ML20054A473

From kanterella
Revision as of 08:20, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Ebasco Rept Preservice Insp Nondestructive Exam Program Plan & Util Rept Preservice Insp Nondestructive Exam Program Plan Suppl. Conclusions Re Ability to Examine Stainless Steel Pipe Elbows Will Be Provided by 820615
ML20054A473
Person / Time
Site: Byron Constellation icon.png
Issue date: 04/07/1982
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20054A474 List:
References
3831N, NUDOCS 8204150485
Download: ML20054A473 (1)


Text

_ _ _ _ _ _ _

[ e Commonw::lth Edison ons First National Ptza. Chicago. Illinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690 April 7, 1982

'9It[lh s Mr. Harold R. Denton, Director G 0 Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission g: 6C64 'FO  ;

Washington, DC 20555 4pg2

  1. 4d pg ,3

Subject:

Byron Station Unit 1 g Preservice Inspection Y Program Plan  % g NRC Docket No. 50-454 G

Dear Mr. Denton:

This is to provide the program plan for preservice nondestructive examination of the Byron 1 reactor vessel and the associated components and piping systems. The program plan consists of an Ebasco report and a Commonwealth Edison supplement.

As indicated in the Byron SER, additional information will be submitted before the NRC can approve this program plan. Requests for relief from Section XI inspection requirements for vessel pres-sure retaining welds will be submitted by May 15, 1982. Requests for relief fro a inspection requirements for Class 1 and 2 components and piping systems will be submitted by June 15, 1982. Conclu sion s regaroing the ability to examine cast stainless steel pipe elbows will be provided by June 15, 1982.

Please direct further questions regarding this matter to this office.

One (1) signed original and fifteen (15) copies of this letter are provided for your use. Seven (7) copies of the program plan are enclosed.

Very truly yours,

]> $,[^/W T.R. Tramm -

Nuclear Licensing Administrator 1m

Enclosures:

1) " Program Plan Preservice Inspection, Byron Unit 1," Ebasco Services Inc. , Octobe r 15, 1981.
2) " Commonwealth Edison Company, Byron Unit 1 Preservice Inspection, NDE Program Supplement ,"

Ma rch 2 6, 1982.

I 3831' 82041504B5 820407 3 \

PDR ADOCK 05000454 l lj G PDR