGULATORY COMMISSION
{
- p
WASHINGTON, D. C. 20555
!
...../
SEP 2 6 S?9
+
In Reply Refer To:
Dockets:
50-445/89-63
50-446/89-63
Mr. W. J. Cahill, Jr.
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Cahill:
This refers to the inspection conducted by Mr. C. Hale and an NRC
consultant during the period August 2 through September 5, 1989, of
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective exmnination of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
In accordance with 10 CFR 2.790 of the commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
) $cy
. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Pro 3ect Division
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-445/89-63; 50-446/89-63
cc w/ enclosure:
See next page
_-_____-______ _ _ -
--. _ - _ _ _ - - . _ _
._
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - -
- _ - _ _ _ _ _ _ - - - _ - _ - - - _ _ _ - _ _ _ - - _ _ - _ - _ - _ _ - - _ - _ - . ._
ff
@
x W,'J.
Cahill, Jr.
-1
'
-cc w/enclosurei
"
,
Roger.D. Walker.
TU Electric
.
Manager, Nuclear Licensing.
c/o-Bethesda Licensing
TU Electric
3 Metro Center,; Suite 610
-Skyway Tower
..
Bethesda, Maryland -20814
-400 North Olive Street, L.B.
81
Dallas, TX
75201-
E. F. Ottney
.
P. O.-Box 1777
-Juanita'Ellis
Glen Rose, Texas
76043
. President - CASE
1426 South Polk Street
Jack R. Newman
Dallas, TX- 75224
Newman & Holtzinger-
1615 L Street, NW
Texas Radiation Control'
Suite 1000
Program Director
.
20036
-Texas Department.of Health
1100 West 49th' Street
George R. Bynog
Program Mgr./ Chief Inspector
'
Texas Dept. of Labor &-Standards
GDS' Associates, Inc.
Boiler Division
.
1850' Parkway Place, Suite:720
P.O. Box 12157, Capitol Station
Marietta, GA .30067-8237
78711
Honorable George Crump
County Judge
Glen Rose, Texas
76043'
~Ms. Billie Pirner Garde, Esq.
. Garde Law Office
103 East College Avenue
Appleton, WI -54911
Regional Administrator, Region IV
U.S. Nuclear Regulatory Commission
611 Ryan. Plaza Drive, Suite 1000
Arlington, Texas
76011
William A. Burchette, Esq.
-Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert & dethwell
1025. Thomas Jefferson St., NW
20007
- _ _ - - _ _ - _ _ -
-
--