ML20210R222

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy
ML20210R222
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/12/1999
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20210R226 List:
References
50-445-99-10, 50-446-99-10, NUDOCS 9908170054
Download: ML20210R222 (6)


See also: IR 05000445/1999010

Text

. .

$*"%g

UNITED STATES

3

&

NUCLEAR REGULATORY COMMISSION

4

?,

{

p

REGloN IV

%

I

611 RYAN PLAZA DRIVE. sulTE 400

% , , , , , '#

ARLINGTON, TEXAS 760118064

August 12,1999

EA 99-197

EA 99-203

Mr. C. L. Terry

TXU Electric

Senior, Vice President & Principal Nuclear Officer

ATTN: Regulatory Affairs Department

P.O. Box 1002

-

Glen Rose, Texas 76043

SUBJECT: NRC INSPECTION REPORT NO. 50-445/99-10; 50-446/99-10

i

Dear Mr. Terry-

l

This refers to the inspection conducted on May 10-14 and 24-28,1999, at the Comanche Peak

,

Steam Electric Station, Units 1 and 2, facilities. Additional review and inspection was performed

{

'

in the Region IV Office until June 28,1999. This inspection assessed your fire protection

'

program, safety evaluation program, and component cooling water system for conformance to

applicable regulatory requirements for the Comanche Peak facility. The enclosed report

l

presents the results of this inspection.

l

l

At the end of the onsite period of the inspection, the team leader briefed you and members of

your staff on May 28,1999. Following the onsite inspection, your staff provided the inspection

'

team with additional requested information on June 4 and 14,1999. Telephone conferences

were conducted with your staff on June 8 and 18,1999. An inspection exit meeting was

conducted at the Comanche Peak facility on June 28,1999. A supplemental telephonic exit

j

was held on August 12,1999.

Overall, we found that your safety evaluation and fire protection programs were effectively

implemented. Sections ill (E.2.1) and IV provide the details of our inspection in these areas.

With respect to our inspection of the component cooling water system, overall we concluded

that the system was capable of performing its intended safety function. However, the team

!

identified numerous problems associated with a 1993 modification of the sy: item, as well as,

calculations pertaining to the system. While none of these problems resulted in the

inoperability of the component cooling water system, extensive reviews had to be conducted to

demonstrate that the system and the associated safety-related components serviced by the

system remained operable. Examples of problems identified by the team included: improper

assumptions and design input affecting the results of design calculations; inconsistencies in a

modification safety evaluation; inadequate post-modification testing acceptance criteria; a

missing instrument uncertainty calculation; instances of failing to update a design calculation;

and failing to account for component cooling water pump degradation in design limits.

170014

9908170054 990812

PDR

ADOCK 05000445

G

PDR

L.

.

TXU Electric

-2-

In addition to the problems noted with engineering work products associated with the

component cooling water system, the team also identified a Unit 1 safety-related battery

surveillance which was not completed within the technical specification required surveillance

interval. This finding resulted in the granting of enforcement discretion by the NRC's Office of

Nuclear Reactor Regulation. The failure to perform the required technical specification

surveillance requirement was apparently caused by the failure of engineering personnel to

correctly interpret the technical specification surveillance requirements. In addition, we do not

agree with your position documented in your June 10,1999, Licensee Event Report (LER)

50-445/99-003-00. This LER indicated that TXU believes that crediting the battery performance

I

discharge test in the Unit 1 sixth refueling outage was acceptable relative to demonstrating

l

compliance with the subject technical specification.

The team also identified instances of failure to properly implement aspects of your temporary

modification program. Hardware and procedure changes had been implemented without the

required evaluation, and required walkdowns of temporary modifications were not performed as

required.

The nature and scope of the problems associated with the 1993 modification of the component

cooling water system may be indicative of similar types of problems associated with

,

modifications of other safety-related structures, systems, or components. Accordingly, we

j

encourage you, in evaluating the findings documented in this report, to consider the generic

l

implications, if any, associated with these findings.

Based on the results of this inspection, the NRC has determined that violations of NRC

requirements occurred. Three of these violations are being treated as noncited violations,

j

consistent with Appendix C of the Enforcement Policy. In regard to another violation involving

i

your fire protection program, discretion is being exercised after consultation with the Office of

Enforcement pursuant to Section Vll.B.6 of the Enforcement Policy and a violation is not being

'

issued. The noncited violations are described in the subject inspection report. if you contest

any of the violations or severity level of the noncited violations, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United

,

States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident

inspector at the Comanche Peak facility,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

,

l

t

.

.

. TXU Electric

-3-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

>

dJaPw

Arthur T. Howell 111, Director

Division of Reactor Safety

Docket Nos.: 50-445;50-446

License Nos.: NPF-87; NPF-89

Enclosure:

NRC Inspection Report No.

50-445/99-10;50-446/99-10

cc w/ enclosure:

Mr. Roger D. Walker -

TXU Electric

Regulatory Affairs Manager

P.O. Box 1002

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regu!ation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

County Judge

P.O. Box 851

Glen Rose, Texas 76043

-

,

.

TU Electric

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector (2)

DRP Director

DRS Director

MIS System

Branch Chief (DRP/A)

RIV File

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

{

\\

DOCUMENT NAME: R:\\_CPSES\\CP910RP. JEW.WPD

To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:SR!:EMB

SRI:EMB

l

SRl:EMB

SRI:PBA l

C:EMB l

C:PBA l

D:DRS

JEWhittemore/imb* LEEllershaw*

CEJohnson* RLBywater*

DAPowers* JITapia* ATHowelld

07/09/99

07/09/99

07/08/99

07/02/99

07/09/99

07/12/99 Cg/r2/99Q

Previously concurred

OFFICIAL RECORD COPY

Y

.

.

..

TXU Electric

-4-

Texas Radiation Control Program Director -

-- 1100 West 49th Street

Austin, Texas 78756

John Howard, Director -

' Environmental and Natural Recources Policy

~ Office of the Governor

P.O. Box 12428

Austin, Texas 78711

l

l

.

.

TU Electric

-4-

1

l

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01) '

bec distrib. by RIV:

Regional Administrator

Resident inspector (2)

l

DRP Director

1

DRS Director

MIS System

i

Branch Chief (DRP/A)

l

RIV File

j

Project Engineer (DRP/A)

~

Branch Chief (DRP/TSS)

i

i

l

DOCUMENT NAME: R:\\_CPSES\\CP910RP. JEW.WPD

l

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

'

RIV: SRI:EMB

SRI:EMB

SRI:EMB

SRI:PBA

C:EMB

C:PBA

D:DRS

JEWhittemore/imb* LEEllershaw*

CEJohnson* RLBywater*

DAPowers* JITapia* ATHowelld

07/09/99

07/09/99

07/08/99

07/02/99

07/09/99

07/12/99 (3/r2./99%

Previously concurred

. OFFICIAL RECORD COPY