Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20217M571
Person / Time
Site: Comanche Peak  
Issue date: 10/20/1999
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20217M574 List:
References
50-445-99-15, 50-446-99-15, NUDOCS 9910270251
Download: ML20217M571 (4)


See also: IR 05000445/1999015

Text

{{#Wiki_filter:! { . g*"% ' UNITED STATES k NUCLEAR REGULATORY COMMISSION

e REGloN IV k*.,q,q 8 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 ,,,g 0CT 201999 Mr. C. L. Terry TXU Electric l Senior Vice President & Principal Nuclear Officer ATTN: Regulatory Affairs Department ! P.O. Box 1002 Glen Rose, Texas 76043 SUBJECT: NRC REPORT NO. 50-445/99-15; 50-446/99-15 4 i Dear Mr. Terry: This refers to the inspection conducted on August 22 through October 2,1999, at the Comanche Peak Steam Electric Station, Units 1 and 2, facility. The enclosed report presents the results of this inspection. During this 6-week inspection period, activities at your facility were generally characterized by safety-conscious operations, sound engineering and maintenance, and acceptable radiological controls, with noted exceptions. Based on the results of this inspection, the NRC has determined that two Severity Level IV violations of NRC requirements occurred. These violations are being treated as noncited violations (NCVs), consistent with Appendix C of the Enforcement Policy. These NCVs are described in the subject inspection report. If you contest the violation or severity level of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear Regulatory Commission, Regie' 'V,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, j the Director, Office of Enfon t, United States Nuclear Regulatory Commission, ' " , Washington, DC 20555-0001 J the NRC Resident inspector at the Comanche Peak Steam Electric Station, Units 1 and 2, iucility. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response, if requested, will be placed in the NRC Public Document Room (PDR). Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, l i r i ./' [ W . Jo 1. apia,'Ch f Project Branch A Division of Reactor Projects , ! 9910270251 991020 PDR ADOCK 05000445 0 PDR i

. TXU Electric -2- Docket Nos.: 50-445 50-446- License Nos.: NPF-87 NPF-89 t. Enclosure: . NRC Inspection Report No. 50-445/99-15;50-446/99-15 cc w/ enclosure: Roger D. Walker TXU Electric . , Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 , Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 George L. Edgar, Esq. Morgan, Lewis & Bockius 1800 M. Street, NW - Washington, D.C. 20036 - G. R._ Bynog,' Program Manager / Chief Inspector. Texas Department of Licensing & Regulation Boiler Division P.O. Box 12157, Capitol Station

Austin, Texas 78711

- County Judge . P.O. Box 851 Glen Rose, Texas 76043 ' Chief, Bureau of Radiation Control' Texas Department of Health 1100 West 49th Street Austin, Texas 78756-3189 . John L. Howard, Director- > . Environmental and Natural Resources Policy - Office of the Governor P.O. Box 12428 Austin, Texas 78711-3189

[ ,s !! }

6

.TXU Electric -3- OCT 201999 E-Mail report to D. Lange (DJL) E-Mail report to NRR Event Tracking System (IPAS) E-Mail report to Document Control Desk (DOCDESK) E-Mail report to Richard Correia (RPC) E-Mail report to Frank Talbot (FXT) bec to DCD (IE01) bec distrib. by RIV: Regional Administrator Resident inspector'(2) ' ' DRP Director RIV File ' i l DRS Director RITS Coordinator Branch Chief (DRP/A) Project Engineer (DRP/A) Branch Chief (DRP/TSS) \\ \\ DOCUMENT NAME: R:\\ CPSES\\CP915RP.ATG To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy " RIV: SRI RI C:DRS/PSB C:DRP/A , ATGody -m SCSchwindpoJL GMGood )%V JITapia ML7 10/\\l /99 ~ 10/u)/99 [[ 10/74 99- I2(ow 104.D /99M / t OFFICIAL RECORD COPY V 6;> ,t .) U J J < yncoc ,. l l

) . . TXU Electric -3- OCT 201999 E-Mail report to D. Lange (DJL) E-Mail report to NRR Event Tracking System (IPAS) E-Mail report to Document Control Desk (DOCDESK) E-Mail report to Richard Correia (RPC) E-Mail report to Frank Talbot (FXT) bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector (2) i DRP Director RIV File DRS Director RITS Coordinator Branch Chief (DRP/A) Project Engineer (DRP/A) Branch Chief (DRP/TSS) , ) i DOCUMENT NAME: R:\\_CPSES\\CP915RP.ATG To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV: SRI RI C:DRS/PSB C:DRP/A - m ATGody m SCSchwindpoJL GMGood (,%V JITapia ML-' 10/7a/99 I.cJea- _10(,D /99M 10/\\Q /99 10/u/99 [V d ~ ' OFFICIAL RECORD COPY V i ' - }}