Forwards Insp Repts 50-445/90-31 & 50-446/90-31 on 900807- 0918 & Notice of Violation
ML20058A097
Person / Time
Site: Comanche Peak  
Issue date: 10/10/1990
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20058A100 List:
References
NUDOCS 9010250276
Download: ML20058A097 (4)


See also: IR 05000445/1990031

Text

r

1

[

.1y

'

'

'

[

OCT 101990

l

In Reply Refer To:

Dockets:

50-445/90-31

'

50-446/90-31

TV Electric

ATTN:

W. J. Cahill, Jr.

Executive Vice President, Nuclear

Skyway Tower

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. W. D. Johnson and other members

of the Region IV staff during the period August 7 through September 18, 1990,

of activities authorized by NRC Facility Dperating License NPF-87 and NRC

Construction Permit CPPR-127 for the Comanche Peak Steam Electric Station,

Units 1 and 2, and to the discussion of our findings with you and members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, operational safety

verification, onsite followup of events, maintenance observation, surveillance

'

observation, startup test results review, engineered safety feature system

walkdown, licensee event report followup, followup on previously identified

items, and Unit 2 activities. Within these areas, the inspection consisted of

,

selective examination of procedures and representative records, interviews with

personnel, and observation by the inspectors.

The inspection findings are

documented in the enclosed inspection report.

3

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are_ required to respond to

these violations in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

'

Notice of Violation enclosed with this letter.

In accordance with NRC enforcement policy, a Severity Level IV violation can be

considered for nonciting if appropriate criteria are met. Violation A was

cited in this report because failure to take the appropriate logs specified in

the alarm response procedure was NRC identified.

It is potentially significant

because the total time that an actual high flow condition should be allowed to

exist between eddy current inspections of the steam generator is 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.-

Violation B was cited because it was identified by the inspector and it

represents two additional examples of failure to comply with safety-related

procedures.

RIV:DRP/B:

- RI

RI M

SRI

DRS/0P

DRP/

DRP/B:S

SBitter:ww

DGray

AHowell

RLat

DKelle

REvans

WJohnson

to /io/90

( /o//0/90 #//0/9

0

  1. // /90 #/tD/90

<D /r/90 <0 //o/90

DChamberlain * TGwynn$ D:DRF f

C:D

D DR

SCollins

i

10 flo 190

to /ge /90 in /gn /90

'

)h

c

J ~y

y

-

,

s

i

\\

C010P50D74. 401010

i

PDR

ADDCK 0D00094D

\\

Q

PNU

i

'

~,

,,

,

-

.-

..

,

TV Electric

-2-

In addition,-a violation of Technical Specification 3.4.8.2 was identified.

This involved a failure to properly evaluate pressurizer heatup transients.

However, in accordance with Section V.G 1 of the NRC's Enforcement Policy

(10 CFR Part 2, Appendix C), no citation is being issued and no written

response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC Public Document Room.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Drlginal Slgued By

M h t 0. Cimmberlin

3

Samuel J. Collins, Director

Division of Reactor Projects

Enclosures:.

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-445/90-31; 50-446/90-31

cc w/ enclosures:

!

'

TV Electric

ATTN:

Roger D. Walker, Manager,

Nuclear Licensing-

'

Skyway Towe.-

400 North Olive Street, L.B. 81

Dallas . Texas 75201

-

Juanita Ellis

President - CASE

1426 South Polk Stre: t

'j

-

Dallas, Texas 75224

'

GD$ Associates, Inc.

l

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

_

-

.; .

.. ,

j

..

,

. ,

i=

ll

TV Eleetric-

-3-

.n

Billie Pirner Garde, Esq.

,

Robinson,-Robinson, et. al.

103 East College Avenue

Appleton, Wisconsin 54911

TV Electric

-

Bethesda Licensing

3 Metro Center, Suite 610)

1

Bethesda, Maryland 20814-

w

Heron, Burchette, Ruckert, & Rothwell

,.

f

ATTN: William A. Burchette, Esq.

c

Counsel for Tex-La Electric

Cooperative of Texas ,

.

.

1025 Thomas Jefferson St. . . N.W.

?

Washington, D.C.

20007

,

E. F. Ottney

P.O. Box 1777

Glen Rose, Texas 76043

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

. Texas Department of Labor & Standards

ATTN:

G. R.' Bynog, Program Manager /

Chief-Inspector

Boiler Division

P.O. Box 12157, Capitol. Station

Austin,~ Texas 78711

Honorable George Crump

County Judge

Glen Rose, Texas 76043

Texas Radiation Control-Program Director

1100 West 49th Street

Austin, Texas 78756

,

,

f

, . . , .

,

.

._ ____.. ._

.

-.

. .

,

,

,

,,, . .

..

-f

"

'

' '

r

,.

.

s

,

I

,

.

.

. .

..g-

2

'

I

r/-

-l 1

.s

,

'

'C

- TV Electric.

-4-

i

.i-i

):

-

9;

.

-

~

'i

()

bec to DMB-(IE01)

>

,

y

bec distrib. by RIV:

'j

i

  • R. D. Martin
  • Resident' Inspector'(2)

M!

"

- >

  • DRP

..

-.

'

Lc

' *Section' Chief - (DRP/B).

-*DRS

.

, ,

'

- *DRSS-FRPS

'

  • Project: Engineer (DRP/B).

Lisa Shea,.RM/ALF,

'

'

,

,

L* MIS System

  • RSTS Operator.--

'

'

  • RIV Files

'

+

a d,

y,

g

  • w/766

j

r

\\'

,

' ' '

,*

.;;:

.

,

.

,. f

.

.

.s(

'

, .,

-!

+

,..

.

..

'

.

,i1

1 ' '1

.

'

'

,

'?

3

e

.h

'

,!

,'1

-. t

!

.. t

II

',:

'

'

at

?

t

.

l

?

- ?

i

.)

-

1

,

3

.,

- u

T

,

,

[

>-}

i

a

~

.,

' I

.

4

a

-

. . . ,

Il

. iI

'

i
g

'. t

(

.

'.

i-

.

. ~

-

..-... ..4

. . . .

.

_

. . _ , . . , . _ . _ - . . _ . _ , - . . .

. . . . . . . . . -

. .

. -

.

. . _ , - , .

,

- ~ .

-,,

-